PESHAWAR.
SUB WORK :- STRENGHTING OF EXRTERNAL BOUNDARY WALL AT IMAMIA MASJID PHASE-V
HAYATABAD, PESHAWAR.
ABSTRACT OF COST
PART-A
S.No
ITEM OF WORK
MRS-2015 Quantity
1 Excavation in foundation of building,bridges and
other
structure
including
dag
belling,dressing,refilling around structure with
excavated earth,watering & ramming lead upto
50 m and lift upto 1.5 m. ( In Shingle/ Gravel )
3-23-d
156.330
2 P/L plain cement concrete (1:4:8)
including
placing,compacting,finishing,
curing
etc,complete as per direction of engineer
6-05-I
9.771
incharge.
3 Reinforced cement concrete in roof slab,
beams,columns, lintels,girders and other
structural members laid in situ or precast
laid in position or prestressed members
cast in situ, complete in all respect
Type-C (1:2:4)
06-06-b-03 29.312
4 Reinforced cement concrete in roof slab,
beams,columns, lintels,girders and other
structural members laid in situ or precast
laid in position or prestressed members
cast in situ, complete in all respect
Unit
Rate (Rs.)
Amount (Rs.)
303.71
47478.98
5316.24
51944.98
8189.30
240044.76
06-06-a-03
97.706
9074.66
886648.73
6-07-c
10.00
Tonne
121899.37
1218993.70
Type-C (1:2:4)
S & Fabricate MS re-inforcement for cement
concrete I/c cutting,bending,laying in position
making joint and fastening I/c cost of binding
of steel reinfocement (also I/c removal of
rust from bars) Deformed Bars Grade-40
Pacca brick work in foundation and plinth
7-04-a-05
6.691
7608.81
50910.55
07-07-a-03
06-05-f
13.381
13.381
M
3
M
8300.40
6997.38
111067.65
93631.94
11-11-b
641.264
M2
229.50
147170.09
11-18-a+1131
117.10
M2
282.70
33104.17
25-47-b
14.87
M2
8441.35
125522.87
M2
280.82
360159.51
13-38(a+b) 1282.528
NSI
Nos
85000.00
Total Rs= >
170000.00
3536677.94
ABSTRACT OF COST
PART-B
SUB WORK :- WATCH TOWER / CHECK POST
Quantity
Unit
Rate (Rs.)
Amount (Rs.)
8.496
303.71
2580.32
3.08
5316.24
16374.02
06-06-b-03
2.436
8189.30
19949.13
06-06-a-03
8.553
9074.66
77615.57
6-07-c
1.29
Tonne
122899.37
158540.00
10-22-a
21.0040
M2
1182.99
24847.52
7
8
9
Type-C (1:2:4)
Reinforced cement concrete in foundation
laid in position or prestressed members
cast in situ, complete in all respect
Type-C (1:2:4)
S & Fabricate MS re-inforcement for cement
concrete I/c cutting,bending,laying in position
making joint and fastening I/c cost of binding
of steel reinfocement (also I/c removal of
rust from bars) Deformed Bars Grade-40
P/L 1/2" thick Mosaic flooring in floors using
grey cement consisting of 1/2" mosaic
topping of one part of cement and marble
powder in the ratio of (3:1) & two parts of
marble chips ,laid over 1" thick floor of pcc
(1:2:4) I/c panneling not more than 16-sft
,I/c rubbing,polishing complete with finishing
and as per direction of the engineer incharge.
Providing/Fixing stair railing of 2.5" including
GI pipe welded etc
Providing/laying PCC (1:2:4) etc complete
Pacca Brickwork in ground floor
25-37
6.00
1783.39
10700.34
06-05-f
1.131
6997.38
7914.04
7-05-a-05
10.195
8228.05
83884.97
11-09-b
95.167
M2
232.85
22159.64
11-23-a-03
95.167
M2
85.16
8104.42
15-52
12.000
No
2564.68
30776.16
25-47-b
1.952
M2
8441.35
16477.52
DETAIL ESTIMATE
PART-C
S.No
ITEM OF WORK
1 Pacca Brickwork in ground floor
(a) cement sand mortar (1:6)
2 Cement plaster in (1:5) upto 20' height
1/2" thick
3 P/L 1/2" thick Mosaic flooring in floors using
grey cement consisting of 1/2" mosaic
topping of one part of cement and marble
powder in the ratio of (3:1) & two parts of
marble chips ,laid over 1" thick floor of pcc
(1:2:4) I/c panneling not more than 16-sft
CSR-2013
Quantity
Unit
Rate (Rs.)
Amount (Rs.)
7-05-a-05
47.182
M3
8228.05
388215.86
11-11-b
180.297
M2
229.50
41378.16
4
5
6
7
8
9
10
11
12
13
14
15
10-22-a
9.294
M2
1182.99
10994.71
12-07-c
25.186
M2
9175.96
231105.73
12-23-b
11.152
M2
11588.12
129230.71
06-05-f
2.574
M3
6997.38
18011.26
10-26-a
3.717
M2
2053.00
7631.00
NSI
9.294
M2
3440.00
31971.36
M2
258.00
142667.29
13-30(a+b) 552.974
NSI
146.3
50.00
7315.00
NSI
80
Nos
400.00
32000.00
15-68-c
20
Nos
4410.63
88212.60
10-38-c
28.439
M2
1604.71
45636.35
12-42-c
14.87
M2
1309.13
19466.76
M2
280.82
116190.68
Quantity
Unit
Rate (Rs.)
Amount (Rs.)
20
Nos
2564.68
51293.60
Nos
72000.00
360000.00
13-38(a+b) 413.755
S.No
ITEM OF WORK
CSR-2013
16 Wiring of light/fan/call bell point in 3/0.029 PVC
insulated bare cable (BSS-2004) in PVC pipe
recessed in wall & complete with wooden boxes
and housing switch with 3/16" white plastic
sheet covering upto 30' length with piano switch
only,including cost of making and filling chases
15-52
complete with finish.
17 S/F 1.5 tone AC split complete in all
respect.
NSI
15-51
10
Nos
732.62
7326.20
15.54
Nos
822.41
4112.05
15-71-a
15-71-b
15-71-c
10
10
10
Nos
Nos
Nos
572.38
480.88
5723.80
4808.80
4808.80
NSI
223.048
M2
2690.00
599999.12
10-46-b
333.364
M2
2496.63
832286.56
NSI
Job
50000.00
50000.00
NSI
Nos
80000.00
480000.00
NSI
No
200000.00
200000.00
NSI
No
50000.00
50000.00
NSI
No
623000.00
Total Rs =>
480.88
623000.00
4583386.40
Name of Sub-Work
Amount (Rs.)
3536677.94
1919694.57
4583386.40
Total = >
10039758.92
50198.79
250993.97
G.Total
Say in Million
10340951.68
10.341
P-14
3.536678
35.22672
1.919695
19.12092
4.583386
45.65236
10.03976 200795.2
5019.879
100