Anda di halaman 1dari 2

Federal Register / Vol. 71, No.

129 / Thursday, July 6, 2006 / Notices 38429

will prepare the submission requesting Program as originally conceived is ACTION: Notice of the OMB review of
that OMB approve clearance of this achieving its objectives and program- information collection and solicitation
collection for no longer than 1 year. level outcomes, and to collect lessons of public comment.
DATES: Written comments on this notice learned for improvement of program
design and implementation. This short- SUMMARY: The NRC has recently
must be received by September 7, 2006
term evaluation is expected to provide submitted to OMB for review the
to be assured of consideration.
information on what educational and following proposal for the collection of
Comments received after that date will
career decisions have ben affected by information under the provisions of the
be considered to the extent practicable.
participation in a Summer Institute, Paperwork Reduction Act of 1995 (44
FOR FURTHER INFORMATION CONTACT: U.S.C. Chapter 35). The NRC hereby
Suzanne Plimpton, Reports Clearance what elements of the students’ BBSI
affect student outcomes, and how the informs potential respondents that an
Officer, National Science Foundation, agency may not conduct or sponsor, and
4201 Wilson Boulevard, Suite 295, program can be improved, e.g., through
changes in specific program-wide that a person is not required to respond
Arlington, Virginia 22230; telephone to, a collection of information unless it
(703) 292–7556; or send e-mail to design components, expected outcomes,
proposal review criteria, etc. displays a currently valid OMB control
splimpto@nsf.gov. Individuals who use number.
a telecommunications device for the The survey data collection will be
done on the World Wide Web. 1. Type of submission, new, revision,
deaf (TDD) may call the Federal or extension: Revision.
Information Relay Service (FIRS) at 1– Estimate of Burden: Public reporting
burden for this collection of information 2. The title of the information
800–877–8339 between 8 a.m. and 8 collection: NRC Form 244, Registration
p.m., Eastern time, Monday through is estimated to average 30 minutes per
response. Certificate—Use of Depleted Uranium
Friday. You may obtain a copy of the under General License.
data collection instrument and Respondents: Individuals.
3. The form number if applicable:
instructions from Ms. Plimpton. Estimated Number of Responses per
NRC Form 244.
Form: 800.
SUPPLEMENTARY INFORMATION: 4. How often the collection is
Title of Collection: Evaluation of the Estimated Total Annual Burden on
required: On occasion. NRC Form 244 is
National Science Foundation—National Respondents: 400 hours (880
submitted when depleted uranium is
Institutes for Health Bioengineering and respondents at 30 minutes per
received or transferred under general
Bioinformatics Summer Institutes response).
license. Information on NRC Form 244
(BBSI) Program. Frequency of Response: Once.
is collected and evaluated on a
OMB Number: 3145–0121. Comments: Comments are invited on
continuing basis as events occur.
Expiration Date of Approval: One (a) whether the proposed collection of 5. Who will be required or asked to
year. information is necessary for the proper report: Persons receiving, possessing,
Type of Request: Reinstate and performance of the functions of the using, or transferring depleted uranium
modify. Agency, including whether the under the general license established in
Abstract: The National Science information shall have practical utility; 10 CFR 40.25(a).
Foundation (NSF) and the National (b) the accuracy of the Agency’s 6. An estimate of the number of
Institute of Bioinformatics and estimate of the burden of the proposed annual responses: 5 (2 NRC licensees
Bioengineering (NIBIB), a new collection of information; (c) ways to and 3 Agreement State licensees).
component of the National Institutes of enhance the quality, utility, and clarity 7. The estimated number of annual
Health, established a jointly funded of the information on respondents, respondents: 5 (2 NRC licensees and 3
program run by NSF called the including through the use of automated Agreement State licensees).
Bioengineering and Bioinformatics collection techniques or other forms of 8. The number of hours needed
Summer Institutes (BBSI) Program to information technology; (d) ways to annually to complete the requirement or
begin creating a supply of professionals minimize the burden of the collection of request: 5 (1 hour per response—2 hours
trained in bioengineering and information on those who are to for NRC licensees and 3 hours for
bioinformatics. This workforce initiative respond, including through the use of Agreement State licensees).
complements research and education appropriate automated, electronic, 9. An indication of whether section
efforts in these fields funded by both mechanical or other technological 3507(d), Public Law 104–13 applies: Not
agencies and constitutes a high profile collection techniques or other forms of applicable.
effort to meet the anticipated human information technology. 10. Abstract: 10 CFR part 40
resource needs for bioengineering and Dated: June 30, 2006. establishes requirements for licenses for
bioinformatices. Catherine J. Hines, the receipt, possession, use and transfer
The program is designed to provide Acting Reports Clearance Officer, National of radioactive source and byproduct
students majoring in the biological Science Foundation. material. NRC Form 244 is used to
sciences, computer sciences, [FR Doc. 06–6008 Filed 7–5–06; 8:45 am] report receipt and transfer of depleted
engineering, mathematics, and physical BILLING CODE 7555–01–M
uranium under general license, as
sciences with well planned required by section 40.25. The
interdisciplinary experiences in registration certification information
bioengineering or bioinformatics required by NRC Form 244 is necessary
research and education, in very active NUCLEAR REGULATORY to permit the NRC to make a
‘Summer Institutes’; thereby increasing COMMISSION determination on whether the
the number of young people considering Agency Information Collection possession, use, and transfer of depleted
careers in bioengineering and Activities: Submission for the Office of uranium source and byproduct material
jlentini on PROD1PC65 with NOTICES

bioinformatics at the graduate level and Management and Budget (OMB) is in conformance with the
beyond. Review; Comment Request Commission’s regulations for protection
NIBIB and NSF’s Division of of public health and safety.
Engineering Education and Centers AGENCY:U. S. Nuclear Regulatory A copy of the final supporting
(EEC) wish to learn whether the BBSI Commission (NRC). statement may be viewed free of charge

VerDate Aug<31>2005 17:01 Jul 05, 2006 Jkt 208001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\06JYN1.SGM 06JYN1
38430 Federal Register / Vol. 71, No. 129 / Thursday, July 6, 2006 / Notices

at the NRC Public Document Room, One Nuclear Management Company, LLC For the Nuclear Regulatory Commission.
White Flint North, 11555 Rockville (NMC) Palisades Nuclear Plant (PNP). L. Raynard Wharton,
Pike, Room O–1 F21, Rockville, MD The petitioners’ request that the NRC Senior Project Manager, Spent Fuel Project
20852. OMB clearance requests are take enforcement action against PNP by Office, Office of Nuclear Material Safety and
available at the NRC worldwide Web condemning and stopping the use of the Safeguards.
site: http://www.nrc.gov/public-involve/ two independent spent fuel storage [FR Doc. E6–10525 Filed 7–5–06; 8:45 am]
doc-comment/omb/index.html. The installation (ISFSI) concrete pads, BILLING CODE 7590–01–P
document will be available on the NRC constructed in 1992 and 2003, which
home page site for 60 days after the hold dry spent fuel storage casks at the
signature date of this notice. plant site. NUCLEAR REGULATORY
Comments and questions should be COMMISSION
directed to the OMB reviewer listed Request
[Docket Nos. 50–361 and 50–362]
below by August 7, 2006. Comments
As the basis for the request, the
received after this date will be Southern California Edison Company,
petitioners state that both ISFSI concrete
considered if it is practical to do so, but San Diego Gas and Electric Company,
pads at PNP do not conform to NRC
assurance of consideration cannot be the City of Riverside, CA, the City of
requirements for earthquake stability
given to comments received after this Anaheim, CA; San Onofre Nuclear
date. John A. Asalone, Office of standards and pose a distinct hazard in
the event of an earthquake. Generating Station, Units 2 and 3;
Information and Regulatory Affairs Exemption
(3150–0031), NEOB–10202, Office of The request concerning slope stability
Management and Budget, Washington, of the 2003 concrete pad is being treated 1.0 Background
DC 20503. pursuant to 10 CFR 2.206 of the Southern California Edison Company
Comments can also be e-mailed to Commission’s regulations. The request (the licensee) is the holder of Facility
John_A._Asalone@omb.eop.gov or has been referred to the Director of the Operating License Nos. NPF–10 and
submitted by telephone at (202) 395– Spent Fuel Project Office within the NPF–15, which authorize operation of
4650. Office of Nuclear Material Safety and the San Onofre Nuclear Generating
The NRC Clearance Officer is Brenda Safeguards. As provided by 10 CFR Station, Unit 2 and Unit 3 (SONGS 2
Jo. Shelton, 301–415–7233. 2.206, appropriate action will be taken and 3), respectively. The licenses
Dated at Rockville, Maryland, this 29th day on this petition within a reasonable provide, among other things, that the
of June, 2006. time. Representatives of Mr. Lodge facility is subject to all rules,
For the Nuclear Regulatory Commission. spoke with the Petition Review Board regulations, and orders of the U.S.
Brenda Jo. Shelton, on April 26, 2006, to discuss the Nuclear Regulatory Commission (NRC,
NRC Clearance Officer, Office of Information petition. The results of that discussion the Commission) now or hereafter in
Services. were considered in the Board’s effect.
[FR Doc. E6–10523 Filed 7–5–06; 8:45 am] determination regarding condemning The facility consists of two
BILLING CODE 7590–01–P
and stopping the use of the two ISFSI pressurized-water reactors located in
concrete pads and in establishing a San Diego County, California.
schedule for the review of the petition.
2.0 Request/action
NUCLEAR REGULATORY By letter dated June 27, 2006, the Spent
COMMISSION Fuel Project Office Deputy Director Title 10 of the Code of Federal
accepted the petition for review in part, Regulations (10 CFR), Part 50, Appendix
[Docket Nos. 72–7 and 50–255; License No. G, which is invoked by 10 CFR 50.60,
DPR–20]
specifically with respect to slope
stability of the concrete pad constructed requires that pressure-temperature (P-T)
Nuclear Management Company, LLC; in 2003. limits be established for reactor pressure
Consideration of Request for Action vessels (RPVs) during normal operating
Further Information and hydrostatic or leak rate testing
Under 10 CFR 2.206
conditions. Specifically, 10 CFR Part 50,
A copy of the petition may be
AGENCY: Nuclear Regulatory Appendix G, states that ‘‘[t]he
inspected at NRC’s Public Electronic
Commission. appropriate requirements on both the
Reading Room at http://www.nrc.gov/
ACTION: Receipt and consideration of pressure-temperature limits and the
reading-rm/adams.html. This document
request for action under 10 CFR 2.206. minimum permissible temperature must
may also be viewed electronically on
be met for all conditions,’’ and ‘‘[t]he
the public computers located at the
FOR FURTHER INFORMATION CONTACT: L. pressure-temperature limits identified
NRC’s Public Document Room (PDR),
Raynard Wharton, Senior Project as ‘ASME [American Society for
O–1F21, One White Flint North, 11555
Manager, Spent Fuel Project Office, Mechanical Engineers] Appendix G
Rockville Pike, Rockville, MD 20852.
Office of Nuclear Material Safety and limits’ in Table 3 require that the limits
The PDR reproduction contractor will
Safeguards, U.S. Nuclear Regulatory must be at least as conservative as limits
copy documents for a fee. Persons who obtained by following the methods of
Commission, Washington, DC 20555.
do not have access to the NRC’s analysis and the margins of safety of
Telephone: (301) 415–1396; Fax
Agencywide Documents Access and Appendix G of Section XI of the ASME
number: (301) 415–8555: E-mail:
Management System (ADAMS) or who Code [Boiler and Pressure Vessel
Irw@nrc.gov.
encounter problems in accessing the Code].’’ Part 50 of Title 10 of the Code
Introduction documents located in ADAMS, should of Federal Regulations, Appendix G,
jlentini on PROD1PC65 with NOTICES

Notice is hereby given that by petition contact the NRC PDR Reference staff by also specifies that the editions and
dated April 4, 2006, Mr. Terry J. Lodge telephone at 1–800–397–4209 or (301) addenda of the ASME Code, Section XI,
(Counsel for Petitioners) has requested 415–4737, or by e-mail to pdr@nrc.gov. which are incorporated by reference in
that the Nuclear Regulatory Commission Dated at Rockville, Maryland this 27th day 10 CFR 50.55a, apply to the
(NRC) take action with regard to the of June, 2006. requirements in 10 CFR Part 50,

VerDate Aug<31>2005 17:01 Jul 05, 2006 Jkt 208001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\06JYN1.SGM 06JYN1

Anda mungkin juga menyukai