Commissioning Service Department

Commissioning Standard Test Formats


Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

1. Secondary injection test:

Bay No. :

(core1)

INJECTED CURRENTS:
R-N: 1A

phase

MeasPoint
Loction

Y-N: 0.5A
Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

B-N:0.25A
Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

R
Y
B
N
R
Y
B
N
R
Y
B
N

2. Secondary injection test:

(core2)

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

Bay No. :
Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

INJECTED CURRENTS:
R-N: 1A

phase

MeasPoint
Loction

Y-N: 0.5A
Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

B-N: 0.25A
Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

R
Y
B
N
R
Y
B
N
R
Y
B
N

3. Secondary injection test:

(core3)

Bay No. :

INJECTED CURRENTS:
R-N: 1A

Y-N: 0.5A

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

B-N:0.25A

Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

phase

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N

1. Secondary injection test:

(core4)

Bay No. :

INJECTED CURRENTS:
R-N: 1A

Y-N: 0.5A

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

B-N:0.25A

Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

phase

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N

phase
R
Y
B

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

N
R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N

1. Secondary injection test:

Bay No. :

(core5)

INJECTED CURRENTS:
R-N: 1A

phase

MeasPoint
Loction

Y-N: 0.5A
Terminal
No

Meascurrent

MeasPoint
Loction

Terminal
No

B-N:0.25A
Meascurrent

MeasPoint
Loction

Terminal
No

Meascurrent

MeasLoop
Burden

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N

2. Check short and isolated link for proper function :


Core No

Confirm test for short and isolated check

Core 1
Core 2
Core 3
Core 4
Core 5
Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

Witnessed by
Engr. AHMED AL FAIZY

Commissioning Service Department


Commissioning Standard Test Formats
Description : GIS CT Secondary Injection Test

Record No. :

Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00

Sheet : Page of 5
Substation No : S/S-8840, West Buraydah

Note :
1. The current injected is the secondary rated current of CT.
2. The above test is to be done with the links closed.

3. Test Equipment Used :


Item

Test Equipment

Serial Number

1
2

Freja 300
Leakage Clamp Meter

1302697
3532028

Tested by
Name:
Signature:
Date:

Engr. GUNABALAN

Calibration
Date
1-10-2014

Calibration
Due Date
1-10-2015

Witnessed by
Engr. AHMED AL FAIZY