Technical specification C.1.9
14.09.09
Page 1 of 5
services
Technical specification C.1.9
14.09.09
1. Introduction
For all buried pipeline construction projects performed, the final documentation contains
the originals of all documents listed below.
Details about required format of documents including the number of required copies, as
well as the timing for handover of this final documentation will be specified within the
contract for the specific scope of work.
As specified in the framework agreement, Petrom reserves the right to retain parts of the
remuneration and of the performance guarantee for the construction services of a
specific project until all final documentation has been delivered and approved completely
as requested in contents and requested quality.
2. Specification of required documents for final documentation
Document key
code
Deutsch
English
Romn
Enddokumentation
Documentation
Documentaie
Prf- ,
Schlubescheinigung
Final certificate
(obtained by
independent 3rd
body or authorities)
HQA 31
Technische Beschreibung
Technical
description - project
Descrierea tehnic
(proiectul)
HEA 03
Konformittserklrung
Declaration of
conformity( with
Romanian laws
given by
construction
company)
Declaraia de
conformitate (conform
legilor din Romnia
dat de compania
constructoare)
HQA 10
R&I Schemata
PID Drawings
(process &
Page 2 of 5
services
Technical specification C.1.9
14.09.09
Document key
code
Deutsch
English
Romn
Enddokumentation
Documentation
Documentaie
instrumentation
diagram)
instrumentaia de
msura i control)
Isometrien mit
zugehrigen Materialstck
und Schweinahtlisten
Isometric drawing
and the belonging
bill of materials and
welding seam list
Schema izometrica i
lista cu materialele ce
trebuie folosite i
lista sudurilor de
efectuat
HFB 02
Verrohrungsplne
Schema de aezare a
conductelor (pentru
facilitile conductelor,
cum ar fi claviaturiile)
HFB 04
Maps of the
(1) general survey
(2) pipeline routing,
(3) details (for eg.
Under-/ overcross,
tie-in),
(4) process
automation/ -control,
(5) typicals
Hri cu
supravegherea
general, traseul
conductei, detalii ( de
ex. Subtraversri,
supratraversri,
cuplri) automatizarea/
- controlul procesului,
specificaii
Rohrwanddickenberechnu
ngen
Calculation of the
pipe wall thickness
Calculul grosimii
peretelui conductei
HQA 26
Isolationsbescheinigung
Insulation certificate
Certificatul izolatiei
HQA 39
Umstempelbescheinigung
Material
identification
certificates
Certificatele de
indentificare a
materialelor
HQA 37
Certificatele probei de
presiune
HQA 20
Rohrbuch
Manualul conductei
HQA 33
(1) bersichts-,
(2) Trassen-,
(3) Detail-,
(4) Regel- und
(5) Typenplne
Pipebook
(1) HLA 02
(2) HLD 02
(3) HLD 03
(4) HLD 04
(5) HPD 05
Page 3 of 5
services
Technical specification C.1.9
14.09.09
Document key
code
Deutsch
English
Romn
Enddokumentation
Documentation
Documentaie
Schweiereinsatzlisten
List of Welders
(approved and
working on this site)
HQA 45
Schweianweisungen
WPS welding
procedure
specification
(approved)
WPS specificaia
procedurii de sudur
(aprobat)
HQA 22
Schweierzeurgnisse
Welder certificates
Certificatele sudorilor
HQA 23
Protokolle ber
zerstrungsfreie
Werkstoffprfungen
Buletinele controalelor
nedestructive al
materialului (ex.
controlul radiografic)
HQA 16
Prfbericht ber
zerstrende Prfungen an
Testnhten
Report of
destructive tests for
welding joints
Buletinele controalelor
distructive pentru
legturile de sudur
HQA 24
Abnahmeprfzeugnisse
Acceptance
certificates
Certificate de recepie
HQA 02
The document key code specified shall be used for communication, table of contents
and filing of the above documents required for final documentation. They are
standardized within Petrom and OMV group and can be used to denominate the
documents only by their standard number.
3. Contact person for documentation questions
In case of questions about the contents or details of creating the final documentation,
the QA/QC-department of Petrom E&P will be able to give further information.
Please contact your Petrom site supervisor for further details and contact information.
Page 4 of 5
services
Technical specification C.1.9
14.09.09
4. Change list
Rev
Date
Type of change
Revised by
Checked by
Released by
Page 5 of 5