RENEWABLE GENERATION
SCHEDULING & UI
SETTLEMENT
Background
CERC in September, 2009 constituted a Task Force
with representation of Engineering Wing of the
Commission Staff, CEA, System Operator, C-WET,
WISE and State Commissions/ Utilities/ SLDCs of
Tamil Nadu, Rajasthan, Gujarat and Karnataka for
integration of renewable sources energy into the
Grid
Three
meetings of Task Force held on
13.11.2009,15.12.2009 & 18.1.2010 and its decisions
were incorporated in Grid Code issued on 3.5.2010.
For capacity and voltage level below this, as well as for old
wind farms it could be mutually decided between the Wind
Generator and the transmission or distribution utility, as the
case may be, if there is no existing contractual agreement to
the contrary .
10
12
0:00
0:30
1:00
1:30
2:00
2:30
3:00
3:30
4:00
4:30
5:00
5:30
6:00
6:30
7:00
7:30
8:00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
23:00
23:30
Power (MW)
300
250
200
150
100
50
20 MW
48 MW
74 MW
113 MW
44 MW
TOTAL
80
60
0:00
0:30
1:00
1:30
2:00
2:30
3:00
3:30
4:00
4:30
5:00
5:30
6:00
6:30
7:00
7:30
8:00
8:30
9:00
9:30
10:00
10:30
11:00
11:30
12:00
12:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
17:00
17:30
18:00
18:30
19:00
19:30
20:00
20:30
21:00
21:30
22:00
22:30
23:00
23:30
Power (MW)
140
120
100
40
20
20 MW
48 MW
74 MW
113 MW
44 MW
TOTAL
Errors
New Zealand
60.00
High Wind_23062010
Schedule
Actual
freq
50.20
50.10
50.00
49.90
50.00
49.80
40.00
MW
49.70
49.60
30.00
49.50
20.00
49.40
49.30
10.00
49.20
0.00
49.10
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94
27
35.00
Low Wind_23022010
Schedule
Actual
freq
50.20
50.10
50.00
30.00
49.90
25.00
49.80
49.70
MW
20.00
49.60
15.00
49.50
10.00
49.40
5.00
49.30
0.00
49.20
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94
28
50.20
50.10
60.00
50.00
50.00
49.90
49.80
MW
40.00
49.70
Schedule
Actual
30.00
49.60
freq
49.50
20.00
49.40
10.00
49.30
49.20
6
16
26
36
46
Time Block
56
66
76
86
96
29
Suggestion
70.00
60.00
Actual
freq
50.20
50.10
50.00
49.90
50.00
49.80
40.00
MW
49.70
49.60
30.00
49.50
20.00
49.40
49.30
10.00
49.20
49.10
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94
30
P-75
High Wind_P75
70.00
50.20
Schedule
Actual
freq
50.10
60.00
50.00
50.00
49.90
49.80
MW
40.00
49.70
30.00
49.60
49.50
20.00
49.40
10.00
49.30
0.00
-4
49.20
6
16
26
36
46
56
Time Block
66
76
86
96
31
P-90
High Wind_P90
Schedule
Actual
freq
70.00
50.20
50.10
60.00
50.00
MW
50.00
49.90
49.80
40.00
49.70
30.00
49.60
49.50
20.00
49.40
10.00
0.00
-4
49.30
49.20
6
16
26
36
46
Time Block
56
66
76
86
96
32
Forecast or ?
33
Forecast?
Forecast or Proportional ?
45
40
35
30
MW
25
20
15
10
5
0
-4
16
26
36
46
Time Block
56
66
76
86
96
34
Conclusion
Capped UI
Income
Amount
Loss due
receivable to
(+)/
capping
Payable (-)
by
Generator
Total
Impact of
forecasting
errors
High Wind_P90
562669
-448841
1252393
-734565
High Wind_P75
371194
-54664
-826206
-509676
High Wind_P50
Low Wind_P50
95623
102560
-42092
-212839
-159308
-26219
-228278
-151937
-3476
-3476
26925
26925
High Wind_3block
gradual
Rs 3875950
36
Thank You.
Vijay Menghani
Joint Chief( Engg.).
CERC
vmenghani@cercind.gov.in
menghaniv@gmail.com
37
Jun'10 Forecast
80.00
Forecast Power
P-50(MW)
Forecast Power
P-75(MW)
Forecast Power
P-90(MW)
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
2
3
2
4
2
5
2
6
38
Feb'10 Forecast
40.00
Forecast
Power
P-50(MW)
35.00
Forecast
Power
P-75(MW)
30.00
25.00
20.00
15.00
10.00
5.00
0.00
2
3
2
4
2
5
2
6
39