Anda di halaman 1dari 11

DESIGN MANUAL FOR ROADS AND BRIDGES

__________________________________________________________________________________________
____________________________________
VOLUME 15

ECONOMIC
ASSESSMENT OF
ROAD SCHEMES
IN SCOTLAND

SECTION 1

THE NESA MANUAL

____________________________________

PART 11

INDEX AND ABBREVIATIONS


Contents
Chapter

1. Index
2. Abbreviations

__________________________________________________________________________________________
February 1998

The NESA Manual

Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________

1.

INDEX

Subject

Part.Chapter.Paragraph

Abbreviations11.2
Accident
Accident-Only Node
Costs
Junctions
Links
Rates
Types
Combined Link and Junction
Junctions
Link Only
ACCIDENT
_COSTS
_JUNCTION
_LINK
_RATES
ADD
Adjustment of Profiles
All or Nothing Assignment
Annual Average Daily Traffic (AADT)
Annual Average Hourly Traffic (AAHT)
Annual Profiles
ARCADY
Assessment Summary
ASSIGN
Assignment
All or Nothing
Multiple Routeing
Multiple User Class

6.4
6.4.9, 6.6.1
6.4.1, 6.5.6, 6.6.8
6.6
6.5
6.4.2, 6.5.4, 6.6.3
6.5, 6.6
6.5.1
6.6.1, 6.6.4
6.5.1
10.10.2
10.10.5
10.10.4
10.10.3
10.4.7
5.4.16
5.5.8
5.4.4
5.2.42, 5.4.5
5.4.13
8.2
9.4
10.7.3
5.5.8
5.5.10
5.5.15

BASE_COSTS
BASE NETWORK
Behavioural Value of Time
Bendiness
Block Time
BUILD
FUTURE YEAR MATRIX
MATRICES
NETWORK
TREES

10.8.6
10.3.3
6.2.3
7.1.13
8.6.3
10.5.30
10.5.3
10.3.2
10.6.5

Calibration Base
Capacity
Junctions
Major/Minor Priority
Merges
Roundabouts
Signalised Roundabouts
Traffic Signals
Links

2.2.3, 5.1.4
8.7
8.7.2
8.7.10
8.7.4
8.7.11
8.7.7
7.8

__________________________________________________________________________________________
February 1998

The NESA Manual

11-1-1

Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

Central Areas
CHANGE
Classification
Junction
Links
Network
Climbing Lanes (Dual Carriageways)
Climbing Lanes (Single Carriageways)
Competing Schemes
Complementary Schemes
Construction
Effect of Delaying
Traffic Delays
Construction Costs
Allocation over Time
Calculation Sheets
Items of Scheme Cost
Land Costs
Preparation Costs
Property Costs
Supervision Costs
Construction Delays
Contents
Conversion to AAHT
Costs
Discounted
Perceived
Resource
Unperceived

7.4.3
10.4.8
8
7
5.2.3
7.3.10
7.2.11
4.4
4.4
4.5
6.8.6, 6.11
6.7
6.8.14
6.9.2
6.9
6.7.6
6.8.4
6.7.6
6.8.5
6.8.6, 6.11
1
5.4.5
3.3
3.1.12
3.6.1
3.1.12

Damage Only Accidents


Data
Examples
Format
Daily Profiles
Day Types
DEFINE FLOW GROUPS
Delaying Construction
Delays During Construction
Delays During Maintenance
DELETE
DESIGN NETWORK
Design Standard Choice
Developer Funded Schemes
Discounting
Do-Minimum
Do-Nothing
Do-Something
Documentation for Submissions
Dual Carriageway Speed/Flow
Rural
Suburban

6.4.2
10.18
10.2.4
5.4.11
5.4.8
10.5.12
4.5
6.8.6, 6.11
6.8.6, 6.10.12
10.4.5
10.12.4
4.3
4.4.19
3.3
3.2
3.2.2
3.2
9.5
7.3
7.5

__________________________________________________________________________________________
11-1-2

The NESA Manual

February 1998

Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

E-Factor
Economic Assessment Report (EAR)
Economic Decision Criteria
Economic Concepts
Errors
Model
Program
Enquiries
EVALUATE
Evaluation Period
Examples of Data
Exclusion Analysis
Extent of Network

5.2.11
9.5
4.1
3
4.2.3, 9.1.5
10.20
1.5
10.8.4, 10.15.3
3.4
10.18
4.4.10
5.2.3

Factors
E-Factor
Flow Factor
Flow Group Multipliers
Growth Factors
Economic
Traffic
M-Factor
First Year Rate of Return
Fixed Trip Matrix
Flow
Composition
Factor
Groups
Group Multipliers
Group Traffic Levels
Group Types
Profiles
Variation
Forecasts
Economic
Traffic
Free Format data entry

5.2.11
5.2.15
5.4.23
6.2.14, 6.3.10, 6.4.7
5.6
5.2.18
4.5.4
3.5, 5.6.1, 9.5.4
5.2.26
5.2.15
5.2.31
5.4.23
5.4.23, 5.4.27
5.2.34
5.2.39
5.2.27, 5.2.31
2.2.2, DMRB 13.2
5.6
10.3.10

GDP
Generalised Cost
Generation
Geometric Delay
Geometric Parameters
Junctions
Links
Gradient Adjustment to Fuel Consumption
Growth
Rate, Accident Costs
Rate, Value of Time
Rate, Fuel
Traffic
GROWTH RATES

6.2.14, 6.4.7
5.5.2
3.5.1
5.3.16, 8.5
8.8
7.1.8
6.3.4
6.4.6
6.2.14
6.3.10
5.6
10.5.26

__________________________________________________________________________________________
February 1998

The NESA Manual

11-1-3

Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

Highway Maintenance
Highways Economic Note No.2

6.10
DMRB 13.2

Implicit Valuation Approach


Incremental Analysis
Index
Isolation Analysis

9.4.10
4.3
11.1
4.4.10

Journey Time Measurements


Junction
Accidents
Capacity
Choice8.2
Delays (Assignment)
Indices
Interaction
Tidality
Types Modelled
When to Model
JUNCTIONS

9.3.10
8
6.6
8.7
5.3.14
5.3.16
8.1.4
8.1.5
8.3
8.1
10.9.3

Land Cost
Link Accidents
Links
Overcapacity
Speeds7
Local Authority Schemes
Local Data
Local Model Validation Report

6.7.5
6.5
5.3.6
7.8
4.4.19
5.2.45
9.1.2, 9.5.5

M-Factor
Maintenance delays
Major/Minor Priority Junctions
Capacity
Geometric Delay
Geometric Parameters
Matrix(ces)
Fixed Trip
Variable Trip
MATRIX
_OPTIONS
MAXDEL
Maximum Delay at Junctions
Mean Factor Values
MERGE
Merges at Grade Separated Junctions
Capacity
Geometric Delay
Minimum Speed
Modal Transfer

5.2.18
6.10.12
8.3.2
8.7.2
8.5.2
8.8.2
5.4
3.5, 5.6.1, 9.5.4
2.3.4, 3.5.3, 5.6.1
10.5.16
10.5.7
10.9.4
8.4
5.4.15
10.9.29
8.3.12
8.7.10
8.5.7
7.1.5, 7.8.3
3.5.1

__________________________________________________________________________________________
11-1-4

The NESA Manual

February 1998

Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

Motorways Speed Flow


Multiple Routeing Assignment
Multiple User Assignment

7.3
5.5.10
5.5.15

National Road Traffic Forecasts


Network
Classification
Road
Size
NEW_BASE
NEW_DESIGN
Node
Node Expansion
Non-Central Areas
Non-Standard Cases
Non-Working Time

5.6.7
5.2.3
5.3
5.3.2
10.2.6
10.2.6
5.3.4
5.5.7
7.4.12
5.6.10
6.2

Occupancy (car)
OLD_BASE
OLD_DESIGN
Opening Years
OSCADY
Output
Overcapacity on Links

6.2.11
10.2.6
10.2.6
4.6, 9.3.5 (iii)
8.2
10.18
7.8

Peak

5.4.4
5.2.31
3.1.12
6.4.8
5.5.11
8.2
6.8.4
3.3.2, 6.8.7
3.3.3
5.1
10.16.9
10.16.31
10.16.26
10.16.27
10.16.12
10.16.23
10.5.22, 10.16.4
10.3.16, 10.4.10, 10.12.6, 10.16.3
10.16.20
10.16.35
10.16.17
10.16.37
10.6.15, 10.16.7
10.16.15

and Off-Peak Assignments


Flow Groups
Perceived Cost
Personal Injury Accident
Perturbation Factor
PICADY
Preparation Cost
Present Value Year
Price Base Year
Principles of Traffic Modelling
PRINT
ASSIGNMENT
EVALUATION
HFGM
JOURNEY
JUNC_DELAY
LINK_FLOWS
MATRIX
NETWORK
OVER_CAPACITY
PATH
SPEEDS
TEER_FORM
TREES
TURNING

__________________________________________________________________________________________
February 1998

The NESA Manual

11-1-5

Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

PRIORITY
Profiles
Annual
Daily
Flow
Program Availability
Program Capacity
Property Costs

10.9.6
5.4.13
5.4.11
5.2.39
1.4
1.4.3
6.7.5

QUADRO
Queuing Delay
Steady State
Time Dependant

6.10, 6.11
8.6
8.6.7
8.6.8

Ranking of Scheme Options


Reassignment Process
Reassignment3.5.1
Redistribution
Relative Price Factor (RPF)
Reporting
Resource Cost
Retail Price Index (RPI)
Risk Assessment
Road Categories
Road Construction Tender Price Index (RCTPI)
Road Cost Model
Road Geometry
Road Network
ROUNDABOUT
Roundabouts
Capacity
Geometric Delay
Geometric Parameters
Route Choice
Running the Program
Rural Roads Speed/Flow

4.4.8
5.6.11
3.5.1
6.8.11
9.5
3.6.1
6.8.7
6.7.16
5.3.13
6.8.14
6.8.10
7.1.8
5.3
10.9.16
8.3.5
8.7.4
8.5.4
8.8.9
5.5
10
7.2, 7.3, 7.7

Seasonality Index
SCHEME_COSTS
Scheme Cost Input
Scheme in Route
SIGNALS
Signalised Roundabouts
Capacity
Geometric Delay
Geometric Parameters
Single Carriageway Speed/Flow
Rural
Small Town
Suburban
Urban

5.2.7
10.15.4
6.9
4.4
10.9.22
8.3.6
8.7.11
8.5.6
8.8.21
7.2
7.6
7.5
7.4

__________________________________________________________________________________________
11-1-6

The NESA Manual

February 1998

Volume 15 Section 1
Chapter 1
Part 11 Index and Abbreviations
Index
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

Single Track Speed/Flow


Small Town Roads Speed/Flow
Speed/Flow Curves
Diagrams
Dual Carriageway
Minimum Cut-Off
Rural Single Carriageway
Single Track
Small Town
Suburban
Urban
STOP AFTER DELAY CALCULATIONS
STOP AFTER FIRST YEAR
Strategy Appraisal
Suburban Roads Speed/Flow
Supervision Cost
SUPPRESS TABLES

7.7
7.6
7.1
7.9
7.3
7.1.5
7.2
7.7
7.6
7.5
7.4
10.8.12
10.8.13
4.4
7.5
6.8.5
10.16.38

Taxation
TEMPRO
Terminal Year
Tidality
Time Savings
Work
Non-Work
Tolls
Traffic Delays During Construction
Traffic Flow Input
Annual Average Daily Traffic
Annual Average Hourly Traffic
12 Hour
16 Hour
Traffic Flow Profiles
Traffic Flow Variation
Traffic Forecasts
Local
National
Traffic Model 5
Traffic Signals
Capacity
Geometric Delay
TRANYST
Tree Building
TREE_OPTIONS
Trip Matrix
Fixed
Variable
TURNING DELAYS
Turning Delay (Assignment)
Turning Flows

3.6
5.6.12
4.6.3
8.1.5
6.2
6.2.2
6.2.2
5.5.18
6.11
5.2, 5.4
5.4.4
5.2.42
5.2.15
5.2.15
5.2.39
5.2.31
5.6
5.6.10
5.6.7
8.3.10
8.7.7
8.5.6
8.3.7
5.5.6
10.6.6
5.4
3.5, 5.6.1, 9.5.4
2.3.4, 3.5.3, 5.6.1
10.6.12
5.3.14
8.1.5

__________________________________________________________________________________________
February 1998

The NESA Manual

11-1-7

Chapter 1
Volume 15 Section 1
Index
Part 11 Index and Abbreviations
__________________________________________________________________________________________
Subject

Part.Chapter.Paragraph

Uncertainty
Unperceived Cost
UPDATE NETWORK
Urban Roads Speed/Flow
User Classes

4.2
3.1.12
10.4.2, 10.12.3
7.4
5.2.23

Validation of a NESA Assessment


Value of
Accidents
Time
Fuel
Variable Trip Matrix
VAT
Vehicle
Categories
Category Proportions
Occupancy
Operating Costs

9.1
6.4, 6.5, 6.6
6.2
6.3.4
2.3.4, 3.5.3, 5.6.1
3.6
5.2.26
5.2.28
6.2.11
6.3

Working Time

6.2.2

Zones
ZONES
Zone Connectors

5.3.3
10.3.4
5.3.3

Note: NESA Commands in capitals.

__________________________________________________________________________________________
11-1-8

The NESA Manual

February 1998

Volume 15 Section 1
Chapter 2
Part 11 Index and Abbreviations
Abbreviations
__________________________________________________________________________________________

2.

ABBREVIATIONS

AADT
AAHT
ACTRA
ARCADY
ATC
ATCS

Annual Average Daily Traffic Flow


Annual Average Hourly Traffic Flow
Advisory Committee on Trunk Road Assessment
Computer Program for the Design of Roundabout
Automatic Traffic Count
Automatic Traffic Classifier Site

BCR

Benefit to Cost Ratio

CBA
CBD
COBA

Cost Benefit Analysis


Central Business District
COst Benefit Analysis computer program

DOT
DMRB

Department of Transport
Design Manual for Roads and Bridges

EAR
EPP

Economic Assessment Report


Engineering Policy and Programme

FYRR

First Year Rate of Return

GDP

Gross Domestic Product

HA
HEN1
HEN2
HETA

Highways Agency
Highways Economic Note No.1 - Road Accident Costs
Highways Economic Note No.2 - VOT and VOC
Highways Economic and Traffic Appraisal Division DOT

IHMS

Integrated Highways Maintenance System

LGV

Light Goods Vehicle

MCC

Manual Classified Count

NPV
NRTF
NTS

Net Present Value


National Road Traffic Forecasts
National Travel Survey

OGV
OGV1
OGV2
OSCADY

Other Goods Vehicle


Other Goods Vehicle - Category 1
Other Goods Vehicle - Category 2
Computer Program for the Design of Traffic Signals

PHV
PIA
PICADY
PSV
PVB
PVC
PVY

Percentage Heavy Vehicles (OGV1 + OGV2 + PSV/COACH)


Personal Injury Accident
Computer Program for the Design of Priority Junctions
Passenger Service Vehicle
Present Value of Benefits
Present Value of Costs
Present Value Year

QUADRO
QUeues And Delays at ROadworks computer program
__________________________________________________________________________________________
February 1998

The NESA Manual

11-2-1

Chapter 2
Volume 15 Section 1
Abbreviations
Part 11 Index and Abbreviations
__________________________________________________________________________________________

RCTPI
RPF
RPI

Road Construction Tender Price Index


Relative Price Factor
Retail Price Index

SACTRA

Standing Advisory Committee on Trunk Road Assessment

TAM
TEMPRO
TRANSYT
TRL
TRRL

Traffic Appraisal Manual


Trip End Model Presentation pROgram
Computer Program for the optimisation of Linked Traffic Signals
Transport Research Laboratory (formerly TRRL)
Transport and Road Research Laboratory

URECA

URban EConomic Assessment

VAT
VOC
VOT

Value Added Tax


Vehicle Operating Costs
Value of Time

__________________________________________________________________________________________
11-2-2

The NESA Manual

February 1998

Anda mungkin juga menyukai