Anda di halaman 1dari 2

31206 Federal Register / Vol. 71, No.

105 / Thursday, June 1, 2006 / Notices

Proposed changes in water operations operations would cause reductions to SUMMARY: Pursuant to the National
are designed to avoid the likelihood of the Carlsbad Project water supply. Environmental Policy Act (NEPA) and
jeopardy to the Pecos bluntnose shiner the California Environmental Quality
Proposed Federal Action
(Notropis simus pecosensis) (shiner) and Act (CEQA), the Bureau of Reclamation
its designated critical habitat. The water Reclamation has designated the (Reclamation) and the California
acquisition program is proposed to Taiban Constant Alternative as the Department of Parks and Recreation
conserve the Carlsbad Project water preferred alternative. Under this (DPR) propose to prepare a joint EIS/EIR
supply. alternative, Reclamation proposes to for the Auburn State Recreation Area
operate the Carlsbad Project to (1) divert General Plan/Interim Resource
Background to storage when flows at the Taiban gage Management Plan (GP/IRMP).
In 1987, the U.S. Fish and Wildlife are greater than 35 cfs and (2) deliver Reclamation is the Lead Federal Agency
Service (Service) listed the shiner, a from storage Carlsbad Project water as for NEPA and DPR is the Lead State
small minnow, as a threatened species contracted for irrigation, consistent with Agency for CEQA. A public scoping
and designated two noncontiguous river applicable federal and state laws and meeting to solicit public input on the
reaches, totaling approximately 101 contracts. This alternative best meets alternatives, concerns, and issues to be
miles of the Pecos River, as critical the purpose of and need for the addressed in the GP/IRMP and EIS/EIR
habitat (52 FR 5295–5303). According to proposed action. has been scheduled.
the Service, the shiner has undergone The Carlsbad Project Water DATES: A public scoping meeting will be
significant population declines and Operations and Water Supply held on June 15, 2006 from 6 to 9 p.m.
range contraction in the last 65 years Conservation Draft Environmental in Auburn, California.
and is now restricted to about 194 miles Impact Statement (DEIS) was issued in Requests for reasonable
from Fort Sumner State Park to Brantley September 2005, and a Notice of accommodation should be received no
Reservoir. Availability of the DEIS was published later than 1 week before the meeting
in the Federal Register on September 1, (see SUPPLEMENTARY INFORMATION).
Purpose and Need for Action 2005. The 60-day review and comment Send written comments on the scope
The purpose of Reclamation’s period for the DEIS ended on October of the EIS/EIR by the close of business
proposed federal action is to protect the 31, 2005. During the comment period, on July 31, 2006.
Pecos bluntnose shiner and to conserve four public meetings were held and 25
ADDRESSES: The public scoping meeting
the Carlsbad Project water supply. The formal comments were received. All
will be held at the Canyon View Center,
proposed action is consistent with comments were carefully reviewed and
Foothills Room, 471 Maidu Drive,
Reclamation’s Endangered Species Act considered in preparing the FEIS.
Auburn, CA 95603.
(ESA) compliance activities and will Where appropriate, revisions were made
Written comments on the scope of the
help conserve the Carlsbad Project water to the document in response to specific
EIS/EIR should be sent to: Mr. Jim
supply for authorized purposes. comments. The comments and
Micheaels, Park Planner, DPR, 7806
Through the chosen federal action responses, together with the final
Folsom Auburn Road, Folsom, CA
alternative, Reclamation would ensure environmental impact statement, will be
95630.
that any discretionary action it considered in determining whether or
authorizes, funds, or carries out is not not to implement the proposed action. FOR FURTHER INFORMATION CONTACT:
likely to jeopardize the continued No decision will be made on the Laura Caballero, Environmental
existence of a listed species or result in proposed federal action until 30 days Specialist, Reclamation, 7794 Folsom
the destruction or adverse modification after release of the FEIS. After the 30- Dam Road, Folsom, CA 95630; (916)
of critical habitat. Reclamation would day waiting period, Reclamation will 989–7172; or Jim Micheaels, Park
continue to participate in interagency complete a Record of Decision. The Planner, DPR, 7806 Folsom-Auburn
actions to protect federally-listed Record of Decision will state the action Road, Folsom, CA 95630, (916) 988–
species and designated critical habitats, that will be implemented and discuss 0513.
within its legal and discretionary all factors leading to that decision. SUPPLEMENTARY INFORMATION: An
authority. Dated: May 23, 2006. Auburn State Recreation Area (SRA)
Reclamation is proposing changes in Dave Sabo, General Plan (GP) was completed in
operations of the Carlsbad Project that Assistant Regional Director—UC Region, 1978 (a combined General Plan with
benefit the shiner under its existing Bureau of Reclamation. Folsom Lake SRA). This plan presumed
authorities and are consistent with its [FR Doc. E6–8352 Filed 5–31–06; 8:45 am] construction of Auburn Dam; however,
ESA section 7(a) (1) obligation to BILLING CODE 4310–MN–P Auburn Dam construction did not occur
conserve and protect listed species. within the time frame identified by the
Within the exercise of its discretionary 1978 GP. Because construction of
authority, Reclamation must avoid DEPARTMENT OF THE INTERIOR Auburn Dam was not completed within
jeopardizing the continued existence of the time frames anticipated, an IRMP
the shiner or destroying or adversely Bureau of Reclamation was prepared in 1992 to address current
modifying designated critical habitat resources, conditions, and uses. Auburn
(ESA section 7(a)(2)). Auburn State Recreation Area General Dam continues to be a federally
Reclamation has also elected to keep Plan/Interim Resource Management recognized project.
the Carlsbad Project water supply Plan The current 1992 IRMP lacks
whole. Conserving the Carlsbad Project AGENCY: Bureau of Reclamation, sufficient detail and analysis of the
water supply means that Reclamation Interior. natural resources and existing visitor
wwhite on PROD1PC61 with NOTICES

would deliver water to the project uses for contemporary management of


ACTION: Notice of intent to prepare an
sufficient to meet all project purposes, Auburn SRA as a river-based resource.
Environmental Impact Statement/
when available. Without an An updated and more comprehensive
Environmental Impact Report (EIS/EIR)
accompanying program to acquire and Canyon/River based IRMP is needed
and notice of public scoping meeting.
provide water, changes to historical until Congress determines the future of

VerDate Aug<31>2005 19:10 May 31, 2006 Jkt 208001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\01JNN1.SGM 01JNN1
Federal Register / Vol. 71, No. 105 / Thursday, June 1, 2006 / Notices 31207

Auburn Dam and the related land and organizations or businesses, available Investigations, U.S. International Trade
water resources. for public disclosure in their entirety. Commission, 500 E Street, SW.,
Washington, DC 20436. Hearing-
Key GP/IRMP Issues for Analysis Frank Michny,
impaired persons can obtain
Regional Environmental Officer, Mid-Pacific
(1) Public health and safety; Region.
information on this matter by contacting
the Commission’s TDD terminal on 202–
(2) Resource protection and [FR Doc. E6–8460 Filed 5–31–06; 8:45 am]
205–1810. Persons with mobility
conservation; BILLING CODE 4310–MN–P
impairments who will need special
(3) Conflicts between user groups; assistance in gaining access to the
(4) Wild land fire and fuel management Commission should contact the Office
INTERNATIONAL TRADE of the Secretary at 202–205–2000.
plans; COMMISSION General information concerning the
(5) Encroachment and trespassing; [Investigation Nos. 701–TA–364 and 731– Commission may also be obtained by
(6) Emerging and growing recreation TA–711 and 713–716 (Second Review)] accessing its Internet server (http://
uses. www.usitc.gov). The public record for
Oil Country Tubular Goods From these reviews may be viewed on the
Comments presented at the public Argentina, Italy, Japan, Korea, and Commission’s electronic docket (EDIS)
meeting will be used to further analyze Mexico at http://edis.usitc.gov.
environmental issues that should be AGENCY: United States International SUPPLEMENTARY INFORMATION:
addressed in the GP/IRMP and Trade Commission. Background. On August 10, 1995, the
accompanying EIS/EIR. Individual ACTION: Institution of five-year reviews Department of Commerce (‘‘Commerce’’)
scoping meetings can be arranged with concerning the countervailing duty issued a countervailing duty order on
responsible/cooperating agencies and order on oil country tubular goods imports of OCTG from Italy (60 FR
with special interest groups upon (‘‘OCTG’’) from Italy and the 40822). On August 11, 1995, Commerce
request. antidumping duty orders on OCTG from issued antidumping duty orders on
Persons needing reasonable Argentina, Italy, Japan, Korea, and imports of OCTG from Argentina, Italy,
accommodations in order to attend and Mexico. Japan, Korea, and Mexico (60 FR 41055).
participate in the public meeting should Following five-year reviews by
SUMMARY: The Commission hereby gives Commerce and the Commission,
contact Ms. Laura Caballero, at 916–
notice that it has instituted reviews effective July 25, 2001, Commerce
989–7172, as soon as possible. In order
pursuant to section 751(c) of the Tariff issued a continuation of the
to allow sufficient time to process Act of 1930 (19 U.S.C. 1675(c)) (the Act)
requests, please call no later than 1 countervailing duty order on imports of
to determine whether revocation of the OCTG from Italy and the antidumping
week before the meeting. Information countervailing duty order on OCTG duty orders on imports of OCTG from
regarding this proposed action is from Italy and the antidumping duty Argentina, Italy, Japan, Korea, and
available in alternative formats upon orders on OCTG from Argentina, Italy, Mexico (66 FR 38630). The Commission
request. Japan, Korea, and Mexico would be is now conducting second reviews to
Letters describing the proposed action likely to lead to continuation or determine whether revocation of the
and soliciting comments will be sent to recurrence of material injury. Pursuant orders would be likely to lead to
the appropriate Federal, State, and local to section 751(c)(2) of the Act, interested continuation or recurrence of material
agencies, and to private organizations parties are requested to respond to this injury to the domestic industry within
and citizens who have previously notice by submitting the information a reasonably foreseeable time. It will
expressed or are known to have interest specified below to the Commission; 1 to assess the adequacy of interested party
in this proposal to ensure that the full be assured of consideration, the responses to this notice of institution to
range of issues related to this proposed deadline for responses is July 21, 2006. determine whether to conduct full
action are addressed and all significant Comments on the adequacy of responses reviews or expedited reviews. The
issues identified, comments and may be filed with the Commission by Commission’s determinations in any
suggestions are invited from all August 14, 2006. For further expedited reviews will be based on the
interested parties and stakeholders. information concerning the conduct of facts available, which may include
these reviews and rules of general information provided in response to this
Our practice is to make comments, application, consult the Commission’s notice.
including names and home addresses of Rules of Practice and Procedure, part Definitions. The following definitions
respondents, available for public 201, subparts A through E (19 CFR part apply to these reviews:
review. Individual respondents may 201), and part 207, subparts A, D, E, and (1) Subject Merchandise is the class or
request that we withhold their home F (19 CFR part 207). kind of merchandise that is within the
addresses from public disclosure, which DATES: Effective Date: June 1, 2006. scope of the five-year reviews, as
we will honor to the extent allowable by FOR FURTHER INFORMATION CONTACT: defined by Commerce.
law. There also may be circumstances in Mary Messer (202–205–3193), Office of (2) The Subject Countries in these
which we would withhold a reviews are Argentina, Italy, Japan,
respondent’s identity from public 1 No response to this request for information is Korea, and Mexico.
disclosure, as allowable by law. If you required if a currently valid Office of Management (3) The Domestic Like Product is the
wish us to withhold your name and/or and Budget (OMB) number is not displayed; the
OMB number is 3117–0016/USITC No. 06–5–153,
domestically produced product or
address, you must state this expiration date June 30, 2008. Public reporting products which are like, or in the
wwhite on PROD1PC61 with NOTICES

prominently at the beginning of your burden for the request is estimated to average 10 absence of like, most similar in
comment. We will make all submissions hours per response. Please send comments characteristics and uses with, the
from organizations or businesses, and regarding the accuracy of this burden estimate to
the Office of Investigations, U.S. International Trade
Subject Merchandise. In its original
from individuals identifying themselves Commission, 500 E Street, SW., Washington, DC determinations and its full five-year
as representatives or officials of 20436. review determinations, the Commission

VerDate Aug<31>2005 19:10 May 31, 2006 Jkt 208001 PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 E:\FR\FM\01JNN1.SGM 01JNN1

Anda mungkin juga menyukai