Federal Register / Vol. 72, No.

85 / Thursday, May 3, 2007 / Notices 24581

385.2001 through 385.2005. Agencies the applicant specified in the particular Schedule. Revisions to the schedule will
may obtain copies of the application application. be made as appropriate.
directly from the applicant. A copy of o. Procedural schedule: The
any protest or motion to intervene must application will be processed according
be served upon each representative of to the following Hydro Licensing

Date

Issue Scoping Document 1 for comments .................................................................................................................................. May 2007.


Issue Scoping Document 2 ......................................................................................................................................................... August 2007.
Additional information due ........................................................................................................................................................... December 2007.
Notice of application is ready for environmental analysis .......................................................................................................... January 2008.
Notice of the availability of the EA .............................................................................................................................................. July 2008.
Ready for Commission’s decision on the application ................................................................................................................. October 2008.

Kimberly D. Bose, that document on each person on the document. For assistance, contact FERC
Secretary. official service list for the project. Online Support at
[FR Doc. E7–8408 Filed 5–2–07; 8:45 am] Further, if an intervenor files comments FERCOnlineSupport@ferc.gov or toll-
BILLING CODE 6717–01–P or documents with the Commission free at 1–866–208–3676, or for TTY,
relating to the merits of an issue that (202) 502–8659. A copy is available for
may affect the responsibilities of a inspection and reproduction at the
DEPARTMENT OF ENERGY particular resource agency, they must address in Item H above.
also serve a copy of the document on
Federal Energy Regulatory that resource agency. n. You may also register online at
Commission Scoping comments may be filed http://www.ferc.gov.esubscribenow.htm
electronically via the Internet in lieu of to be notified via e-mail of new filings
[Project No. 12646–001] and issuances related to this or other
paper. The Commission strongly
City of Broken Bow, OK; Notice encourages electronic filings. See 18 pending projects. For assistance, contact
Soliciting Scoping Comments CFR 385.2001(a)(1)(iii) and the FERC Online Support.
instructions on the Commission’s Web o. Scoping Process
April 26, 2007. site (http://www.ferc.gov) under the
Take notice that the following The Commission staff intends to
‘‘eFiling’’ link.
hydroelectric application has been filed prepare a single Environmental
k. This application is not ready for
with the Commission and is available environmental analysis at this time. Assessment (EA) for the Pine Creek Lake
for public inspection. l. The proposed Pine Creek Lake Dam Dam Hydroelectric Project in
a. Type of Application: Original Major Hydropower project would be located at accordance with the National
License. the Corps’ Pine Creek Lake Dam and Environmental Policy Act. The EA will
b. Project No.: P–12646–001. Reservoir, and would consist of the consider both site-specific and
c. Date filed: July 6, 2006. following facilities: (1) A diversion cumulative environmental impacts and
d. Applicant: City of Broken Bow. structure connecting to the existing reasonable alternatives to the proposed
e. Name of Project: Pine Creek Lake outlet conduit; (2) a penstock action.
Dam Hydropower Project. connecting the diversion structure to the Commission staff does not propose to
f. Location: On the Little River in powerhouse; (3) a 112-foot-wide by 73- conduct any on-site scoping meetings at
McCurtain County, Oklahoma. The foot-long powerhouse containing two this time. Instead, we are soliciting
project would be located at the United turbine-generator units, having a totaled comments, recommendations, and
States Army Corps of Engineers’ (Corps) installed capacity of 6.4 megawatts; (4) information, on the Scoping Document
Pine Creek Lake Dam and would occupy a tailrace returning flows to the Little (SD) issued on April 20, 2007.
several acres of land administered by River; (5) a one-mile-long, 14.4-kilovolt
the Corps. transmission line or a 6.5-mile-long, Copies of the SD outlining the subject
g. Filed Pursuant to: Federal Power 13.8 kilovolt transmission line areas to be addressed in the EA were
Act 16 U.S.C. 791 (a)-825(r). connecting to an existing distribution distributed to the parties on the
h. Applicant Contact: Olen Hill, City line; and (6) appurtenant facilities. The Commission’s mailing list and the
Manager, City of Broken Bow, Applicant estimates that the average applicant’s service list. Copies of the SD
Oklahoma; 210 North Broadway; Broken annual generation from the Project may be viewed on the web at http://
Bow, Oklahoma 74728; (405) 584–2282. would be 16,200 megawatt-hours and www.ferc.gov using the ‘‘eLibrary’’ link.
i. FERC Contact: Allyson Conner, that the Project would have an installed Enter the docket number excluding the
(202) 502–6082 or generating capacity of 6.4 megawatts last three digits in the docket number
allyson.conner@ferc.gov. (MW). All generated power would be field to access the document. For
j. Deadline for filing scoping sold to a local utility connected to the assistance, call 1–866–208–3676 or for
comments: May 24, 2007. grid. TTY, (202) 502–8659.
All documents (original and eight m. A copy of the application is
copies) should be filed with: Kimberly available for review at the Commission Kimberly D. Bose,
cprice-sewell on PROD1PC66 with NOTICES

D. Bose, Secretary, Federal Energy in the Public Reference Room or may be Secretary.
Regulatory Commission, 888 First viewed on the Commission’s Web site at [FR Doc. E7–8409 Filed 5–2–07; 8:45 am]
Street, NE., Washington, DC 20426. http://www.ferc.gov using the BILLING CODE 6717–01–P
The Commission’s Rules of Practice ‘‘eLibrary’’ link. Enter the docket
require all intervenors filing documents number excluding the last three digits in
with the Commission to serve a copy of the docket number field to address the

VerDate Aug<31>2005 16:26 May 02, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\03MYN1.SGM 03MYN1