LUSAIL DEVELOPMENT

SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

OVERALL SITE RISK ASSESSMENT


REGISTER SSP09/F01

Prepared and Issued by:

James Anderson, Senior Safety Manager, Lusail Development Safety Team


Reviewed by:

William Street, Senior Project Manager, Lusail Development Project


Authorised by:

Hazim Alsadek, VP, Engineer, Lusail Development Project

Revision History:
Revision

Date

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Description

Revision: 1
Date
: 05/01/07
Page
: Page 1 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

RISK ASSESSMENT REGISTER OF WORK ACTIVITIES PROFORMA


SITE/PROJECT :

No.

Task &
Activity

LUSAIL DEVELOPMENT
Hazard

Persons at Risk

Electricity

PROJECT MANAGER:
Risk
Electric Shock, Burns
Electrocution, Death

DATE:
Initial Risk
S
L
R

Control Measures

Fire/Explosion

Burns, Death

Foreign Bodies

Injury to eyes/ Flying


objects, Cuts

Tinitus/Noise Induced
Hearing Loss

Noise
Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

HOT WORK
Pipe Soldering
Disc Cutting
Welding

Inhalation of
Dust/Fumes

Injury to Respiratory
Tract/ diseases/cancer
acute and chronic

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Ensure that all plant and


equipment is tested.
Only suitable tools and
equipment must be used on site
Suitable Fire Extinguisher in
location of hot work
Hot Work Permit issued from
Contractor. 45 min check-work
complete.
Suitable and sufficient PPE to be
worn with all hot work activities
(Goggles, Gloves, Dust Masks,
Ear Defenders,RPE, and
specific welding PPE.
Trained competent persons to
only operate or maintain any
specialised tools or equipment.
Carry out hot work activities in
well ventilated areas.
Loose Clothing must not be
worn
Disc cutting to be used on level
surface.
COSHH Assessments for
welding, hot cutting Pipe
Soldering required.
Method Statement required for
all hot work.
Remove all combustible
materials or liquids from hot
works work area prior to any hot
work activities commence.
Training and regular toolbox
talks carried out and recorded at
regular intervals.

Residual Risk
S
L
R

Risk Owner

Project/
Construction
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 2 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity
MOVING OF
EQUIPMENT
PLANT &
MATERIALS

Hazard
Manual Handling

Collision/Collapse

Persons at Risk
Consultants,Contractors
Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Risk
Injury to Personnel
Injury to Personnel /
Damage to equipment

Initial Risk

Control Measures
Risk Assessment carried out prior to heavy
work commencing. Mechanical methods to
be used where possible, or multiple person
lifting.

Manual Handling

Back Injury/Strain/Sprain

Collapse/Collision

Injury to persons

Falls from Height

Injury to Operative

MOBILE/

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

TOWER
SCAFFOLDS

Falls from Materials

Injury to other persons

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Ensure that scaffold is erected to


manufacturers instructions.
Method Statement required for
work.
Certified erectors only to erect
scaffold as per training guidance
and Instructions.
Erect Scaffold on firm level
surface.
Min 3.5:1 Height to Base Ratio
(Internal) Min 3:1 Height to Base
Ratio (External)
Double handrail with the top
hand rail erected to no less then
910mm with the gap between
the toe board and mid guard rail
and the mid and top guard rail to
not exceed 470mm.
Toeboards should be no less
then 150mm,
Access must be achieved from
inside by way of secured ladder.
No overloading with materials.
Brakes must be applied when
stationary.
No riding of tower scaffolds. No
persons to be on scaffold during
movement.
Scaffold must be inspected prior
to erection/weekly/ altered and
scaftagged.

Residual Risk

Risk Owner
Project
Manager/s
&
Supervisors

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 3 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk

Control Measures

Electricity

USE OF
PORTABLE
ELECTRIC
TOOLS
Fire

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Electric Shock
Electrocution
Injury to Persons
Property Damage

Manual Handling

Back injury Strain/Sprain

Physical

USE OF HAND
TOOLS
Falls of materials

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Bruising, cuts & sprains,


puncturing, damage to
property

Noise/Vibration

Lusail Development Safety Team


SSP09/F01
Issue No: 01

All electrical tools must be


tested.
Method statement required for
work
Wear appropriate PPE
(Gloves/Goggles/Hearing
protection)
Manual Handling assessment
prior to use of tools.
Lubricate rigid surfaces to
prevent friction
Inspect tools prior to all
operations.
Never use in wet conditions or
Confined Spaces/Flammable
atmospheres.
Provision of Toolbags or belts
while working.
Inspecting tools for loose and
deficient parts. Report and
replace immediately.
If using tools at height, secure
tool to you or scaffold.
Toe-boards and brick
guards/netting in place to
prevent accidental dropping of
tools or materials.
Wear appropriate PPE
(Gloves/Goggles/Hearing
protection/Head Protection and
Safety Footwear)
Monitored job rotation of
workforce.

Residual Risk

Risk Owner

Project
Manager/s
&
Supervisors

Project
Manager/s
&
Supervisors

Hand Arm Vibration,


Vibration White Finger
(VWF), WRULDs Noise
Induced Hearing Loss,
Tinitus

Revision: 1
Date
: 05/01/07
Page
: Page 4 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Falls from Height

Back Injury, Fractures,


Cuts, Bruises, Death

Falls from Materials

Head Injury, Death,


Fractures, Cuts, Bruises

Initial Risk
L
R

Control Measures

Slipping/Collapse

USE OF
LADDERS

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Back Injury, Fractures,


Cuts, Bruises, Death

Falls from Materials

Head Injury, Death,


Fractures, Cuts, Bruises

Slipping/Collapse

Back Injury, Fractures,


Cuts, Bruises, Death

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Live Electrical work : Wooden


Ladders only
Ladder must extend 1m beyond
o
platform, at 75 angle or 4:1
Height to Base ratio.
Ladder must be placed on firm
level base.
All ladders must be properly
tied (not by styles) to a fixed
sound structure
Ladders must be inspected
prior to use, and ladders must
only be used for short duration
light work and inspection, with
one hand on the ladder as a
minimum at all times. If this
cannot be done another work
platform is required.
Tools should be secured to
worker by toolbag/tool belt or
lanyard.
Deficient ladders must be
destroyed.
Hard Hats worn especially
below ladder.
Method Statement for work
activity.
If over 9m platform must be
provided.
Only one person on ladder at
one time.
Materials to be hoisted up or
carried in toolbag.
Working position should be not
less than 5 rungs from top.
Ladders must be 1 Industrial
ONLY.

Residual Risk
S L
R

Risk Owner

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 5 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Back Injury, Fractures,


Cuts, Bruises, Death

Falls from Height


Falls of Material
7
GENERAL
ACCESS
SCAFFOLD

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Head Injury, Death,


Fractures, Cuts, Bruises

Back Injury, Fractures,


Cuts, Bruises, Death

Collapse

Storage &
Use of
Hazardous
Substances
(Oils, Paints,
lubricants,
sealants,
solvents,
welding, wood
grinder dusts)
(EH 44)
(EH 40)

Inhalation of Dust
Fumes Vapours,
vaporised metals

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Lung Cancers & disease


leading to death, asthma,
sore eyes, vomiting

Contact with skin

Dermatitis, sensitisation,
skin diseases leading to
cancer

Contact with eyes

Visual Impairness acute


and chronic, burns.
Conjunctivitis

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Erected by Competent CITB


Scaffolder.
Scaffold must be inspected
prior to erection/weekly/
altered and scaftagged.
Firm Level base to be used,
with suitable access/egress.
Double handrail with the top
hand rail erected to no less then
910mm with the gap between
the toe board and mid guard rail
and the mid and top guard rail
to not exceed 470mm.
Toeboards should be no less
then 150mm,
no more than 300mm gap
between structure and
scaffold.
No overloading with materials.
Scafftag to be used.
Method Statement required for
work activity.
All substances must have
accompanied Material Safety
Data Sheet requested from
producer.
COSHH Assessment on
substance required suitable to
work.
PPE must be worn requested
on label of tin/drum. If no label
is on substance do not use it.
Method Statement produced
with safest possible system of
work introduced.
First Aider on site with
adequate first aid facilities.
All workers aware of hazards

Residual Risk
S L
R

Risk Owner

Project
Manager/s
&
Supervisors

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 6 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Falls of materials

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Death, or serious injury,


fractures, bruises, cuts,
and possible all of above

Storage &
Use of
Liquefied
Petroleum
Gases (LPG)
0
FLAM>20 C
Propane
Butane or mix
of both

Fire

Explosion

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Property Damage, Injury


to personnel, Death

Death, Property Damage

Asphyxiation

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Death or suffocation

Residual Risk
S L
R

Risk Owner

from COSHH Assessment.


Ensure adequate ventilation to
move or extract fumes, and
respiratory equipment is worn
Substances being used at
height must be secured to fixed
structure to prevent tipping or
falling of substance.
Storage of substances must be
secure and of good construction
with ventilation, placed in cool
and shaded area and out of
direct sunlight.
Ensure substance and
protective equipment is
disposed of in accordance with
Material Safety data Sheet.
Always clean hands and face
thoroughly before eating,
drinking or smoking. Barrier
creams and moisturisers.
Suitable fire fighting equipment
to be suitably located
Adequate warning signs to be
clearly displayed
Method Statement required for
work activity.
Always wear gloves and
overalls when handling LPG due
to frosting.
Adequate ventilation required
for use and storage of LPG as it
is asphyxiant and anaesthetic.
No naked flames allowed near
LPG.
Use soapy water to detect
leaks. If leak do not use any
electrical equipment or

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 7 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Residual Risk
S L
R

Risk Owner

appliance with spark.

Contact with skin

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Frost Burns, loss of limb

11

Storage &
Use of Highly
Flammable
Liquids
(HFL)
0
FLAM<32 C
Petrol,
Oxygen,
Oxyacetylene
MAPP

Fire

Explosion

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Property Damage, Injury


to personnel, Death

Death, Property Damage

Contact with eyes

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Burns, Visual
impairment.

LPG to be stored outside on a


firm level base, with secure
cage. Signs warning of LPG
erected outside storage.
Do not mix with Oxygen or HFL
unless 3m gap is evident. 1.5
m distance from any fencing
and 3m from any building, drain
cellar, or excavation. Do not
use in confined spaces, within
2m of lights.
LPG to remain upright and
secure at all times.
Purpose made secure trolleys
for transport of LPG on site.
Fire Extinguishers in LPG
locations.
Minimum quantities to be held
of HFL on site.
Suitable fire resistant store
required with signage warning
of HFL, with bunding, to
contain and prevent release of
liquids to drains that is 10% +
volume stored.
HFL to be kept in containers 5l
capacity for petrol with max 50l
and must be 2m from any
buildings.

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 8 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Initial Risk
L
R

Control Measures

Contact with skin

Frost Burns, loss of limb

12

WORKING AT
HEIGHT AND

Falls from Height

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Back Injury, Fractures,


Cuts, Bruises, Death

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Residual Risk
S L
R

Risk Owner

Method Statement required for


work activity.
No naked flames allowed
near HFL, and suitable fire
equipment near locations (Dry
Powder/Foam).
Spillages should be soaked up
with sand or absorbent
wearing appropriate PPE from
label of tin/drum/cylinder and
disposed of by manufacturers
instructions.
All spillages must be reported
as incidents.
Adequate ventilation required
for use and storage of HFL.
Materials Safety Data Sheets
to be issued from supplier, and
COSHH Assessment done on
site.
Planned work to ensure safe
access, working platform and
system of work.
Method Statement required.
Suitable signs and barriers
below work to inform others of
work above.
Edge protection above 2m with

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 9 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Falls from Materials Consultants,Contractors


, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Falls from Materials

Spillages

13

STORAGE
OF
MATERIAL/
PLANT AND
EQUIPMENT
ON SITE

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives
Collapse/Collision

Risk

Head Injury, Death,


Fractures, Cuts, Bruises

Initial Risk
L
R

Control Measures

14

Vibration

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Head Injury, Death,


Fractures, Cuts, Bruises,
Burns, skin cancer

Burns, skin cancer,

Head Injury, Death,


Fractures, Cuts, Bruises,
Burns, skin cancer

Hand Arm Vibration,


Vibrational White Finger
(VWF), WRULDs

Risk Owner

double handrail and toeboards,


or brick guards/fans to prevent
materials falling.

Harnesses worn where


protection is not possible secured to fixed
structure capable of weight.

PPE including hard hats with


chin straps must be worn by all.

Working Platforms to be erected


and used by Competent
Persons.

Roofs should be surveyed in


plans prior to work commencing,
with routes for safe walking.

Tools should be suitably secured


to prevent the fall of tools

Use of
Pneumatic/
Vibration
Tools
(Drills,

Residual Risk
S L
R

Safe storage of plant, materials


and equipment should be
detailed in method statement.
Palletised loads should not
exceed two pallets.
Storage of pipes and cable
drums shall be chocked or
wedged.
Compressed gas stored
according to manufacturers
instructions, upright and secure.
No more than 2m high storage.
Drums and containers marked
up to identify hazards with
proper spill control.
Not to be stored in direct
sunlight
All equipment over 85dBA (Hard
to hear others >1m normal
voice) must ensure that
Operatives and others wear ear
plugs, over 90dBA ear

Project
Manager/s
&
Supervisors

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 10 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity
Concrete
breakers
Grinders
chain saws
chop saws)

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Noise

Noise Induced Hearing


Loss, Tinitus

Electricity
(Contact with live
services)

Electric Shock
Electrocution

Foreign Bodies

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Eye Injury, Loss of Sight,


visual impairness

Lung Cancers & disease


leading to death, asthma,
sore eyes, vomiting

Inhalation of
Fumes/mists

15

Lifting of
Material/
Plant using
mobile

Collision/Collapse

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients

Death, Serious Injury,


property damage

Residual Risk
S L
R

Risk Owner

muffs/defenders.
Risk assessment specific to
noise, and PPE and method
statement required for activity.
If breaking into walls or floors
ensure cable detection is carried
out prior to break.
Survey existing drawings for
cable runs and pipework.
Identification of services carried
out live or dead.
Permit to Work issued for
activity, with isolations/lock offs
to existing services carried out.
If tool has high vibration factor in
Hz scale, assess duration of
activity, and rotation of job to
prevent prolonged use.
exposure assessments
required, and health
surveillance.
If short term exposure every
few minutes reduction must be
achieved, and short breaks
frequently taken,
Suitable PPE worn including
padded gloves specific for
VWFs. Compressors must be
maintained and receive
thorough examination.
COSHH Assessment required
for substances used such as
lubricating oil.
RPE and goggles will be
required if mist/dust is present.
All lifting operations must be
under control of an appointed
person who will be competent
to take overall responsibility and

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 11 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity
crane

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Representatives
Death, Serious Injury,
property damage

Falls of material

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Electricity/
overhead power
lines

Electric Shock
Electrocution

15
Contd

Lifting of
Material/
Plant using
mobile
crane
(PM 54)
(PM 15)
(PM 16)

Collision/Collapse

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Death, Serious Injury,


property damage

possess a method statement for


the work activities.
A Plan must be produced that
considers weight of load, radius
of lift, overhead clearance,
ground conditions, positioning of
crane, and lifting equipment
required.
An assessment of the ground
conditions must be carried out
by a competent person
Crane must be sited with min
600mm clearance around.
Distance from Overhead cables
must be length of jib + 6m, and
marked off to stop
encroachment.
Crane must have firm level
base with load bearing checks
made on ground to support
weight of crane and load, shock
loading, wind stress and slewing
torques.
Exclusion zones must be set up
prior,during and dismantleling of
lifting operations
Erection of crane must be
carried out by competent crane
erectors.
Operation of mobile cranes
must be carried out by a
competent certified person.
Slinging of loads must be
carried out by competent

Residual Risk
S L
R

Risk Owner

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 12 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity
(contd.)

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures
certified persons,
Lifting zone should be identified
and cordoned off to prevent
lifting over people.

For cranes over 1 tonne ASLIs,


radius load indicators and
motion limit switches must be
fitted and operational by audiovisual methods. The SWL must
be indicated on crane and never
exceeded.

Test load prior to lift by raising


150mm only.

Load must be correctly slung


and secured.

Loosed materials must be


carried in boxes/containers.

All lifting equipment must be


maintained to manufacturers
instructions, generally weekly
inspections by operative
required. After 12 months a
thorough examination (T.E.) or
Fork lifting accessories (chains,
slings) must have a thorough
examination after 6 months and
weekly inspection. Each rope
must identify SWL.

Method statement for work


activity is required with
assessments of nature and
extent of lead exposure.

Reduce lead dusts, fumes and


vapours where possible.
Maximum Exposure Limit
3
0.15mg Lead /m Air over 8hr
period must never be exceeded.
If blood level is 50micrograms
Lead / 100ml blood, workers

Residual Risk
S L
R

Risk Owner

Death, Serious Injury,


property damage

Falls of material

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives
Electricity/
overhead power
lines

Working
with Lead
Lead based
paints
Soldering
Welding,
cutting lead
pipes

Ingestion of Lead

Inhalation of Lead

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Electric Shock
Electrocution

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Lead Poisoning, kidney


damage, constipation,
weight loss

Nerve and brain


damage, teratogenic,
lead poisoning

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 13 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
L
R

Control Measures

Lead Poisoning, kidney


damage, constipation,
weight loss

Absorption of Lead

Poor operation

17

Use of PPE
(Personal
protective
Equipment),
RPE,
Poor seal
(Respiratory
Protective
Equipment),
Safety
Equipment
Hard Hats
Harnesses
Respirator
Masks
Failure of
Breathing
Equipment
Apparatus
Ear Protection

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Injury to person

Death, or serious injury


Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Death or serious injury

must reduce exposure, if 60


micrograms worker must be
signed off work.
Proper PPE Assessment must
be carried out with attention to
Respiratory Protective
Equipment, goggles.
Adequate ventilation/extraction
must be provided local to lead
dusts/fumes/vapours.
Material Safety Data Sheet and
COSHH assessment required
for all use and cutting of lead
based paints, welding rods etc.
Damp area and use wet removal
of paint. Good hygiene, welfare
facilities needed.
Employers must provide PPE,
RPE, Safety equipment at all
times when necessary.
Ensure that all PPE, RPE is
assessed for suitability for job,
limitations, capability,
compatibility with other PPE.
additional hazards.A
method statement for work
activity is produced, with sitespecific risk assessments.
Read manufacturers instructions
for weaknesses and correct
installation or wear.
Training or
information/instruction should be
given on use, storage and
maintenance theoretically and
practically. Ensure that PPE is
adequate for job activity,
And all operatives exposed are
warned by signage and toolbox
talk. Ensure that suitable
storage is available for Safety
equipment on site.

Residual Risk
S L
R

Risk Owner

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 14 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
S
L
R

Control Measures

Faulty Equipment

Injury to Persons, death

Contact with
Hazardous
substances

Burns (hot & cold),


serious injury.
Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Pressure systems

18

Injury to Persons, death

Contact with
Hazardous
substances

Pressure systems

Explosion / Fire, injury to


persons

Installation of
new plant and
equipment
AHUs
Chillers,
Pipework
Ductwork
Faulty Equipment
Generators

Burns (hot & cold),


serious injury.
PB staff.
Contractors, Sub
Contractors, Visitors,
EHS Dept., Public,
Clients Representative

Explosion / Fire, injury to


persons

Gas Inhalation

Death, Asphyxiation

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Residual Risk
S
L
R

Risk Owner

Method statement required for


installation, with hazards
identified at design stage and
control measures during
construction and on start up
provided.
Connections to existing systems
must be under permit to work,
with isolations and lock off
engaged.
Warning signage must be in
place where necessary
Guards and emergency stop
must be fitted prior to testing and
commissioning.
All plant and equipment must be
left in a secure and fail safe
operation while unattended.
PPE must be worn.
Manual handling assessments
required. COSHH.

Project
Manager/s
&
Supervisors

Ensure supplier provides


installation team with operating
instructions, technical data and
limitations.
Certificate of test and
examination required to prove
safe operation from
manufacturer (Declaration of
Conformity).
No one must enter ductwork
under any circumstance.
A safe system of work must be
devised.
Pressure must not be applied
to system until full installation
has occurred with Safety
devices (PRVs) installed.
Only competent persons to
pressure test.

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 15 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
S
L
R

Control Measures

19

Installation of
Electrical
Wiring and
plant
Electricity
Distribution
Fire
HV Switchgear
Panels
Cables

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

Electric Shock
Electrocution
Burns

Electric Shock
Electrocution
Burns

Electricity

20

Testing and
Commission
Electrical t
Distribution
Panels
Cable

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives
Fire

Lusail Development Safety Team


SSP09/F01
Issue No: 01

Explosion
Burns
Death

Survey must be carried out of


all existing electrical circuitry
and method statement
produced for activity.
On all new build equipment no
work must be carried out live
until continuity testing and
commissioning has taken
place.
Connections to existing
appliances must be carried out
under a permit to work
procedure.
Reference to other hazards in
this register must be adopted.
Only competent electricians
must be employed to carry out
work in accordance with good
Wiring practices.
If live work is unavoidable a
separate specific risk
assessment will be required
Suitable fire fighting equipment
to be suitably located
All work must be carried out
under a permit to work system,
electrical and general work for
others in area.
Method Statement must be
carried out. Test equipment
must be insulated, calibrated,
and fused.
Only trained, competent
electricians n will be allowed to
test circuits.
Signs must be installed to warn
of energisation and restricted
access. Live work must be
carried out in accordance with
good practice

Residual Risk
S
L
R

Risk Owner

Project
Manager/s
&
Supervisors

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 16 of 17

LUSAIL DEVELOPMENT
SAFETY TEAM
SSP09/F01 Overall Site Risk Assessment Register

No.

Task &
Activity

Hazard

Persons at Risk

Risk

Initial Risk
S
L
R

Control Measures

Display Screen
Equipment (DSE)

WRULDs, RSI, Eye


Damage, Stress,
Headaches,

Electricity

Death, Serious injury,


burns

Slips, Trips and


Falls

Sprains, strains,
fractures

Office
Work

Consultants,Contractors
, Sub Contractors,
Visitors, Safety Dept.,
Public, Clients
Representatives

21

Office Work

Passive smoking,
Fire

Death, serious injury,


burns, cancer.

Lusail Development Safety Team


SSP09/F01
Issue No: 01

All computer workstations must


have DSE Assessment carried
out. Regular breaks per hour
from screen. Eye test if user
(>2hours/day).
No overloading of power
circuits, with testing carried out
on all mobile equipment.
Never use equipment unless
given instruction to do so.
Fire fighting equipment,
evacuation plan and regular
inspection of both carried out.
Risk Assessment required for
office area relating to fire.
Audible alarms suitably located
in office
Fire wardens and suitable
assembly points nominated
and signs erected to inform.
Emergency lighting required
and checked monthly.
All staff and appointed persons
must receive regular training
and this must be recorded
Fire drills must be carried out
and recorded
All trailing cables must be
protected by trip mat.
Good housekeeping required
not to block exits.
No smoking or naked flames
allowed in office, smoking only
permitted in designated areas.
Any sub contractor working in
offices must be controlled and
monitored. All office staff and
visitors must sign in and out of
the building.
COSHH assessment for
materials used in office

Residual Risk
S
L
R

Risk Owner

Project
Manager/s
&
Supervisors

Revision: 1
Date
: 05/01/07
Page
: Page 17 of 17