Anda di halaman 1dari 2

66986 Federal Register / Vol. 71, No.

222 / Friday, November 17, 2006 / Notices

November 13, 2006. than 0.05 percent by weight thorium Rulemakings and Adjudications Staff,
Kathy Plowitz-Worden, and uranium, and this material is between 7:45 a.m. and 4:15 p.m.,
Panel Coordinator, Panel Operations, therefore regulated by the NRC as source Federal workdays;
National Endowment for the Arts. material. SMC was licensed by the NRC 3. E-mail addressed to the Office of
[FR Doc. E6–19410 Filed 11–16–06; 8:45 am] to ship, receive, possess, use and store the Secretary, U.S. Nuclear Regulatory
BILLING CODE 7537–01–P source material under license SMB–743. Commission, hearingdocket@nrc.gov; or
In August 2001, SMC notified the NRC 4. By facsimile transmission
that it had ceased production activities addressed to the Office of the Secretary,
NUCLEAR REGULATORY using source material. On August 27, U.S. Nuclear Regulatory Commission,
COMMISSION 2001, the licensee provided notification Washington, DC, Attention:
of its intent to decommission the Rulemakings and Adjudications Staff, at
[Docket No. 40–7102] facility. The license is in timely (301) 415–1101; verification number is
renewal, and was amended on (301) 415–1966.
Notice of Consideration of Amendment November 4, 2002 to authorize only
Request for Decommissioning for In accordance with 10 CFR 2.302(b),
decommissioning activities.
Shieldalloy Metallurgical Corporation, SMC submitted its initial DP to the all documents offered for filing must be
Newfield, NJ and Opportunity to NRC on October 21, 2005. The DP accompanied by proof of service on all
Request a Hearing proposed the use of a possession only parties to the proceeding or their
license for long term control of the site. attorneys of record as required by law or
AGENCY: Nuclear Regulatory by rule or order of the Commission,
Commission. The NRC staff rejected the initial DP by
letter dated January 26, 2006. The staff including:
ACTION: Notice of amendment request 1. The applicant, Shieldalloy
met with SMC (in a meeting open to the
and opportunity to request a hearing. Metallurgical Corporation, 12 West
public) on March 9, 2006, to discuss the
initial DP’s deficiencies and a path Boulevard, PO Box 768, Newfield, New
DATES: A request for a hearing must be Jersey 08344–0768. Attention: David R.
filed by January 16, 2007. forward for development of an
acceptable DP. Pursuant to comments Smith, Radiation Safety Officer;
FOR FURTHER INFORMATION CONTACT: Ken 2. The NRC staff, by delivery to the
received at the March 2006 meeting,
Kalman, Project Manager, SMC submitted its revised DP by letter Office of the General Counsel, One
Decommissioning Directorate, Division dated June 30, 2006. White Flint North, 11555 Rockville
of Waste Management and If the NRC approves the DP, the Pike, Rockville, MD 20852, or by mail
Environmental Protection, Office of approval will be documented in an addressed to the Office of the General
Federal and State Materials and amendment to NRC License No. SMB– Counsel, U.S. Nuclear Regulatory
Environmental Management Programs, 743. However, before approving the Commission, Washington, DC 20555–
U.S. Nuclear Regulatory Commission, proposed amendment, the NRC will 0001. Hearing requests should also be
Rockville, Maryland 20852. Telephone: need to make the findings required by transmitted to the Office of the General
(301) 415–6664 fax number: (301) 415– the Atomic Energy Act of 1954, as Counsel, either by means of facsimile
5398; or e-mail: klk@nrc.gov. amended, and NRC’s regulations. These transmission to (301) 415–3725, or by e-
SUPPLEMENTARY INFORMATION: findings will be documented in a Safety mail to ogcmailcenter@nrc.gov.
I. Introduction Evaluation Report and an The formal requirements for
Environmental Impact Statement. documents contained in 10 CFR
The U.S. Nuclear Regulatory 2.304(b), (c), (d), and (e), must be met.
Commission (NRC) is considering III. Opportunity to Request a Hearing
In accordance with 10 CFR 2.304(f), a
issuance of a license amendment to The NRC hereby provides notice that document filed by electronic mail or
Source Material License No. SMB–743 this is a proceeding on a proposed facsimile transmission need not comply
issued to Shieldalloy Metallurgical license amendment which would with the formal requirements of 10 CFR
Corporation (SMC or the licensee), to approve SMC’s revised DP. In 2.304(b), (c), and (d), as long as an
authorize the decommissioning of its accordance with the general original and two (2) copies otherwise
Newfield Facility in Newfield, New requirements in Subpart C of 10 CFR complying with all of the requirements
Jersey. SMC submitted its revised part 2, as amended on January 14, 2004 of 10 CFR 2.304 b), (c), and (d) are
Decommissioning Plan (DP) to NRC on (69 FR 2182), any person whose interest mailed within two (2) days thereafter to
June 30, 2006, and by letter to SMC may be affected by this proceeding and the Secretary, U.S. Nuclear Regulatory
dated October 18, 2006, the NRC found who desires to participate as a party Commission, Washington, DC 20555–
the DP acceptable to begin a detailed must file a written request for a hearing 0001, Attention: Rulemakings and
technical review of its adequacy. and a specification of the contentions Adjudications Staff.
II. Background which the person seeks to have litigated In accordance with 10 CFR 2.309(b),
in the hearing. a request for a hearing must be filed by
SMC has been conducting smelting In accordance with 10 CFR 2.302(a),
and alloy production at its Newfield site January 16, 2007.
a request for a hearing must be filed
since 1940, including past production of with the Commission either by: In addition to meeting other
chromium metal, ferrovanadium and 1. First class mail addressed to: Office applicable requirements of 10 CFR
columbium nickel. Ferroalloy of the Secretary, U.S. Nuclear 2.309, the general requirements
production began in 1955 and ended in Regulatory Commission, Washington, involving a request for a hearing filed by
June 1998. The SMC facility processed DC 20555–0001, Attention: Rulemakings a person other than an applicant must
pyrochlore, a concentrated ore and Adjudications; state:
jlentini on PROD1PC65 with NOTICES

containing columbium (niobium), to 2. Courier, express mail, and 1. The name, address, and telephone
produce ferrocolumbium, an additive/ expedited delivery services: Office of number of the requester;
conditioner used in the production of the Secretary, Sixteenth Floor, One 2. The nature of the requester’s right
speciality steel and super alloy White Flint North, 11555 Rockville under the Act to be made a party to the
additives. Pyrochlore contains more Pike, Rockville, MD 20852, Attention: proceeding;

VerDate Aug<31>2005 16:31 Nov 16, 2006 Jkt 211001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\17NON1.SGM 17NON1
Federal Register / Vol. 71, No. 222 / Friday, November 17, 2006 / Notices 66987

3. The nature and extent of the significantly from the data or Volume 2 (ML053340210) and
requester’s property, financial or other conclusions in the licensee’s Volume 3 (ML053330384).
interest in the proceeding; documents. Otherwise, contentions may —U.S. Nuclear Regulatory
4. The possible effect of any decision be amended or new contentions filed Commission’s letter rejecting the
or order that may be issued in the after the initial filing only with leave of Decommissioning Plan dated January
proceeding on the requester’s interest; the presiding officer. 26, 2006 (ML060180551)
and Each contention shall be given a —Summary of March 9, 2006 Nuclear
5. The circumstances establishing that separate numeric or alpha designation Regulatory Commission Meeting with
the request for a hearing is timely in within one of the following groups: Shieldalloy Metallurgical Corporation
accordance with 10 CFR 2.309(b). 1. Technical—primarily concerns (ML061070401)
In accordance with 10 CFR 2.309 issues relating to matters discussed or —Shieldalloy Metallurgical Corporation
(f)(1), a request for hearing or petitions referenced in the Safety Evaluation Supplement to Decommissioning Plan
for leave to intervene must set forth Report for the proposed action. dated June 30, 2006 ( ML061980092)
with particularity the contentions —U.S. Nuclear Regulatory
2. Environmental—primarily concerns
sought to be raised. For each contention, Commission’s letter accepting the
issues relating to matters discussed or
the request or petition must: Decommissioning Plan for technical
referenced in the Environmental Report
1. Provide a specific statement of the review dated October 18, 2006
for the proposed action.
issue of law or fact to be raised or (ML062580126)
3. Miscellaneous—does not fall into
controverted; one of the categories outlined above. If you do not have access to ADAMS
2. Provide a brief explanation of the or if there are problems in accessing the
If the requester/petitioner believes a
basis for the contention; documents located in ADAMS, contact
contention raises issues that cannot be
3. Demonstrate that the issue raised in the NRC Public Document Room (PDR)
classified as primarily falling into one of
the contention is within the scope of the Reference staff at 1–800–397–4209, 301–
these categories, the requester/petitioner
proceeding; 415–4737, or by e-mail to pdr@nrc.gov.
4. Demonstrate that the issue raised in must set forth the contention and
supporting bases, in full, separately for These documents may also be viewed
the contention is material to the electronically on the public computers
findings that the NRC must make to each category into which the requester/
petitioner asserts the contention belongs located at the NRC’s PDR, O 1 F21, One
support the action that is involved in White Flint North, 11555 Rockville
the proceeding; with a separate designation for that
category. Pike, Rockville, MD 20852. The PDR
5. Provide a concise statement of the reproduction contractor will copy
alleged facts or expert opinions which Requesters/petitioners should, when
possible, consult with each other in documents for a fee.
support the requester’s/petitioner’s
position on the issue and on which the preparing contentions and combine Dated at Rockville, Maryland this 9th day
similar subject matter concerns into a of November 2006.
requester/petitioner intends to rely to
joint contention, for which one of the For the Nuclear Regulatory Commission.
support its position on the issue; and
6. Provide sufficient information to co-sponsoring requesters/petitioners is Rebecca Tadesse,
show that a genuine dispute exists with designated the lead representative. Branch Chief, Decommissioning Directorate,
the applicant on a material issue of law Further, in accordance with 10 CFR Division of Waste Management and
2.309(f)(3), any requester/petitioner that Environmental Protection, Office of Federal
or fact. This information must include
wishes to adopt a contention proposed and State Materials and Environmental
references to specific portions of SMC’s Management Programs.
revised DP (including the applicant’s by another requester/petitioner must do
so in writing within ten days of the date [FR Doc. E6–19433 Filed 11–16–06; 8:45 am]
environmental report) that the
requester/petitioner disputes and the the contention is filed, and designate a BILLING CODE 7590–01–P

supporting reasons for each dispute, or, representative who shall have the
if the requester/petitioner believes the authority to act for the requester/
revised DP fails to contain information petitioner. OCCUPATIONAL SAFETY AND
on a relevant matter as required by law, In accordance with 10 CFR 2.309(g), HEALTH REVIEW COMMISSION
the identification of each failure and the a request for hearing and/or petition for
leave to intervene may also address the No FEAR Act
supporting reasons for the requester’s/
petitioner’s belief. selection of the hearing procedures, AGENCY: Occupational Safety and Health
In addition, in accordance with 10 taking into account the provisions of 10 Review Commission.
CFR 2.309(f)(2), contentions must be CFR 2.310. ACTION: Notice.
based on documents or other IV. Further Information
information available at the time the SUMMARY: The Occupational Safety and
petition is to be filed, such as the Documents related to this action, Health Review Commission (OSHRC) is
revised DP, supporting safety analysis including the revised DP and supporting publishing this notice under the
report, environmental report or other documentation, are available ‘‘Notification and Federal Employee
supporting document filed by the electronically at the NRC’s Electronic Antidiscrimination and Retaliation Act
licensee, or otherwise available to the Reading Room at http://www.nrc.gov/ of 2002,’’ which is known as the No
petitioner. On issues arising under the reading-rm/adams.html. From this site, FEAR Act, to inform current employees,
National Environmental Policy Act, the you can access the NRC’s Agencywide former employees, and applicants for
requester/petitioner shall file Document Access and Management OSHRC employment of the rights and
contentions based on the licensee’s System (ADAMS), which provides text protections available to them under
environmental report. The requester/ and image files of NRC’s public Federal antidiscrimination,
jlentini on PROD1PC65 with NOTICES

petitioner may amend those contentions documents. The ADAMS accession whistleblower protection, and
or file new contentions if there are data numbers for the documents related to retaliation laws.
or conclusions in the NRC draft, or final this notice are: DATES: November 17, 2006.
environmental impact statement, or any —Decommissioning Plan dated October FOR FURTHER INFORMATION CONTACT:
supplements relating thereto, that differ 21, 2005: Volume 1 (ML053190220), Angela Roach, EEO Officer,

VerDate Aug<31>2005 16:31 Nov 16, 2006 Jkt 211001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\17NON1.SGM 17NON1

Anda mungkin juga menyukai