Anda di halaman 1dari 2

Federal Register / Vol. 70, No.

248 / Wednesday, December 28, 2005 / Notices 76805

interventions in lieu of paper, using the Entergy Corporation (Entergy) and Snohomish County, Washington
FERC Online links at http:// Entergy Louisiana Holdings, Inc. (Snohomish) pursuant to sections 205,
www.ferc.gov. To facilitate electronic (Entergy Louisiana Holdings) 206, 306, and 309 of the Federal Power
service, persons with Internet access (collectively the Applicants) pursuant to Act, and 18 CFR 385.206(e), tendered
who will eFile a document and/or be section 204 of the Federal Power Act to for filing an amendment to supplement
listed as a contact for an intervenor issue and sell short-term debt securities. its Petition originally filed on August 5,
must create and validate an Applicants are also requesting pursuant 2005. Snohomish further request
eRegistration account using the to section 203(a) of the Federal Power privileged treatment for this filing.
eRegistration link. Select the eFiling Act a blanket authorization to acquire Comment Date: 5 p.m. eastern time on
link to log on and submit the securities issued by associate companies January 17, 2006.
intervention or protests. having a value in excess of $10 million, 6. The Goldman Sachs Group, Inc.
Persons unable to file electronically subject to various conditions.
should submit an original and 14 copies Comment Date: 5 p.m. eastern time on [Docket No. EL06–27–000]
of the intervention or protest to the January 6, 2006. Take notice that on December 12,
Federal Energy Regulatory Commission, 2005, The Goldman Sachs Group, Inc.
2. Duke Energy Trading and Marketing, (GS Group) tendered for filing a Petition
888 First St. NE., Washington, DC
L.L.C. for Declaratory Order stating that
20426.
The filings in the above proceedings [Docket No. EC06–43–000] section 203 of the Federal Power Act, as
are accessible in the Commission’s Take notice that on December 16, amended, will not apply to certain
eLibrary system by clicking on the 2005, Duke Energy Trading and acquisitions of utility and holding
appropriate link in the above list. They Marketing L.L.C. (DETM) and BP Energy company securities. GS Group further
are also available for review in the Company, (BP) filed with the states that accompanying this filing is
Commission’s Public Reference Room in Commission an application pursuant to an Application for Blanket
Washington, DC. There is an section 203 of the Federal Power Act for Authorization to Acquire Utility and/or
eSubscription link on the Web site that authorization of the transfer by DETM of Holding Company Securities, pursuant
enables subscribers to receive e-mail a wholesale power transaction to BP. to, amended section 203(a)(2) of the
notification when a document is added DETM and BP have requested privileged Federal Power Act, but that the
to a subscribed dockets(s). For treatment for commercially sensitive Commission need not act on this latter
assistance with any FERC Online information contained in the Application if the Commission grants
service, please e-mail application. the declaratory relief.
FERCOnlineSupport@ferc.gov. or call Comment Date: 5 p.m. eastern time on Comment Date: 5 p.m. eastern time on
(866) 208–3676 (toll free). For TTY, call January 6, 2006. January 11, 2006.
(202) 502–8659. Standard Paragraph
3. Duke Energy Marketing America,
Magalie R. Salas, LLC and J. Aron & Company Any person desiring to intervene or to
Secretary. protest this filing must file in
[Docket No. EC06–44–000]
[FR Doc. E5–7924 Filed 12–27–05; 8:45 am] accordance with Rules 211 and 214 of
Take notice that, on December 16, the Commission’s Rules of Practice and
BILLING CODE 6717–01–P
2005, Duke Energy Marketing America, Procedure (18 CFR 385.211, 385.214).
LLC (DEMA) and J. Aron & Company (J. Protests will be considered by the
DEPARTMENT OF ENERGY Aron) filed with the Commission an Commission in determining the
application pursuant to section 203 of appropriate action to be taken, but will
Federal Energy Regulatory the Federal Power Act for authorization not serve to make protestants parties to
Commission of the transfer by DEMA of a wholesale the proceeding. Any person wishing to
power transaction to J. Aron. Pursuant become a party must file a notice of
[Docket Nos. EC06–42–000, et al.] to 18 CFR 388.112, DEMA and J. Aron intervention or motion to intervene, as
have requested privileged treatment for appropriate. Such notices, motions, or
Entergy Services, Inc. et al.; Electric
commercially sensitive information protests must be filed on or before the
Rate and Corporate Filings
contained in the application. comment date. On or before the
December 20, 2005. Comment Date: 5 p.m. eastern time on comment date, it is not necessary to
The following filings have been made January 6, 2006. serve motions to intervene or protests
with the Commission. The filings are 4. City of Pasadena, California on persons other than the Applicant.
listed in ascending order within each The Commission encourages
docket classification. [Docket No. EL05–18–001] electronic submission of protests and
Take notice that on October 11, 2005, interventions in lieu of paper using the
1. Entergy Services, Inc. et al.
the City of Pasadena, California ‘‘eFiling’’ link at http://www.ferc.gov.
[Docket Nos. EC06–42–000; ES06–20–000] confirmation that it has paid to the Persons unable to file electronically
Take notice that on December 16, California Independent System Operator should submit an original and 14 copies
2005, Entergy Services, Inc. (Entergy Corporation refunds required under the of the protest or intervention to the
Services) filed with the Federal Energy Commission’s July 26, 2005 ‘‘Order Federal Energy Regulatory Commission,
Regulatory Commission (Commission) Approving Uncontested Settlement’’. 888 First Street, NE., Washington, DC
an application on behalf of its associate Comment Date: 5 p.m. eastern time on 20426.
companies, Entergy Arkansas, Inc. December 28, 2005. This filing is accessible on-line at
(Entergy Arkansas), Entergy Gulf States, 5. Snohomish County, Washington v. http://www.ferc.gov, using the
wwhite on PROD1PC65 with NOTICES

Inc. (Entergy Gulf States), Entergy Enron Power Marketing, Inc. ‘‘eLibrary’’ link and is available for
Louisiana, LLC (as successor to Entergy review in the Commission’s Public
Louisiana, Inc.), Entergy Mississippi, [Docket No. EL05–139–001] Reference Room in Washington, DC.
Inc. (Entergy Mississippi), System Take notice that on December 7, 2005, There is an ‘‘eSubscription’’ link on the
Energy Resources, Inc. (System Energy), Public Utility District No. 1 of Web site that enables subscribers to

VerDate Aug<31>2005 17:37 Dec 27, 2005 Jkt 208001 PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1
76806 Federal Register / Vol. 70, No. 248 / Wednesday, December 28, 2005 / Notices

receive e-mail notification when a construction and operation of the • Label one copy of your comments
document is added to a subscribed following facilities in Cameron, for the attention of Gas Branch 2, PJ–
docket(s). For assistance with any FERC Calcasieu, Beauregard, Allen, Jefferson 11.2; and
Online service, please e-mail Davis, and Acadia Parishes, Louisiana: • Mail your comments so that they
FERCOnlineSupport@ferc.gov, or call • A ship unloading slip with two will be received in Washington, DC on
(866) 208–3676 (toll free). For TTY, call protected berths, each equipped with or before February 21, 2006.
(202) 502–8659. three liquid unloading arms and one After these comments have been
vapor return arm; reviewed, any significant new issues are
Magalie R. Salas, • Four LNG storage tanks, each with
Secretary.
investigated, and modifications are
a usable volume of 1,006,000 barrels made to the draft EIS, a final EIS will
[FR Doc. E5–7933 Filed 12–27–05; 8:45 am] (160,000 cubic meters (m3)); be published and distributed by the
BILLING CODE 6717–01–P • Twenty-one high pressure LNG staff. The final EIS will contain the
sendout pumps, each with a capacity of staff’s responses to timely comments
1,686 gallons per minute (384 m3 per received on the draft EIS.
DEPARTMENT OF ENERGY hour); Comments will be considered by the
• Twenty-one high pressure
Federal Energy Regulatory Commission but will not serve to make
submerged combustion vaporizers, each
Commission the commentor a party to the
with a capacity of 183 million cubic feet
proceeding. Any person seeking to
[Docket Nos. CP05–360–000, CP05–357– per day;
become a party to the proceeding must
000, CP05–358–000, and CP05–359–000] • Three boil-off gas compressors;
• Ancillary utilities, buildings, and file a motion to intervene pursuant to
Creole Trail LNG, L.P. and Cheniere service facilities at the LNG terminal; Rule 214 of the Commission’s Rules of
Creole Trail Pipeline; Notice of • 116.8 miles of dual 42-inch- Practice and Procedures (18 CFR
Availability of the Draft Environmental diameter natural gas pipeline; 385.214). Anyone may intervene in this
Impact Statement for the Creole Trail • 6.8 miles of 20-inch-diameter lateral proceeding based on this draft EIS. You
LNG Terminal and Pipeline Project line natural gas pipeline; must file your request to intervene as
• 18 meter and regulation facilities; specified above.1 You do not need
December 16, 2005. and intervenor status to have your
The staff of the Federal Energy • Associated pipeline facilities comments considered.
Regulatory Commission (FERC or including pig launcher and receiver Recent hurricane activities have
Commission) has prepared this draft facilities, two mainline valves (MLV) on affected infrastructure in the project
Environmental Impact Statement (EIS) the 20-inch-diameter pipeline, and eight area. In addition, the Commission has
for the construction and operation of the MLVs along each of the individual received relatively few comments on the
liquefied natural gas (LNG) import pipelines in the dual pipeline system. Creole Trail Project to date, and
terminal and natural gas pipeline comments that were received have been
facilities, referred to as the Creole Trail Comment Procedures and Public addressed in this draft EIS. For these
LNG Terminal and Pipeline Project Meetings reasons, the staff does not plan to hold
(Creole Trail Project) as proposed by Any person wishing to comment on public comment meetings on the draft
Creole Trail LNG, L.P. and Cheniere the draft EIS may do so. To expedite the EIS for the Creole Trail Project. If it is
Creole Trail Pipeline (collectively FERC’s receipt and consideration of determined at a later date that public
referred to as Creole Trail) in the above- your comments, electronic submission meetings are necessary, a separate
referenced dockets. of comments is strongly encouraged. See notice will be issued and posted on the
The draft EIS was prepared to satisfy Title 18 CFR 385.2001(a)(1)(iii) and the Commission’s calendar located at
the requirements of the National instructions on the FERC’s Internet Web http://www.ferc.gov/EventCalendar/
Environmental Policy Act (NEPA). The site (http://www.ferc.gov) under the EventsList.aspx along with other related
staff concludes that approval of the eFiling link and the link to the User’s information.
Creole Trail Project, with appropriate Guide. Before you can submit The draft EIS has been placed in the
mitigating measures as recommended, comments, you will need to create a free public files of the FERC and is available
would have limited adverse account by clicking on ‘‘Sign-up’’ under for distribution and public inspection
environmental impact. The draft EIS ‘‘New User.’’ You will be asked to select at: Federal Energy Regulatory
evaluates alternatives to the proposal, the type of submission you are making. Commission, Public Reference and Files
including system alternatives, This type of submission is considered a Maintenance Branch, 888 First Street
alternative sites for the LNG import ‘‘Comment on Filing.’’ Comments NE., Room 2A, Washington, DC 20426.
terminal, and pipeline alternatives. The submitted electronically must be (202) 502–8371.
draft EIS also contains our Essential submitted by February 21, 2006. A limited number of copies of the
Fish Habitat Analysis. If you wish to mail comments on the draft EIS are available from the Public
The purpose of the Creole Trail draft EIS, please mail your comments so Reference and Files Maintenance
Project is to provide the facilities that they will be received in Branch identified above. In addition,
necessary to meet growing demand for Washington, DC on or before February copies of the draft EIS have been mailed
natural gas in the United States by 21, 2006 and carefully follow these to Federal, state, and local agencies;
providing access to a reliable and stable instructions: elected officials; public interest groups;
supply of natural gas from diverse areas • Send an original and two copies of individuals and affected landowners
of the world and to allow natural gas your comments to: Magalie R. Salas, who requested a copy of the draft EIS;
delivery to the Gulf of Mexico coast, Secretary, Federal Energy Regulatory libraries; newspapers; and parties to
wwhite on PROD1PC65 with NOTICES

midwest, northeast, and Atlantic Commission, 888 First Street, NE., these proceedings.
markets using existing interstate and Room 1A, Washington, DC 20426.
intrastate natural gas pipeline systems. • Reference Docket No. CP05–357– 1 Interventions may also be filed electronically via
The draft EIS addresses the potential 000 et al. on the original and both the Internet in lieu of paper. See the previous
environmental effects of the copies; discussion on filing comments electronically.

VerDate Aug<31>2005 17:37 Dec 27, 2005 Jkt 208001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\28DEN1.SGM 28DEN1

Anda mungkin juga menyukai