VerDate Aug<31>2005 15:45 May 03, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\04MYN1.SGM 04MYN1
26364 Federal Register / Vol. 71, No. 86 / Thursday, May 4, 2006 / Notices
the telephone number for the and are required, in general, of all prior to the date of this ICR. The
Enforcement and Compliance Docket sources subject to National Emission increase in O&M costs is due to
and Information Center Docket is (202) Standards for Hazardous Air Pollutants installation and maintenance of
566–1752. (NESHAP). Any owner or operator equipment used to verify compliance
Use EPA’s electronic docket and subject to the provisions of this part with the rule requirements.
comment system at http:// shall maintain a file of these Dated: April 27, 2006.
www.regulations.gov, to submit or view measurements, and retain the file for at
Oscar Morales,
public comments, access the index least five years following the date of
listing of the contents of the docket, and Director, Collection Strategies Division.
such measurements, maintenance
to access those documents in the docket reports, and records. All reports are sent [FR Doc. E6–6770 Filed 5–3–06; 8:45 am]
that are available electronically. Once in to the delegated state or local authority. BILLING CODE 6560–50–P
the system, select ‘‘docket search,’’ then In the event that there is no such
key in the docket ID number identified delegated authority, the reports are sent
above. Please note that EPA’s policy is directly to the EPA regional office. ENVIRONMENTAL PROTECTION
that public comments, whether An agency may not conduct or AGENCY
submitted electronically or in paper, sponsor, and a person is not required to [Petitions IV–2002–4 and –6 FRL–8166–7]
will be made available for public respond to, a collection of information
viewing at http://www.regulations.gov unless it displays a currently valid OMB Clean Air Act Operating Permit
as EPA receives them and without control number. The OMB control Program; Petitions for Objection to
change, unless the comment contains numbers for EPA’s regulations in 40 State Operating Permit Amendments
copyrighted material, Confidential CFR are listed in 40 CFR part 9 and are for Georgia Power Company—Bowen
Business Information (CBI), or other identified on the form and/or Steam-Electric Generating Plant,
information whose public disclosure is instrument, if applicable. Cartersville (Bartow County), GA;
restricted by statute. For further Burden Statement: The annual public Branch Steam-Electric Generating
information about the electronic docket, reporting and recordkeeping burden for Plant, Milledgeville (Putnam County),
go to http://www.regulations.gov. this collection of information is GA; Hammond Steam-Electric
Title: NESHAP for the Surface Coating estimated to average 97 hours per Generating Plant, Coosa (Floyd
of Large Household and Commercial response. Burden means the total time, County), GA; McDonough/Atkinson
Appliances (Renewal). effort, or financial resources expended Steam-Electric Generating Plant,
ICR Numbers: EPA ICR Number by persons to generate, maintain, retain, Smyrna (Cobb County), GA; Scherer
1954.03, OMB Control Number 2060– or disclose or provide information to or Steam-Electric Generating Plant,
0457. for a Federal agency. This includes the Juliette (Monroe County), GA; Wansley
ICR Status: This ICR is scheduled to time needed to review instructions; Steam-Electric Generating Plant,
expire on May 31, 2006. Under OMB develop, acquire, install, and utilize Roopville (Heard County), GA; and
regulations, the Agency may continue to technology and systems for the purposes Yates Steam-Electric Generating Plant,
conduct or sponsor the collection of of collecting, validating, and verifying Newnan (Coweta County), GA
information while this submission is information, processing and
pending at OMB. An Agency may not maintaining information, and disclosing AGENCY: Environmental Protection
conduct or sponsor, and a person is not and providing information; adjust the Agency (EPA).
required to respond to, a collection of existing ways to comply with any ACTION: Notice of final order denying
information, unless it displays a previously applicable instructions and petitions to object to state operating
currently valid OMB control number. requirements which have subsequently permit amendments.
The OMB control numbers for EPA’s changed; train personnel to be able to
regulations in title 40 of the CFR, after SUMMARY: Pursuant to Clean Air Act
respond to a collection of information;
appearing in the Federal Register when Section 505(b)(2) and 40 CFR 70.8(d),
search data sources; complete and
approved, are listed in 40 CFR part 9, the EPA Administrator signed an order,
review the collection of information;
are displayed either by publication in dated March 15, 2006, denying two (2)
and transmit or otherwise disclose the
the Federal Register or by other petitions to object to state operating
information.
appropriate means, such as on the Respondents/Affected Entities: permit amendments issued by the
related collection instrument or form, if Owners or operators of large appliance Georgia Environmental Protection
applicable. The display of OMB control surface coating operations. Division (EPD) to Georgia Power
numbers in certain EPA regulations is Estimated Number of Respondents: Company for the following facilities:
consolidated in 40 CFR part 9. 90. Bowen Steam-Electric Generating Plant
Abstract: Respondents are owners or Frequency of Response: Initial, located in Cartersville, Bartow County,
operators of large appliance surface Semiannually, On Occasion. Georgia; Branch Steam-Electric
coating operations. Owners or operators Estimated Total Annual Hour Burden: Generating Plant located in
of the affected facilities described must 28,845. Milledgeville, Putnam County, Georgia;
make initial reports when a source Estimated Total Annual Cost: Hammond Steam-Electric Generating
becomes subject to the standard, $2,326,984, which includes $64,000 Plant located in Coosa, Floyd County,
conduct and report on a performance annualized capital/startup costs, Georgia; McDonough/Atkinson Steam-
test, demonstrate and report on $108,000 annualized O&M costs, and Electric Generating Plant located in
continuous monitor performance, and $2,154,984 annualized labor costs. Smyrna, Cobb County, Georgia; Scherer
maintain records of the occurrence and Changes in the Estimates: There is an Steam-Electric Generating Plant located
mstockstill on PROD1PC68 with NOTICES
duration of any startup, shutdown, or increase of 21,108 hours in the total in Juliette, Monroe County, Georgia;
malfunction in the operation of an estimated burden currently identified in Wansley Steam-Electric Generating
affected facility. Semiannual reports of the OMB Inventory of Approved ICR Plant located in Roopville, Heard
excess emissions are required. These Burdens. The increase in burden reflects County, Georgia; and Yates Steam-
notifications, reports, and records are the need for facilities to be in Electric Generating Plant located in
essential in determining compliance; compliance with the rule requirements Newnan, Coweta County, Georgia. This
VerDate Aug<31>2005 15:45 May 03, 2006 Jkt 208001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\04MYN1.SGM 04MYN1