Anda di halaman 1dari 2

58598 Federal Register / Vol. 71, No.

192 / Wednesday, October 4, 2006 / Notices

proposed field of axial free flow an unequivocal statement of intent to on the Commission’s Web site under the
turbines having a total installed capacity submit, if such an application may be ‘‘e-Filing’’ link. The Commission
of up to 124 megawatts, (2) proposed filed, either a preliminary permit strongly encourages electronic filings.
transmission line, and (3) appurtenant application or a development u. Agency Comments: Federal, state,
facilities. The project would have an application (specify which type of and local agencies are invited to file
annual generation of 460 gigawatt- application). A notice of intent must be comments on the described application.
hours. served on the applicant(s) named in this A copy of the application may be
m. Locations of Applications: A copy public notice. obtained by agencies directly from the
of the application is available for r. Proposed Scope of Studies Under Applicant. If an agency does not file
inspection and reproduction at the Permit: A preliminary permit, if issued, comments within the time specified for
Commission in the Public Reference does not authorize construction. The filing comments, it will be presumed to
Room, located at 888 First Street, NE., term of the proposed preliminary permit have no comments. One copy of an
Room 2A, Washington DC 20426, or by would be 36 months. The work agency’s comments must also be sent to
calling (202) 502–8371. This filing may proposed under the preliminary permit the Applicant’s representatives.
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering Magalie R. Salas,
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Secretary.
number excluding the last three digits in impacts. Based on the results of these [FR Doc. E6–16344 Filed 10–3–06; 8:45 am]
the docket number field to access the studies, the Applicant would decide BILLING CODE 6717–01–P
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project. DEPARTMENT OF ENERGY
call (202) 502–8659. A copy is also s. Comments, Protests, or Motions To
available for inspection and Intervene: Anyone may submit Federal Energy Regulatory
reproduction at the address in item h. comments, a protest, or a motion to Commission
above. intervene in accordance with the
n. Individuals desiring to be included requirements of Rules of Practice and Notice of Application Accepted for
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Filing and Soliciting Comments,
so indicate by writing to the Secretary In determining the appropriate action to Motions to Intervene, and Protests
of the Commission. take, the Commission will consider all September 27, 2006.
o. Competing Preliminary Permit: protests or other comments filed, but Take notice that the following
Anyone desiring to file a competing only those who file a motion to hydroelectric application has been filed
application for preliminary permit for a intervene in accordance with the with the Commission and is available
proposed project must submit the Commission’s Rules may become a for public inspection:
competing application itself, or a notice party to the proceeding. Any comments, a. Type of Application: Preliminary
of intent to file such an application, to protests, or motions to intervene must Permit.
the Commission on or before the be received on or before the specified b. Project No: 12739–000.
specified comment date for the comment date for the particular c. Date Filed: September 18, 2006.
particular application (see 18 CFR 4.36). application. d. Applicant: Fishers Island Tidal
Submission of a timely notice of intent t. Filing and Service of Responsive Energy Inc.
allows an interested person to file the Documents: Any filings must bear in all e. Name of Project: Fisher Island Tidal
competing preliminary permit capital letters the title ‘‘COMMENTS’’, Energy Project.
application no later than 30 days after ‘‘NOTICE OF INTENT TO FILE f. Location: The proposed tidal project
the specified comment date for the COMPETING APPLICATION’’, would be located on Long Island Sound
particular application. A competing ‘‘COMPETING APPLICATION’’, in Suffolk County, New York.
preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO g. Filed Pursuant to: Federal Power
conform with 18 CFR 4.30(b) and 4.36. INTERVENE’’, as applicable, and the Act, 16 U.S.C. 791(a)–825(r).
p. Competing Development Project Number of the particular h. Applicant Contacts: Mr. Kevin G.
Application: Any qualified development application to which the filing refers. Lynch, Fishers Island Tidal Energy Inc.,
applicant desiring to file a competing Any of the above-named documents 1037 Ashe Street, Davidsonville, MD
development application must submit to must be filed by providing the original 21035, (410) 956–6599.
the Commission, on or before a and the number of copies provided by i. FERC Contact: Mr. Robert Bell,
specified comment date for the the Commission’s regulations to: The (202) 502–4126.
particular application, either a Secretary, Federal Energy Regulatory j. Deadline for filing motions to
competing development application or a Commission, 888 First Street, NE., intervene, protests and comments: 60
notice of intent to file such an Washington, DC 20426. An additional days from the issuance date of this
application. Submission of a timely copy must be sent to Director, Division notice.
notice of intent to file a development of Hydropower Administration and All documents (original and eight
application allows an interested person Compliance, Federal Energy Regulatory copies) should be filed with: Magalie R.
to file the competing application no Commission, at the above-mentioned Salas, Secretary, Federal Energy
later than 120 days after the specified address. A copy of any notice of intent, Regulatory Commission, 888 First
comment date for the particular competing application or motion to Street, NE., Washington, DC 20426.
application. A competing license intervene must also be served upon each Comments, protests, and interventions
application must conform with 18 CFR representative of the Applicant may be filed electronically via the
rwilkins on PROD1PC63 with NOTICES

4.30(b) and 4.36. specified in the particular application. Internet in lieu of paper; see 18 CFR
q. Notice of Intent: A notice of intent Comments, protests and interventions 385.2001(a)(1)(iii) and the instructions
must specify the exact name, business may be filed electronically via the on the Commission’s Web site under the
address, and telephone number of the Internet in lieu of paper; see 18 CFR ‘‘e-Filing’’ link. The Commission
prospective applicant, and must include 385.2001(a)(1)(iii) and the instructions strongly encourages electronic filings.

VerDate Aug<31>2005 14:45 Oct 03, 2006 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1
Federal Register / Vol. 71, No. 192 / Wednesday, October 4, 2006 / Notices 58599

Please include the project number (P– p. Competing Development Project Number of the particular
12739–000) on any comments or Application: Any qualified development application to which the filing refers.
motions filed. applicant desiring to file a competing Any of the above-named documents
The Commission’s Rules of Practice development application must submit to must be filed by providing the original
and Procedure require all intervenors the Commission, on or before a and the number of copies provided by
filing documents with the Commission specified comment date for the the Commission’s regulations to: The
to serve a copy of that document on particular application, either a Secretary, Federal Energy Regulatory
each person in the official service list competing development application or a Commission, 888 First Street, NE.,
for the project. Further, if an intervenor notice of intent to file such an Washington, DC 20426. An additional
files comments or documents with the application. Submission of a timely copy must be sent to Director, Division
Commission relating to the merits of an notice of intent to file a development of Hydropower Administration and
issue that may affect the responsibilities application allows an interested person Compliance, Federal Energy Regulatory
of a particular resource agency, they to file the competing application no Commission, at the above-mentioned
must also serve a copy of the document later than 120 days after the specified address. A copy of any notice of intent,
on that resource agency. comment date for the particular competing application or motion to
k. Competing Application: Project No. application. A competing license intervene must also be served upon each
12732–000, Date Filed: August 29, 2006, application must conform with 18 CFR representative of the Applicant
Date Issued: September 19, 2006, Due 4.30(b) and 4.36. specified in the particular application.
Date: November 18, 2006. q. Notice of Intent: A notice of intent Comments, protests and interventions
l. Description of Project: The proposed must specify the exact name, business may be filed electronically via the
Tidal project would consist of: (1) a address, and telephone number of the Internet in lieu of paper; see 18 CFR
proposed field of axial free flow prospective applicant, and must include 385.2001(a)(1)(iii) and the instructions
turbines having a total installed capacity an unequivocal statement of intent to on the Commission’s Web site under the
ranging from 93 to 410 megawatts, (2) submit, if such an application may be ‘‘e-Filing’’ link. The Commission
proposed transmission line; and (3) filed, either a preliminary permit strongly encourages electronic filings
appurtenant facilities. The project application or a development u. Agency Comments: Federal, state,
would have an annual generation of 345 application (specify which type of and local agencies are invited to file
application). A notice of intent must be comments on the described application.
to 1540 gigawatt-hours.
served on the applicant(s) named in this A copy of the application may be
m. Locations of Applications: A copy
public notice. obtained by agencies directly from the
of the application is available for r. Proposed Scope of Studies under
inspection and reproduction at the Applicant. If an agency does not file
Permit: A preliminary permit, if issued,
Commission in the Public Reference comments within the time specified for
does not authorize construction. The
Room, located at 888 First Street, NE., filing comments, it will be presumed to
term of the proposed preliminary permit
Room 2A, Washington DC 20426, or by have no comments. One copy of an
would be 36 months. The work
calling (202) 502–8371. This filing may agency’s comments must also be sent to
proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis, the Applicant’s representatives.
Web site at http://www.ferc.gov using preparation of preliminary engineering Magalie R. Salas,
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental Secretary.
number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the [FR Doc. E6–16345 Filed 10–3–06; 8:45 am]
studies, the Applicant would decide BILLING CODE 6717–01–P
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also DEPARTMENT OF ENERGY
s. Comments, Protests, or Motions to
available for inspection and Intervene: Anyone may submit Federal Energy Regulatory
reproduction at the address in item h. comments, a protest, or a motion to Commission
above. intervene in accordance with the
n. Individuals desiring to be included requirements of Rules of Practice and Notice of Application Accepted for
on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214. Filing and Soliciting Motions To
so indicate by writing to the Secretary In determining the appropriate action to Intervene, Protests, and Comments
of the Commission. take, the Commission will consider all
o. Competing Preliminary Permit: protests or other comments filed, but September 27, 2006.
Anyone desiring to file a competing only those who file a motion to Take notice that the following
application for preliminary permit for a intervene in accordance with the hydroelectric application has been filed
proposed project must submit the Commission’s Rules may become a with the Commission and is available
competing application itself, or a notice party to the proceeding. Any comments, for public inspection:
of intent to file such an application, to protests, or motions to intervene must a. Type of Application: Preliminary
the Commission on or before the be received on or before the specified Permit.
specified comment date for the comment date for the particular b. Project No.: 12718–000.
particular application (see 18 CFR 4.36). application. c. Date filed: July 20, 2006.
Submission of a timely notice of intent t. Filing and Service of Responsive d. Applicant: Natural Currents Energy
allows an interested person to file the Documents: Any filings must bear in all Services, LLC.
competing preliminary permit capital letters the title ‘‘COMMENTS’’, e. Name of Project: Wards Island
rwilkins on PROD1PC63 with NOTICES

application no later than 30 days after ‘‘NOTICE OF INTENT TO FILE Tidal Power Project.
the specified comment date for the COMPETING APPLICATION’’, f. Location: The project would be
particular application. A competing ‘‘COMPETING APPLICATION’’, located in the East River, off the south
preliminary permit application must ‘‘PROTEST’’, or ‘‘MOTION TO point of Wards Island in Hell’s Gate in
conform with 18 CFR 4.30(b) and 4.36. INTERVENE’’, as applicable, and the New York County, New York.

VerDate Aug<31>2005 14:45 Oct 03, 2006 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\04OCN1.SGM 04OCN1

Anda mungkin juga menyukai