SAUDI ARAMCO PRE-COMMISSIONING FORM


METAL ENCLOSED BUS
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
FIELD INSTALLATION CHECK LIST

VISUAL AND MECHANICAL


Yes

No

Yes

No

1. Inspect the entire assembly, including auxiliary equipment, for any apparent damage or
missing parts.
2. Remove shipping blocks, braces and parts.
3. Inspect for proper bracing, suspension alignment and enclosure ground.
4. Torque the connections as per manufacturer recommendations or per values in P-000.
5. The bus shall be inspected for physical damage and proper connection in accordance
with the single line diagram.
6. Check the location and type of drain plug.
7. Check current rating (cross section) of flexible connectors used at transformer and or
switchgear terminations of metal-enclosed bus.
ELECTRICAL TESTS
1. Measure insulation resistance of each bus run phase to phase and phase to ground for
one (1) minute. Test voltage and minimum acceptable values in accordance with P-000
2. Perform A. C. high potential tests on each bus run phase to phase and phase to ground.
Potential application shall be in accordance with manufacturer's instructions or as
specified in P-000.
3. Perform phase rotation and phase cross voltage tests on each bus tie section energized
by separate sources. Performed tests when bus sections are powered by permanent
source.
4. Measure bus joint resistance.
5. Connect space heaters and check operability (when applicable).
6. Verify operation of heater ammeter and control power switch.

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

Form No. P- 063 Issue Date: March 2006

Sheet 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


METAL ENCLOSED BUS
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
Field Test Record

Bus phase
Phase A to Ground (BUS 1)

Megger Test Results

High Potential Test Results

Phase B to Ground (BUS 1)


Phase C to Ground (BUS 1)
Phase A to Phase B (BUS 2)
Phase B to Phase C (BUS 2)
Phase C to Phase A (BUS 2)

Number of bus joints____________________________________


Joint no.

Resistance

Joint no.

Resistance

Joint no.

Resistance

Phase Rotation
Measured Voltage
Voltage Phase A BUS 1 to Phase A BUS 2
Voltage Phase B BUS 1 to Phase B BUS 2
Voltage Phase C BUS 1 to Phase C Bus 2

Witness
Signature & Date

PDD

Inspection

_________________
_________________
_________________

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor