__________________________________________________________________________________________
____________________________________
VOLUME 15
ECONOMIC
ASSESSMENT OF
ROAD SCHEMES
IN SCOTLAND
SECTION 1
____________________________________
PART 11
1. Index
2. Abbreviations
__________________________________________________________________________________________
February 1998
Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
1.
INDEX
Subject
Part.Chapter.Paragraph
Abbreviations11.2
Accident
Accident-Only Node
Costs
Junctions
Links
Rates
Types
Combined Link and Junction
Junctions
Link Only
ACCIDENT
_COSTS
_JUNCTION
_LINK
_RATES
ADD
Adjustment of Profiles
All or Nothing Assignment
Annual Average Daily Traffic (AADT)
Annual Average Hourly Traffic (AAHT)
Annual Profiles
ARCADY
Assessment Summary
ASSIGN
Assignment
All or Nothing
Multiple Routeing
Multiple User Class
6.4
6.4.9, 6.6.1
6.4.1, 6.5.6, 6.6.8
6.6
6.5
6.4.2, 6.5.4, 6.6.3
6.5, 6.6
6.5.1
6.6.1, 6.6.4
6.5.1
10.10.2
10.10.5
10.10.4
10.10.3
10.4.7
5.4.16
5.5.8
5.4.4
5.2.42, 5.4.5
5.4.13
8.2
9.4
10.7.3
5.5.8
5.5.10
5.5.15
BASE_COSTS
BASE NETWORK
Behavioural Value of Time
Bendiness
Block Time
BUILD
FUTURE YEAR MATRIX
MATRICES
NETWORK
TREES
10.8.6
10.3.3
6.2.3
7.1.13
8.6.3
10.5.30
10.5.3
10.3.2
10.6.5
Calibration Base
Capacity
Junctions
Major/Minor Priority
Merges
Roundabouts
Signalised Roundabouts
Traffic Signals
Links
2.2.3, 5.1.4
8.7
8.7.2
8.7.10
8.7.4
8.7.11
8.7.7
7.8
__________________________________________________________________________________________
February 1998
11-1-1
Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
Central Areas
CHANGE
Classification
Junction
Links
Network
Climbing Lanes (Dual Carriageways)
Climbing Lanes (Single Carriageways)
Competing Schemes
Complementary Schemes
Construction
Effect of Delaying
Traffic Delays
Construction Costs
Allocation over Time
Calculation Sheets
Items of Scheme Cost
Land Costs
Preparation Costs
Property Costs
Supervision Costs
Construction Delays
Contents
Conversion to AAHT
Costs
Discounted
Perceived
Resource
Unperceived
7.4.3
10.4.8
8
7
5.2.3
7.3.10
7.2.11
4.4
4.4
4.5
6.8.6, 6.11
6.7
6.8.14
6.9.2
6.9
6.7.6
6.8.4
6.7.6
6.8.5
6.8.6, 6.11
1
5.4.5
3.3
3.1.12
3.6.1
3.1.12
6.4.2
10.18
10.2.4
5.4.11
5.4.8
10.5.12
4.5
6.8.6, 6.11
6.8.6, 6.10.12
10.4.5
10.12.4
4.3
4.4.19
3.3
3.2
3.2.2
3.2
9.5
7.3
7.5
__________________________________________________________________________________________
11-1-2
February 1998
Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
E-Factor
Economic Assessment Report (EAR)
Economic Decision Criteria
Economic Concepts
Errors
Model
Program
Enquiries
EVALUATE
Evaluation Period
Examples of Data
Exclusion Analysis
Extent of Network
5.2.11
9.5
4.1
3
4.2.3, 9.1.5
10.20
1.5
10.8.4, 10.15.3
3.4
10.18
4.4.10
5.2.3
Factors
E-Factor
Flow Factor
Flow Group Multipliers
Growth Factors
Economic
Traffic
M-Factor
First Year Rate of Return
Fixed Trip Matrix
Flow
Composition
Factor
Groups
Group Multipliers
Group Traffic Levels
Group Types
Profiles
Variation
Forecasts
Economic
Traffic
Free Format data entry
5.2.11
5.2.15
5.4.23
6.2.14, 6.3.10, 6.4.7
5.6
5.2.18
4.5.4
3.5, 5.6.1, 9.5.4
5.2.26
5.2.15
5.2.31
5.4.23
5.4.23, 5.4.27
5.2.34
5.2.39
5.2.27, 5.2.31
2.2.2, DMRB 13.2
5.6
10.3.10
GDP
Generalised Cost
Generation
Geometric Delay
Geometric Parameters
Junctions
Links
Gradient Adjustment to Fuel Consumption
Growth
Rate, Accident Costs
Rate, Value of Time
Rate, Fuel
Traffic
GROWTH RATES
6.2.14, 6.4.7
5.5.2
3.5.1
5.3.16, 8.5
8.8
7.1.8
6.3.4
6.4.6
6.2.14
6.3.10
5.6
10.5.26
__________________________________________________________________________________________
February 1998
11-1-3
Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
Highway Maintenance
Highways Economic Note No.2
6.10
DMRB 13.2
9.4.10
4.3
11.1
4.4.10
9.3.10
8
6.6
8.7
5.3.14
5.3.16
8.1.4
8.1.5
8.3
8.1
10.9.3
Land Cost
Link Accidents
Links
Overcapacity
Speeds7
Local Authority Schemes
Local Data
Local Model Validation Report
6.7.5
6.5
5.3.6
7.8
4.4.19
5.2.45
9.1.2, 9.5.5
M-Factor
Maintenance delays
Major/Minor Priority Junctions
Capacity
Geometric Delay
Geometric Parameters
Matrix(ces)
Fixed Trip
Variable Trip
MATRIX
_OPTIONS
MAXDEL
Maximum Delay at Junctions
Mean Factor Values
MERGE
Merges at Grade Separated Junctions
Capacity
Geometric Delay
Minimum Speed
Modal Transfer
5.2.18
6.10.12
8.3.2
8.7.2
8.5.2
8.8.2
5.4
3.5, 5.6.1, 9.5.4
2.3.4, 3.5.3, 5.6.1
10.5.16
10.5.7
10.9.4
8.4
5.4.15
10.9.29
8.3.12
8.7.10
8.5.7
7.1.5, 7.8.3
3.5.1
__________________________________________________________________________________________
11-1-4
February 1998
Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
7.3
5.5.10
5.5.15
5.6.7
5.2.3
5.3
5.3.2
10.2.6
10.2.6
5.3.4
5.5.7
7.4.12
5.6.10
6.2
Occupancy (car)
OLD_BASE
OLD_DESIGN
Opening Years
OSCADY
Output
Overcapacity on Links
6.2.11
10.2.6
10.2.6
4.6, 9.3.5 (iii)
8.2
10.18
7.8
Peak
5.4.4
5.2.31
3.1.12
6.4.8
5.5.11
8.2
6.8.4
3.3.2, 6.8.7
3.3.3
5.1
10.16.9
10.16.31
10.16.26
10.16.27
10.16.12
10.16.23
10.5.22, 10.16.4
10.3.16, 10.4.10, 10.12.6, 10.16.3
10.16.20
10.16.35
10.16.17
10.16.37
10.6.15, 10.16.7
10.16.15
__________________________________________________________________________________________
February 1998
11-1-5
Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
PRIORITY
Profiles
Annual
Daily
Flow
Program Availability
Program Capacity
Property Costs
10.9.6
5.4.13
5.4.11
5.2.39
1.4
1.4.3
6.7.5
QUADRO
Queuing Delay
Steady State
Time Dependant
6.10, 6.11
8.6
8.6.7
8.6.8
4.4.8
5.6.11
3.5.1
6.8.11
9.5
3.6.1
6.8.7
6.7.16
5.3.13
6.8.14
6.8.10
7.1.8
5.3
10.9.16
8.3.5
8.7.4
8.5.4
8.8.9
5.5
10
7.2, 7.3, 7.7
Seasonality Index
SCHEME_COSTS
Scheme Cost Input
Scheme in Route
SIGNALS
Signalised Roundabouts
Capacity
Geometric Delay
Geometric Parameters
Single Carriageway Speed/Flow
Rural
Small Town
Suburban
Urban
5.2.7
10.15.4
6.9
4.4
10.9.22
8.3.6
8.7.11
8.5.6
8.8.21
7.2
7.6
7.5
7.4
__________________________________________________________________________________________
11-1-6
February 1998
Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
7.7
7.6
7.1
7.9
7.3
7.1.5
7.2
7.7
7.6
7.5
7.4
10.8.12
10.8.13
4.4
7.5
6.8.5
10.16.38
Taxation
TEMPRO
Terminal Year
Tidality
Time Savings
Work
Non-Work
Tolls
Traffic Delays During Construction
Traffic Flow Input
Annual Average Daily Traffic
Annual Average Hourly Traffic
12 Hour
16 Hour
Traffic Flow Profiles
Traffic Flow Variation
Traffic Forecasts
Local
National
Traffic Model 5
Traffic Signals
Capacity
Geometric Delay
TRANYST
Tree Building
TREE_OPTIONS
Trip Matrix
Fixed
Variable
TURNING DELAYS
Turning Delay (Assignment)
Turning Flows
3.6
5.6.12
4.6.3
8.1.5
6.2
6.2.2
6.2.2
5.5.18
6.11
5.2, 5.4
5.4.4
5.2.42
5.2.15
5.2.15
5.2.39
5.2.31
5.6
5.6.10
5.6.7
8.3.10
8.7.7
8.5.6
8.3.7
5.5.6
10.6.6
5.4
3.5, 5.6.1, 9.5.4
2.3.4, 3.5.3, 5.6.1
10.6.12
5.3.14
8.1.5
__________________________________________________________________________________________
February 1998
11-1-7
Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject
Part.Chapter.Paragraph
Uncertainty
Unperceived Cost
UPDATE NETWORK
Urban Roads Speed/Flow
User Classes
4.2
3.1.12
10.4.2, 10.12.3
7.4
5.2.23
9.1
6.4, 6.5, 6.6
6.2
6.3.4
2.3.4, 3.5.3, 5.6.1
3.6
5.2.26
5.2.28
6.2.11
6.3
Working Time
6.2.2
Zones
ZONES
Zone Connectors
5.3.3
10.3.4
5.3.3
__________________________________________________________________________________________
11-1-8
February 1998
Volume 15 Section 1
Chapter 2
Part 11 Index and Abbreviations
Abbreviations
__________________________________________________________________________________________
2.
ABBREVIATIONS
AADT
AAHT
ACTRA
ARCADY
ATC
ATCS
BCR
CBA
CBD
COBA
DOT
DMRB
Department of Transport
Design Manual for Roads and Bridges
EAR
EPP
FYRR
GDP
HA
HEN1
HEN2
HETA
Highways Agency
Highways Economic Note No.1 - Road Accident Costs
Highways Economic Note No.2 - VOT and VOC
Highways Economic and Traffic Appraisal Division DOT
IHMS
LGV
MCC
NPV
NRTF
NTS
OGV
OGV1
OGV2
OSCADY
PHV
PIA
PICADY
PSV
PVB
PVC
PVY
QUADRO
QUeues And Delays at ROadworks computer program
__________________________________________________________________________________________
February 1998
11-2-1
Chapter 2
Volume 15 Section 1
Abbreviations
Part 11 Index and Abbreviations
__________________________________________________________________________________________
RCTPI
RPF
RPI
SACTRA
TAM
TEMPRO
TRANSYT
TRL
TRRL
URECA
VAT
VOC
VOT
__________________________________________________________________________________________
11-2-2
February 1998