Anda di halaman 1dari 5

Ishfaq Babar

(Electrical/Telecommunication Engineer)

Father name: M. Zulfiqar Sajid


D.O.B: July 11, 1986

H#459 2 AII Town Ship


Lahore Pakistan.

+92-0331-4360249 ,0324-4206283
+92-042-35117660

Ishfaq_ciit@yahoo.com

Passport#AP3025381
OBJECTIVE
To develop expertise in the field of telecommunication by contributing positively towards accomplishing
the goals of the organization utilizing my talents and capabilities while acquiring experience in a
challenging and dynamic environment.

EDUCATION
MCS From Virtual University (Last Semester)
BSc Electrical (Telecommunication)
Engineering
COMSATS Institute of Information Technology, Lahore
Intermediate (Pre-Engineering)

2014
2011
2005

Govt. College Of Science Wahdat Road Lahore


Secondary School Certificate (SSC)

2003

The Trust School For Boys Thoker Niaz Baig Lahore

EXPERIENCE (INTERNSHIP)

Netkom Technologies

th

15

th

Feb, 2011 15 MAY

To lead and supervise the team in Telenor Power Swap Project.

Trouble shooting of alarms and power rectifier modules.

Swapping of batteries and installing power and symmetry cables and


troubleshooting of alarm.

HUAWEI Technologies
Nov, 2011-2 June

th

th

2012

Working on BTS3012 and BTS3900 troubleshooting and Alarms Removal to


maintain network
Working on DTRU, DDPU, GTMU, DMCM,GRFU ,EMU and trouble shooting of
VSWR, DBUS, and
Diversity, E1 Remote and Local related alarms in BTS3012 and BTS3900

Working on SITE MAINTAINENCE TOOL of HUAWEI for viewing and


troubleshooting and configuring BTS sites and their issues.
Working on BTS3900 swap project (3G Upgradeable) as quality Insurance
surveys after activity.
Working on 900 and 600 series RTN of Huawei

Have knowledge of 900 and 600 RTN structure their Control cards and Service
Cards, dish to IDU
Including ODU, IF cable, IF cards, Power cards, Service cards
(E1, Ethernet).
Troubleshoot the problems.
ALARMS monitoring.
Trainings:
1.

2.

3.
4.

CMPAK Zong RTN 950 Training


Basic Structure
Configuration of RTN 950 using iManager U2000
Understanding XPIC Links in SNCP Rings and their configuration
Cross-connections configuration
Alarms monitoring
Trouble shooting
PTCL RTN 620 Training
Basic Structure & knowledge about 600 series RTN
Configuration using iManager U2000
Troubleshooting the problems
UFONE Onsite Training
ZONG Onsite Training

Grentech Pakistan (Pvt) Ltd


June 2012 Sep 2012
3G Site commissioning
Making swap Template and up gradation Expansion Template
E1 Expansion patching on site end
BSC end Patching according to route plan
E1 expansion in Ring Wateen Node
Giving media to sites towards BSC
Media clearance
o RF Drive test with TEMS Investigation Tools for 3G sites.
o Including 2g to 3g and 3g to 3g hand over and site to site hand over
testing
o Analyze and troubleshoot of 3G KPI parameters like RRC setup rate, CS
AMR setup rate, CS 64 Setup rate, PS setup rate and HSDPA Setup rate.
o Optimizing 3G sites to reduce congestion and drops, improving the IRAT
Handover, Soft Handover, LU, Paging, CSSR, RRC Connection & RAB
Establishment Success rate for all AMR, Video, Packet & HSPA calls.
o Optimize worst cells, to improve KPI's such as TCH assignment success
rate, SDCCH assignment success rate, TCH drop call rate.

Pakistan Telecommunication Company Limited (PTCL),


Lahore
(1st jan 2013 1st May 2013)
Customer Support Executive PTCL/CDAS, Lahore
Broadband Department
Responsible for providing online System and Network support to the Broadband users.
Technical Support for both LAN and Wireless Networks.
Error detection, Modem configuration, trouble shooting, IP assignment, SNR and Attenuation
measurement, status checking and customer guidance using software Configuration and
settings of ZTE, Huawei, TP Link, Shiro, Tenda, Kasada, Segemcom Modems

ACADEMIC PROJECTS

Interfacing a temperature Sensor LM35 using Analog to Digital converter


ADC0802 to Atmel Micro controller, and Logging (Reading/Writing)
temperature data into Rom (Simulation + Hardware).
Design of Dipole Antenna in HFSS and with its Azimuth and Elevation
FM Transmitter
Client Server communication, Program in C .

TECHNICAL CERTIFICATES AND TRAININGS


HDCA, Red Hat ENTERPRISE Linux and CCNA TRAINING CERTIFICATION
with lab work; from CORVIT SYSTEMS
ZTE training Site Engineer Certification (SDR,QA/QC,HSSE,LMT)
Industrial automation using Siemens Step 5 and Step 7 PLCs
Step 7 LOGO! Series programming using LOGO! COMFORT software
Siemens S7-300 PLC programming using Ladder Logic by Simatic Manager and Interfacing all
Digital and Analog I/O cards using Sensors Inputs
Configuring and designing Siemens HMI with Siemens PLCs and Basic Level Of SCADA
implementation

TECHNICAL SKILLS
Programming Skills: C/C++,C# .Net, SQL, HTML, Object Oriented Programming,
Assembly, JavaScript, LINUX Programming
Simulation Tools: MATLAB, Microwave Office 2009, HFSS,
PROTEUS, NEC WIN++, PACKET TRACER, and
Discovery. Embedded system PIC 8051 microcontroller, Basic
concepts of Image Processing
Operating Systems: Windows 98/2000/XP, VISTA, MS-DOS, LINUX/UNIX.
Documentation Environment: Microsoft Ofice Tools (2003 & 2007)

MAJOR SUBJECTS

Broadband Technologies
Antenna & Radio Wave Propagation
Data Comm. & Computer Networks
Microwave Engineering
Microwave & Satellite Communication Systems
Telecommunication System Engineering
Electric Machine Analysis (AC & DC)
Control System Engineering
Microprocessor Systems & Interfacing
Electromagnetic Theory
Analog & Digital Communication systems
Digital Signal Processing

PROFESSIONAL AND PERSONAL SKILLS

Able to handle group of people and track their assigned tasks


Friendly, hardworking and flexible
Team Player, Ability to lead
Able to work under pressure and with time constraints

Efective communication and interpersonal skills

REFERENCE
Available on Demand
In the light of above data, give me a chance to prove myself.

Anda mungkin juga menyukai