The Pressure Vessel Certification article provides you with information about the ASME
stamp holder process for manufacturers and third party inspection companies.
Global TPI Services
We Provide Pre-Shipment Inspection, Vendor Inspection and Commodity Inspection Services. Click Here for More Information

Do you what the pressure vessel certification process is? Do you know how pressure
vessel manufacturers can be ASME stamp holders?
How Third Party inspection companies can be certified by ASME and be Authorized
Inspection Agencies? What is a U stamped pressure vessel?
This article describes all the required information regarding pressure vessel certification
and regulation.
Pressure Vessel Manufacturer Certification:
You may know pressure vessel manufacturer certification is the same as authorization for
an ASME Stamp.
The pressure vessel manufacturers can implement an ASME Quality Control System and
then apply for the ASME Stamp.
This means that if a manufacturer is accredited by the ASME organization for pressure
vessels per ASME Code Section VIII Div. 1, they can stamp the letter U in the pressure
vessel nameplate.
See the following Fig. for Pressure Vessel Certification (The Stamp Item)

This is the process for ASME stamp accreditation:


1. Obtain Application Forms from ASME
2. Sign a Service Agreement with an Authorized Inspection Agency (AIA)
Authorized inspection agencies are third party inspection companies, which have
accredited by an ASME organization and their inspectors are certified by the National
Board Inspection Code (NBIC).
These inspectors are named authorized inspectors and hold commission cards issued by
NBIC organization.
Summary: AIAs are accredited by ASME, but these inspectors are certified by NBIC.
3. Submit Application Forms to ASME and transfer Fees
4. Purchase ASME Code Books
5. Describe a QC-System according to the ASME code quality control manual and have
the procedures prepared by the manufacturer.
6. Prepare a Demonstration Item
A representative demo pressure vessel needs to be constructed and all drawings,
calculations, part lists, purchase orders, material test reports, fabrications, inspections,
tests and reporting shall be based on ASME code section VIII requirements.
7. Qualify Procedures and Personnel

Quality control procedures and personnel also need to be approved by the manufacturer.
8. Pre-Joint Review by the Supervisor of AIA
It takes almost 4 months to fulfill the above requirements. Then an audit needs to be
conducted by a supervisor authorized inspector, which is designated by an authorized
inspection agency, which is under contract with the manufacture.
We Provide TPI Inspection Services in Most Industrial Areas Around the Globe. Click Here for More
Information

This auditor would report non-conformities found in the audit process, and then the
manufacturer would have some time to correct them.
9. Joint Review (Audit) with ASME Designee, Inspector and Supervisor
Finally, the audit would be conducted by an ASME designated person, supervisor
authorized Inspector and authorized inspector.
That is the reason this audit is named a joint review.
10. Issuance of Certificate and Stamp by ASME
If the result of Audit was satisfactory, the certificate would be issued by ASME and then
manufacture would be authorized to stamp name plate with U Stamp.
What are the Different Pressure Vessel Stamps?
Manufacturing of Pressure Vessels (Shop and /or Field): U
Alternative Rules Section VIII, Division 2(Shop and /or Field):U2
Manufacturing of High Pressure Vessels (Shop and /or Field):U3
What is the Quality Control System that Needs to be Implemented in Pressure
Vessel Certification?
For U the stamp, the quality control system needs to be based on ASME section VIII Div.
1 Appendix 10.
What is the Benefit for a Pressure Vessel Purchaser to Order a Stamped Pressure
Vessel?

When a purchaser orders stamped pressure vessel from a stamp holder manufacturer, it is
not necessary to hire a third party inspector.
Because this pressure vessel would automatically be inspected by an AI(Authorized
Inspector) and its data report would be signed by him.
Another benefit can be the purchaser's assurance of the quality of the pressure vessel,
because of the manufacturers responsibility to the ASME organization.
At the same time, ordering a stamped pressure vessel would be more expensive than a
non-stamped pressure vessel.
- See more at: http://www.inspection-for-industry.com/pressure-vesselcertification.html#sthash.TuBTgUSj.dpuf

Anda mungkin juga menyukai