Sheet 1 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
FIELD INSTALLATION TESTS
VISUAL INSPECTION
Yes
No
Yes
No
1. Inspect primary and auxiliary equipment for physical damage, missing parts and proper
assembly.
2. Compare equipment nameplate data with one-line, design plans and starter schedule.
3. Check nameplate voltage and current ratings for breakers, contactors and primary and
secondary fuses.
4. Compare overload protection with motor full load current for proper sizing.
5. Verify component sizing versus load.
6. Check contactor finger stab alignment and tightness on draw-out designs.
7. Protective grounding is correctly installed and connected to main ground.
8. Remove shipping and blocking material from starter and vertical sections.
9. Check draw-out cubicles and wire ways for cleanliness.
MECHANICAL INSPECTION
1. Torque all accessible bolted connections.
2. Check insulators and the insulation system.
3. Inspect main bus and bus taps to switches and potential transformers.
4. Manually operate breakers and contactors. Check for freedom of movement of all
moving parts.
5. Check for main contact pressure alignment and full contact area on contactors.
6. Check operation of door mechanical interlocking linkage.
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 2 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
ELECTRICAL INSPECTION
Yes
No
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 3 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
NAMEPLATE INFORMATION
Equipment Identification/manufacturer
Serial number/model number
Rated Voltage
Rated current
Interrupting Rating
(TEST PERFORMED IN ACCORDANCE WITH VALUES RECOMMENDED BY VENDOR OR VALUES IN P-000)
ITEMS TESTED
Phase A to Ground
Phase B to Ground
Phase C to Ground
Phase A to Phase B
Phase B to Phase C
Phase C to Phase A
MOTOR CONTROL CENTER CONTACT RESISTANCE
FEEDER NO.
Witness
Signature & Date
Breaker or
Contactor No.
PDD
Phase A Line to
Load micro-ohms
Inspection
Phase B Line to
Load micro-ohms
Phase C Line to
Load micro-ohms
Operation/Maintenance
Contractor
Sheet 4 of 4
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
HORSE
POWER
Witness
Signature & Date
FULL
LOAD
CURRENT
PDD
MOTOR
PROTECTION
RELAY TYPE
Inspection
RATING
FEEDER
NO.
Operation/Maintenance
FEEDER
INSULATION
RESISTANCE
Contractor