Anda di halaman 1dari 15

PERIODICAL CHECK LIST

Monthly

DELUDGE SYSTEM - 01A


BLOW DOWN AREA
Date
PRINT NAME / SIGNATURE

BADGE NUMBER

DATE

Area Operator
Supervisor
Foreman
Y = Satisfactory

N = Unsatisfactory (explain below)

N/A = Not applicable

Y
General
Condition
Alarm devices
Gauges

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


sure they are in good condition.
Check for physical damage and that electrical connections are
secure
Make sure all gauges are operational and calibrated (5 Years)

Control Valves

1- Accessible, open and car-sealed


2- No corrosion and no leaks

Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
113-K-0002

113-K-0003

113-K-0004

113-K-0005

113-D-0029

113-G-0018A

113-G-0018B

Direction of Nozzle
Condition of sensor
CBS Offgas Compressor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
CBS Offgas Compressor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
CBS Offgas Compressor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
CBS Offgas Compressor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
CBS Offgas K.O Drum
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
Heavy Slop Oil Recovery Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
Heavy Slop Oil Recovery Pump
If Any Obstruction
If Any Leakages

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

N/A

Remarks

PERIODICAL CHECK LIST

Monthly

DELUDGE SYSTEM - 01B


FRACTIONATOR AREA
PRINT NAME / SIGNATURE

BADGE NUMBER

DATE

Area Operator
Supervisor
Foreman
Y = Satisfactory

N = Unsatisfactory (explain below)

Description
General
Condition
Alarm devices
Gauges

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


sure they are in good condition.
Check for physical damage and that electrical connections are
secure
Make sure all gauges are operational and calibrated (5 Years)
1- Accessible, open and car-sealed

Control Valves

2- No corrosion and no leaks


Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
Direction of Nozzle
113-G-0001A

Furnace Charge Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0001B

Furnace Charge Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0001C

Furnace Charge Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0002A

HCGO Pump Around

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0002B

HCGO Pump Around

N/A = Not applicable

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A

Remarks

Y = Satisfactory

N = Unsatisfactory (explain below)

Description

Y
Direction of Nozzle

113-G-0003A

FZGO Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0003B

FZGO Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0024A

HHGO Pump Around

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0024B

HHGO Pump Around

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0025A

Distillate Recycle Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0025B

Distillate Recycle Pump

N/A = Not applicable

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A

Remarks

PERIODICAL CHECK LIST

Monthly

DELUDGE SYSTEM - 01C


FRACTIONATOR AREA
Date
PRINT NAME / SIGNATURE

BADGE NUMBER

DATE

Area Operator
Supervisor
Foreman

Y = Satisfactory

N = Unsatisfactory (explain below)

N/A = Not applicable

Y
General
Condition
Alarm devices
Gauges

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


sure they are in good condition.
Check for physical damage and that electrical connections are
secure
Make sure all gauges are operational and calibrated (5 Years)
1- Accessible, open and car-sealed

Control Valves

2- No corrosion and no leaks


Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
Direction of Nozzle
113-G-0004A

HCGO Product Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0004B

HCGO Product Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0005A

LCGO Pump Around

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0005B

LCGO Pump Around

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A

Remarks

Y = Satisfactory

N = Unsatisfactory (explain below)

N/A = Not applicable

Y
Direction of Nozzle
113-G-0006A

LCGO Product Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0006B

LCGO Product Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0014A

Debutanizer Lean Oil


Recirculation Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0014B

Debutanizer Lean Oil


Recirculation Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0014C

Debutanizer Lean Oil


Recirculation Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A

Remarks

PERIODICAL CHECK L

DELUDGE SYSTEM - 02
GAS PLANT AREA

PRINT NAME / SIGNATURE


OPERATOR
SUPERVISOR
FOREMAN
Y = Satisfactory
General
Condition
Alarm devices
Gauges

N = Unsatisfactory (explain below)

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


sure they are in good condition.
Check for physical damage and that electrical connections are
secure
Make sure all gauges are operational and calibrated (5 Years)
1- Accessible, open and car-sealed

Control Valves

2- No corrosion and no leaks


Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
Direction of Nozzle
113-D-0009

Inter Stage Drum

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-D-0010

ReContact Drum

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A = Not app

DICAL CHECK LIST

Monthly

DGE SYSTEM - 02A

AS PLANT AREA

BADGE NUMBER

below)

K UP

DATE

N/A = Not applicable

N/A

Remarks

PERIODICAL CHECK LIST

Monthly

DELUDGE SYSTEM - 02B


GAS PLANT AREA

PRINT NAME / SIGNATURE

BADGE NUMBER

DATE

Area Operator
Supervisor
Foreman
Y = Satisfactory

N = Unsatisfactory (explain below)

Description

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


General Condition
sure they are in good condition.
Alarm devices
Gauges

Check for physical damage and that electrical connections are


secure
Make sure all gauges are operational and calibrated (5 Years)
1- Accessible, open and car-sealed

Control Valves

2- No corrosion and no leaks


Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
113-G-0008A

113-G-0008B

113-G-0009A

113-G-0009B

113-G-0011A

113-G-0011B

N/A = Not applicable

Direction of Nozzle
Condition of sensor
Frationator OVHD water Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
Frationator OVHD water Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
First stage Suction Drum Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
First stage Suction Drum Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
Inter stage Drum Pump
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
Inter stage Drum Pump
If Any Obstruction

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

N/A

Remarks

113-G-0011B

Y = Satisfactory
N = Unsatisfactory (explain below)
Inter stage Drum Pump

Description

113-K-0001

Wet Gas Compressor

113-U-0033

Wet Gas Compressor Lube oil


Skid

113-E-0073A/B

HCGO seal Oil Cooler

113-E-0075A/B

LCGO seal Oil Cooler

113-G-0075A

HCGO seal Oil Pump

113-G-0075B

HCGO seal Oil Pump

113-G-0079A

LCGO seal Oil Pump

113-G-0079B

LCGO seal Oil Pump

113-U-0045

HCGO seal Oil Package

113-U-0046

LCGO seal Oil Package

If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages
Direction of Nozzle
Condition of sensor
If Any Obstruction
If Any Leakages

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

Bulb

N/A = Not applicable

N/A

Remarks

PERIODICAL CHECK L

DELUDGE SYSTEM - 02
GAS PLANT AREA

PRINT NAME / SIGNATURE


Area Operator
Supervisor
Foreman

Y = Satisfactory
General
Condition
Alarm devices
Gauges

N = Unsatisfactory (explain below)

Inspect spray nozzles, nozzle pipe, hangers, and valves to make


sure they are in good condition.
Check for physical damage and that electrical connections are
secure
Make sure all gauges are operational and calibrated (5 Years)
1- Accessible, open and car-sealed

Control Valves

2- No corrosion and no leaks


Hydraulic
Nameplate

If system is hydraulically calculated, ensure nameplate is legible


and securely attached.

NOZZLE CHECK UP
Direction of Nozzle
113-D-0013

Lean Sponge Oil Coalescer

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0010A

Inter Stage Drum Naphtha Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0010B

Inter Stage Drum Naphtha Pump

N/A = Not app

Y = Satisfactory

113-G-0010B

N = Unsatisfactory (explain below)

Inter Stage Drum Naphtha Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0012A

Stripper Feed Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A = Not app

Y = Satisfactory

N = Unsatisfactory (explain below)


Direction of Nozzle

113-G-0012B

Stripper Feed Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0012C

Stripper Feed Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0013A

Stripper Bottom Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0013B

Stripper Bottom Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages
Direction of Nozzle

113-G-0013C

Stripper Bottom Pump

Condition of sensor Bulb


If Any Obstruction
If Any Leakages

N/A = Not app

DICAL CHECK LIST

Monthly

DGE SYSTEM - 02C

AS PLANT AREA

below)

K UP

BADGE NUMBER

DATE

N/A = Not applicable

N/A

Remarks

below)

N/A = Not applicable

N/A

Remarks

below)

N/A = Not applicable

N/A

Remarks

Anda mungkin juga menyukai