41798 Federal Register / Vol. 71, No.

141 / Monday, July 24, 2006 / Notices

the original and the number of copies Street, NE., Washington, DC 20426. notice of intent to file a development
provided by the Commission’s Please include the project number (P– application allows an interested person
regulations to: The Secretary, Federal 12683–000) on any comments, protests, to file the competing application no
Energy Regulatory Commission, 888 or motions filed. later than 120 days after the specified
First Street, NE., Washington, DC 20426. k. Description of Project: The comment date for the particular
A copy of any motion to intervene must proposed project would utilize the application. A competing license
also be served upon each representative existing U.S. Army Corps of Engineers’ application must conform with 18 CFR
of the Applicant specified in the R. D. Bailey Dam and would consist of: 4.30(b) and 4.36.
particular application. (1) A proposed powerhouse containing p. Notice of Intent: A notice of intent
t. Agency Comments: Federal, state, two vertical turbine/generating units must specify the exact name, business
and local agencies are invited to file with a nominal total generating capacity address, and telephone number of the
comments on the described application. of 7.8-Megawatts; (2) a 10-foot-diameter prospective applicant, and must include
A copy of the application may be penstock; (3) a proposed 6.5 mile-long, an unequivocal statement of intent to
obtained by agencies directly from the 14.7 kV transmission line; (4) a tailrace, submit, if such an application may be
Applicant. If an agency does not file and (5) appurtenant facilities. filed, either a preliminary permit
comments within the time specified for The project would have an estimated application or a development
filing comments, it will be presumed to annual generation of approximately application (specify which type of
have no comments. One copy of an 30,000 MW. The applicant plans to sell application). A notice of intent must be
agency’s comments must also be sent to the generated energy. served on the applicant(s) named in this
the Applicant’s representatives. l. Location of Application: A copy of public notice.
the application is available for q. Proposed Scope of Studies under
Magalie R. Salas, inspection and reproduction at the Permit: A preliminary permit, if issued,
Secretary. Commission in the Public Reference does not authorize construction. The
[FR Doc. E6–11658 Filed 7–21–06; 8:45 am] Room, located at 888 First Street, NE., term of the proposed preliminary permit
BILLING CODE 6717–01–P Room 2A, Washington, DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
also be viewed on the Commission’s would include economic analysis,
DEPARTMENT OF ENERGY Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Federal Energy Regulatory number excluding the last three digits in impacts. Based on the results of these
Commission the docket number field to access the studies, the Applicant would decide
document. For assistance, call toll-free whether to proceed with the preparation
Notice of Application Accepted for 1–866–208–3676 or e-mail of a development application to
Filing and Soliciting Motions To FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
Intervene, Protests and Comments call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
July 14, 2006. available for inspection and Intervene: Anyone may submit
Take notice that the following reproduction at the address in item h comments, a protest, or a motion to
hydroelectric application has been filed above. intervene in accordance with the
m. Individuals desiring to be included requirements of Rules of Practice and
with the Commission and is available
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211,
for public inspection:
a. Type of Application: Preliminary so indicate by writing to the Secretary 385.214. In determining the appropriate
Permit. of the Commission. action to take, the Commission will
b. Project No.: 12683–000. n. Competing Preliminary Permit: consider all protests or other comments
c. Date filed: June 7, 2006. Anyone desiring to file a competing filed, but only those who file a motion
d. Applicant: Three Guys application for preliminary permit for a to intervene in accordance with the
Hydroelectric Company, LLC. proposed project must submit the Commission’s Rules may become a
e. Name of Project: R.D. Bailey competing application itself, or a notice party to the proceeding. Any comments,
Hydroelectric Project. of intent to file such an application, to protests, or motions to intervene must
f. Location: On Guyandotte River, in the Commission on or before the be received on or before the specified
Wyoming and Mingo Counties, West specified comment date for the comment date for the particular
Virginia. The R.D. Bailey Dam is owned particular application (see 18 CFR 4.36). application.
and operated by the U.S.Army Corps of Submission of a timely notice of intent Comments, protests and interventions
Engineers. allows an interested person to file the may be filed electronically via the
g. Filed Pursuant to: Federal Power competing preliminary permit Internet in lieu of paper; See 18 CFR
Act, 16 U.S.C. 791(a)–825(r). application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions
h. Applicant Contacts: Mr. M. Clifford the specified comment date for the on the Commission’s web site under ‘‘e-
Phillips, Advanced Hydro Solutions particular application. A competing filing’’ link. The Commission strongly
LLC, 150 North Miller Road, Suite 450 preliminary permit application must encourages electronic filing.
C, Fairlawn, OH 44333, (330) 869–8451. conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
i. FERC Contact: Patricia W. Gillis at o. Competing Development Documents: Any filings must bear in all
(202) 502–8735. Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
j. Deadline for filing comments, applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
protests, and motions to intervene: 60 development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’,
days from the issuance date of this the Commission, on or before a ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
sroberts on PROD1PC70 with NOTICES

notice. specified comment date for the OF INTENT’’, or ‘‘COMPETING


All documents (original and eight particular application, either a APPLICATION’’, as applicable, and the
copies) should be filed with Magalie R. competing development application or a Project Number of the particular
Salas, Secretary, Federal Energy notice of intent to file such an application to which the filing refers.
Regulatory Commission, 888 First application. Submission of a timely Any of the above-named documents

VerDate Aug<31>2005 17:54 Jul 21, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\24JYN1.SGM 24JYN1
Federal Register / Vol. 71, No. 141 / Monday, July 24, 2006 / Notices 41799

must be filed by providing the original application to delete an additional 4.5 p. Agency Comments: Federal, state,
and the number of copies provided by MW turbine unit, which was approved and local agencies are invited to file
the Commission’s regulations to: The in the new license issued in 1992, but comments on the described application.
Secretary, Federal Energy Regulatory was never installed. The proposed A copy of the application may be
Commission, 888 First Street, NE., amendment would decrease the obtained by agencies directly from the
Washington, DC 20426. A copy of any authorized installed capacity of the Applicant. If an agency does not file
motion to intervene must also be served project from 12.4 MW to 7.9 MW. comments within the time specified for
upon each representative of the l. Locations of the Application: A filing comments, it will be presumed to
Applicant specified in the particular copy of the application is available for have no comments. One copy of an
application. inspection and reproduction at the agency’s comments must also be sent to
t. Agency Comments: Federal, state, Commission’s Public Reference Room, the Applicant’s representatives.
and local agencies are invited to file located at 888 First Street, NE., Room q. Comments, protests and
comments on the described application. 2A, Washington, DC 20426, or by calling interventions may be filed electronically
A copy of the application may be (202) 502–8371. Information about this via the Internet in lieu of paper. See, 18
obtained by agencies directly from the filing may also be viewed on the CFR 385.2001(a)(1)(iii) and the
applicant. If an agency does not file Commission’s Web site at http:// instructions on the Commission’s Web
comments within the time specified for www.ferc.gov using the ‘‘eLibrary’’ link. site at http://www.ferc.gov under the ‘‘e-
filing comments, it will be presumed to Enter the docket number excluding the Filing’’ link.
have no comments. One copy of an last three digits in the docket number
field to access the document. You may Magalie R. Salas,
agency’s comments must also be sent to
the Applicant’s representatives. also register online at http:// Secretary.
www.ferc.gov/docs-filing/ [FR Doc. E6–11662 Filed 7–21–06; 8:45 am]
Magalie R. Salas, esubscription.asp to be notified via e- BILLING CODE 6717–01–P
Secretary. mail of new filings and issuances
[FR Doc. E6–11659 Filed 7–21–06; 8:45 am] related to this or other pending projects.
BILLING CODE 6717–01–P For assistance, call 1–866–208–3676 or DEPARTMENT OF ENERGY
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is Federal Energy Regulatory
DEPARTMENT OF ENERGY also available for inspection and Commission
reproduction at the address in item (h) [P–2299—057]
Federal Energy Regulatory above.
Commission m. Individuals desiring to be included Modesto Irrigation District; Turlock
on the Commission’s mailing list should Irrigation District; Agenda for Meeting
Notice of Application for Amendment so indicate by writing to the Secretary To Discuss the 10-Year Fisheries
of License and Soliciting Comments, of the Commission. Summary Report for the Don Pedro
Motions To Intervene, and Protests n. Comments, Protests, or Motions to Project
July 14, 2006. Intervene: Anyone may submit
comments, a protest, or a motion to July 14, 2006.
Take notice that the following
intervene in accordance with the The Modesto Irrigation District and
application has been filed with the
requirements of Rules of Practice and the Turlock Irrigation District (licensees)
Commission and is available for public
Procedure, 18 CFR 385.210, 385.211, filed a Fisheries Summary Report on
inspection:
a. Application Type: Non-Capacity 385.214. In determining the appropriate March 25, 2005, pursuant to Article 58
Amendment of License. action to take, the Commission will of the license, as amended. 1 A notice
b. Project No.: 2423–024. consider all protests or other comments issued by the Commission on June 23,
c. Date Filed: March 13, 2006. filed, but only those who file a motion 2006 stated that Commission staff will
d. Applicant: Great Lakes Hydro to intervene in accordance with the conduct a public meeting based on the
America, LLC. Commission’s Rules may become a filings of the licensees’ report and
e. Name of Project: Riverside party to the proceeding. Any comments, comments received to date. The meeting
Hydroelectric Project. protests, or motions to intervene must will be held on Tuesday, July 25, 2006,
f. Location: The project is located on be received on or before the specified from 9 a.m. to 5 p.m. (PST) at the John
the Androscoggin River, in Coos comment date for the particular E. Moss Federal Building and
County, New Hampshire. application. Courthouse, 650 Capitol Mall, Stanford
g. Filed Pursuant to: Federal Power o. Filing and Service of Responsive Room, 1st floor, Sacramento, California
Act, 16 U.S.C. 791a–825r. Documents: Any filings must bear in all 95814. The following is the agenda for
h. Applicant Contact: Mr. Kevin capital letters the title ‘‘COMMENTS’’, the meeting:
Bernier, Environmental and FERC ‘‘RECOMMENDATIONS FOR TERMS 9 a.m.–9:15 a.m. Introductions/
Compliance Specialist, Great Lakes AND CONDITIONS’’, ‘‘PROTEST’’, OR Purpose for Meeting (FERC).
Hydro America, LLC, 1014 Central ‘‘MOTION TO INTERVENE’’, as 9:15 a.m.–9:30 a.m. History/
Street, Millinocket, ME 04462, applicable, and the Project Number of Background Overview (FERC).
telephone: (207) 723–4241. the particular application to which the 9:30 a.m.–10:30 a.m. Technical
i. FERC Contact: Any questions on filing refers. All documents (original Review/Assessment/Questions
this notice should be addressed to Mrs. and eight copies) should be filed with: (FERC) .
Anumzziatta Purchiaroni at (202) 502– Magalie R. Salas, Secretary, Federal 10:30 a.m.–10:45 a.m. Break.
6191, or e-mail address: Energy Regulatory Commission, 888 10:45 a.m.–noon Agencies/Licensees/
sroberts on PROD1PC70 with NOTICES

anumzziatta.purchiaroni@ferc.gov. First Street, NE., Washington DC 20426. NGOs Presentations/Statements/


j. Deadline for filing comments and or A copy of any motion to intervene must Questions.
motions: July 31, 2006. also be served upon each representative Noon–1:15 p.m. Lunch.
k. Description of Request: The of the Applicant specified in the
licensee filed an amendment particular application. 1 See 76 FERC ¶ 61, 117 (1996)

VerDate Aug<31>2005 17:54 Jul 21, 2006 Jkt 208001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\24JYN1.SGM 24JYN1