Anda di halaman 1dari 1

Federal Register / Vol. 72, No.

95 / Thursday, May 17, 2007 / Notices 27807

Natural Gas Act (NGA) for permission completion of all necessary reviews, and project provide copies of their protests
and approval to abandon Southern the subsequent need to complete all only to the applicant. However, the non-
Star’s Cement-Drumright line comprised federal authorizations within 90 days of party commenters will not receive
of approximately 40.83 miles of 12-inch the date of issuance of the Commission copies of all documents filed by other
and 16-inch diameter pipeline and staff’s FEIS or EA. parties or issued by the Commission
appurtenances located in Grady and There are two ways to become (except for the mailing of environmental
Comanche Counties, Oklahoma, by sale involved in the Commission’s review of documents issued by the Commission)
to DCP Midstream, LP. Southern Star this project. First, any person wishing to and will not have the right to seek court
further requests that the Commission obtain legal status by becoming a party review of the commission’s final order.
find the facilities, when sold, as exempt to the proceeding for this project The Commission strongly encourages
from the Commission’s jurisdiction should, on or before the comment date electronic filings of comments, protests,
pursuant to section 1(b) of the NGA, all stated below, file with the Federal and interventions via the internet in lieu
as more fully set forth in the application Energy Regulatory Commission, 888 of paper; see 18 CFR 385.2001(a)(1)(iii)
which is on file with the Commission First Street, NE., Washington, DC.
and the instructions on the
and open to public inspection. 20426, a motion to intervene in
Commission’s Web site under the
Southern Star states that the facilities accordance with the requirements of the
‘‘e-Filing’’ link.
were originally constructed to support Commission’s Rules of Practice and
its former merchant function and Procedure (18 CFR 385.214 or 385.211) Comment Date: May 31, 2007.
provide mainline transmission, but in and the Regulations under the NGA (18 Kimberly D. Bose,
more recent years has only served to CFR 157.10). A person obtaining party
Secretary.
gather gas from local producers and status will be placed on the service list
[FR Doc. E7–9462 Filed 5–16–07; 8:45 am]
provided limited gas service to various maintained by the Secretary of the
BILLING CODE 6717–01–P
parties along the system, which will Commission and will receive copies of
continue upon the transfer of the all documents filed by the applicant and
facilities to DCP Midstream, LP. by all other parties. A party must submit
DEPARTMENT OF ENERGY
This filing is available for review at 14 copies of filings made with the
the Commission in the Public Reference Commission and must mail a copy to Federal Energy Regulatory
Room or may be viewed on the the applicant and to every other party in Commission
Commission’s Web site at http:// the proceeding. Only parties to the
www.ferc.gov using the ‘‘eLibrary’’ link. proceeding can ask for court review of
Enter the docket number excluding the Commission orders in the proceeding. [Project No. 2576–083]
last three digits in the docket number However, a person does not have to
field to access the document. For intervene to have comments considered. Northeast Generation Company;
assistance, contact FERC Online The second way to participate is by Notice Granting Late Intervention
Support at filing with the Secretary of the May 10, 2007.
FERCOnlineSupport@ferc.gov or Commission, as soon as possible, an
Telephone: 202–502–6652; Toll-free: original and two copies of comments in On August 2, 2006, the Commission
1–866–208–3676; or for TTY, contact support of or in opposition to this issued a notice of application soliciting
(202) 502–8659. project. The Commission will consider comments, motions to intervene, and
Any initial questions regarding this these comments in determining the protest for the Housatonic River
application should be directed to Tim appropriate action to be taken, but the Hydroelectric Project No. 2576, located
Thompson, Attorney, Southern Star filing of a comment alone will not serve on the Housatonic River, in Fairfield,
Central Gas Pipeline, Inc., 4700 to make the filer a party to the Litchfield, and New Haven Counties,
Highway 56, Owensboro, Kentucky proceeding. The Commission’s rules Connecticut. The notice established
42301, or call (270) 852–4943. require that persons filing comments in September 1, 2006, as the deadline for
Pursuant to section 157.9 of the opposition to the project provide copies filing motions to intervene in the
Commission’s rules, 18 CFR 157.9, of their protests only to the party or proceeding.
within 90 days of this Notice the parties directly involved in the protest. On September 8, 2006, the
Commission staff will either: Complete Persons who wish to comment only Candlewood Lake Authority filed a late
its environmental assessment (EA) and on the environmental review of this motion to intervene in the proceeding.
place it into the Commission’s public project, should submit an original and Granting the late motion to intervene
record (eLibrary) for this proceeding; or two copies of their comments to the will not unduly delay or disrupt the
issue a Notice of Schedule for Secretary of the Commission. proceeding, or prejudice other parties to
Environmental Review. If a Notice of Environmental commenters will be it. Therefore, pursuant to Rule 214,1 the
Schedule for Environmental Review is placed on the Commission’s late motion to intervene filed by the
issued, it will indicate, among other environmental mailing list, will receive Candlewood Lake Authority is granted,
milestones, the anticipated date for the copies of the environmental documents, subject to the Commission’s rules and
Commission staff’s issuance of the final and will be notified of meetings regulations.
environmental impact statement (FEIS) associated with the Commission’s
or EA for this proposal. The filing of the environmental review process. Kimberly D. Bose,
EA in the Commission’s public record Environmental commenters will not be Secretary.
for this proceeding or the issuance of a required to serve copies of filed [FR Doc. E7–9460 Filed 5–16–07; 8:45 am]
pwalker on PROD1PC71 with NOTICES

Notice of Schedule for Environmental documents on all other parties. The BILLING CODE 6717–01–P
Review will serve to notify federal and Commission’s rules require that persons
state agencies of the timing for the filing comments in opposition to the 1 18 CFR 385.214 (2006).

VerDate Aug<31>2005 17:15 May 16, 2007 Jkt 211001 PO 00000 Frm 00008 Fmt 4703 Sfmt 4703 E:\FR\FM\17MYN1.SGM 17MYN1

Anda mungkin juga menyukai