Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
Bay No. :
(core1)
INJECTED CURRENTS:
R-N: 1A
phase
MeasPoint
Loction
Y-N: 0.5A
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
B-N:0.25A
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
R
Y
B
N
R
Y
B
N
R
Y
B
N
(core2)
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
Bay No. :
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
INJECTED CURRENTS:
R-N: 1A
phase
MeasPoint
Loction
Y-N: 0.5A
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
B-N: 0.25A
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
R
Y
B
N
R
Y
B
N
R
Y
B
N
(core3)
Bay No. :
INJECTED CURRENTS:
R-N: 1A
Y-N: 0.5A
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
B-N:0.25A
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
phase
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N
(core4)
Bay No. :
INJECTED CURRENTS:
R-N: 1A
Y-N: 0.5A
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
B-N:0.25A
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
phase
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N
phase
R
Y
B
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
N
R
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N
Bay No. :
(core5)
INJECTED CURRENTS:
R-N: 1A
phase
MeasPoint
Loction
Y-N: 0.5A
Terminal
No
Meascurrent
MeasPoint
Loction
Terminal
No
B-N:0.25A
Meascurrent
MeasPoint
Loction
Terminal
No
Meascurrent
MeasLoop
Burden
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
Y
B
N
R
Y
B
N
R
Y
B
N
R
Y
B
N
Core 1
Core 2
Core 3
Core 4
Core 5
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
Witnessed by
Engr. AHMED AL FAIZY
Record No. :
Equip. No.
Drawing ref.:
Contractor : AECC Contractno.:111311511/00
Sheet : Page of 5
Substation No : S/S-8840, West Buraydah
Note :
1. The current injected is the secondary rated current of CT.
2. The above test is to be done with the links closed.
Test Equipment
Serial Number
1
2
Freja 300
Leakage Clamp Meter
1302697
3532028
Tested by
Name:
Signature:
Date:
Engr. GUNABALAN
Calibration
Date
1-10-2014
Calibration
Due Date
1-10-2015
Witnessed by
Engr. AHMED AL FAIZY