Introducing BS 8544:2013

Guide for life cycle costing of


maintenance during the in use
phases of buildings
Communication Event: North Folgate, London
Held on the 15th October 2013

Purchase a copy of BS 8544:2013 from


http://shop.bsigroup.com/

Copyright 2012 BSI. All rights reserved.

Fantastic Cross Industry Collaboration - 6Ps who helped to produce BS 8544

1 Procurement policy
Government Procurement Unit

2 Professions / Institutions
Building Cost Information Service
Chartered Inst. of Building Services Eng.
Chartered Institution of Building
Construction Confederation
Construction Products Association
Institution of Structural Engineers
Royal Institute of Chartered Surveyors

3 Procurers / Asset Operators & Owners


Aviation sector clients
Defence Estates
Ministry of Justice
University College London
Many other clients (ongoing)

Copyright 2012 BSI. All rights reserved.

4 Providers
Building &Engineering Services Assoc.
(formerly the HVCA)
PFI/PPP Consortia
Maintenance contractors

5 Practitioners
Asset operators / estate managers
Facilities managers
Independent experts
Major QS companies

6 Pan Industry bodies


Academia and learning centres
BSI and the Durability committee
Building Research Establishment (BRE)
Constructing Excellence

Overview of BS 8544:2013 Guide for LCC of Maintenance during in use phases

What does it contain?


1. Objectives of the standard
2. Integrating LCC of maintain and renewal plans
3. Step by step guidance and instructions
4. Maintenance costs to include/exclude & express
5. Interoperability of LCC data with BIM models
6. Informing the decision making process
7. Informative worked examples (annex A-F)
8. LCC risks and mitigation guidance (E)

2nd Supplement to ISO 15686 part 5 life cycle costing


Copyright 2012 BSI. All rights reserved.

The objectives of BS 8544 are to provide a standardised methodology for:

Copyright 2012 BSI. All rights reserved.

Life cycle costing of maintenance works that fully


integrates the cyclical process of creating and
implementing two plans maintain & renewal

Capturing the appropriate asset information


for specific LCC outcomes (e.g. PPM programmes)

Evaluating and prioritising the maintenance work


when budgeting and undertaking funding scenarios

Implementing LCC programmes of works + unlock


interoperable data for BIM and future LCC planning
4

Process and applications step by step guidance and instructions (section 4, 5 & 6)

Copyright 2012 BSI. All rights reserved.

Process and applications step by step guidance and instructions (section 4, 5 & 6)

Copyright 2012 BSI. All rights reserved.

Process and applications step by step guidance and instructions (section 4, 5 & 6)

Copyright 2012 BSI. All rights reserved.

Process and applications step by step guidance and instructions (section 4, 5 & 6)

Copyright 2012 BSI. All rights reserved.

Process and applications step by step guidance and instructions (section 4, 5 & 6)

Copyright 2012 BSI. All rights reserved.

Maintenance costs for inclusion and exclusion and how to express them (section 7)

BS 8544 covers:

Maintenance

Renewal

Maintain

C
ROME-

Construction
Renewals
(if in scope)
Maintain
End of life

BS 8544 Section 7 categorises what costs to use:


Table 1 Key constituents of maintenance costs + wider LCC/WLC
Table 2 - Cost breakdown structure for the LCC of maintenance works
(which are aligned with the RICS new rules of measurement)
Copyright 2012 BSI. All rights reserved.

10

NRM 1 and NRM 3 aligned to B&ES (formerly HVCA) SFG20 Maintenance Task Schedules & Codes:
NRM 1 - Levels 1 to 3
Maintain Code
1 SUBSTRUCTURE
2 SUPERSTRUCTURE
3 INTERNAL FINISHES
4 FITTINGS, FURNISHINGS AND EQUIPMENT
5 SERVICES
5.1 SANITARY INSTALLATIONS
5.1.1 Sanitary Appliances
5.1.1.M.1
5.1.1.M.6
5.1.1.M.7
5.1.1.M.8
5.1.1.M.9
5.1.1.M.2
5.1.1.M.3
5.1.1.M.4
5.1.1.M.5
5.2 SERVICES EQUIPMENT
5.3 DISPOSAL INSTALLATIONS
5.4 WATER INSTALLATIONS
5.5 HEAT SOURCE
5.5.1 Heat Source
5.5.1.M.1
5.5.1.M.2

NRM 3- Maintain Descriptor

Maintain UoM

SFG20 Code

SFG20 Task Description

L
i
f
e
Sanitary appliances (WC & cisterns, basins, sinks, bidets, baths)
Drinking fountain
Tap and outlet fitting
Water saving device
Control and sensors
Showers
Shower units
Shower booster pump
Shower valve

nr
nr
nr
nr
nr
nr
nr
nr
nr

48-05
49-09
61-02
48-08
50-09
51-01
51-01
51-02
61-05

Sanitary appliances
Drinking fountains
Taps
Water saving devices
Controls
Showers
Showers
Pumps
Valves

Boiler biomass
Boiler - gas/oil

nr
nr
nr
nr
nr
nr
nr
nr

05-48
05-03
05-04
05-10
05-11
05-12
05-14
05-23

Biomass boiler
Atmospheric gas burner - free standing
Atmospheric gas burner - condensing
Blown gas burner - condensing
Blown gas burner - modular
Forced draught gas burner
Gas fired boiler - MTHW up to 108*C
Gas fired boiler - LTHW up to 95*C

Copyright 2012 BSI. All rights reserved.

e
x
p
e
c
t
a
n
c
y
y
r
s

11

Interoperability of LCC maintenance with BIM data structures - (Section 8)

Efficiency and the BIM agenda: Guidance is provided on


how the maintain and life cycle renewal data should be structured
and classified to be interoperable with the BIM data exchange
formats fundamental to the UKs Governments Construction
Strategy (i.e
.efficiency
based on robust whole life costs.)
Copyright
2012 BSI. Alldrive
rights reserved.

Annex A gives an informative example


12

Informing the decision making process - (Section 10)

How to:
set and defend the maintenance budgets
mitigate risks and liabilities (see annex E)
drive maintenance prioritisation
target investment in asset renewals
Plus:
inform wider estate planning studies
input into environmental / sustainability
feedback into future construction projects

Copyright 2012 BSI. All rights reserved.

13

Informative examples of methods, rules and techniques (Annex B)


How to:
customise maintenance - using a ACR method:

RED compliant standards (must do)

AMBER business critical (fit for function)

GREEN - non critical (i.e. not over maintain)


rules for asset condition grading (AB / CDEFX)
trigger renewal interventions using PARL method
Plus informative examples of LCC assets performance:
function condition indexing (FCI) simply defined
Renewal works costs (by year) v asset rebuild value
Copyright 2012 BSI. All rights reserved.

14

Annex B Figure B.3 Formula for FCI rating how assets are performing
Total cost identified actions (condition/ PARL)
3m
-------------------------------------------------------------- = e.g. ---------- = 15% FCI (Poor)
Capital reinstatement value (CRV)
20m
Excellent

Good

Fair

Poor
Refurbish or De-invest trigger?

0%

1%

2%

Copyright 2012 BSI. All rights reserved.

13% 14%

24% 25%

50%

100%

15

Illustrative examples of Function Condition Indexing (Annex B Table 1)


Table 1 Example of FCI: summary output by size and function type over a 5 and 10 year period
Function

Administration
Farms
Industries
Inmate
accommodation
Perimeter
security
Prisoner activities
Prisoner services
Staff facilities
Works
Site wide total
Sinking fund
model (PDV)
Key: FCI rating

CRV

Year
4 up to and
including 5
%

6 up to and
including 10
%

Up to end of
year 5
%

Total
Up to end of
year 10
%

2 up to and
including 3
%

2 821 650
5 970 000
13 415 700
30 399 000

0
0
0
5

9
0
2
3

11
1
1
5

9
6
6
8

20
2
3
13

29
8
9
21

533 050

18

26

5
9
1
2

0
0
0
0
2
1 665 778

7
9
12
2
6
4 312 608

5
4
14
2
4
2 866 584

11
10
27
31
9
6 926 522

12
13
26
5
12
8 844 970

23
22
53
35
22
15 771 492

859
195
016
761

1 up to 2

600
450
750
200

73 126 950
(total)
Over 25% =
14% to 24% =
3% to 13% =
Less than 2% =
Less than 1% =

Refurbish or de-investment trigger


Poor
Fair
Good
Excellent

NOTE 1

Assumptions: FCI is based on condition assessment. An identified backlog of works to bring up to and maintain the sinking fund model at condition B status. The sinking
fund model is the per annum investment funding required to cover renewal works over a defined period of time.

NOTE 2

Year 1 total includes major project works.

Copyright 2012 BSI. All rights reserved.

16

Illustrative example of FCI Benchmarking (Annex B Figure B.4)

Copyright 2012 BSI. All rights reserved.

17

BS 8544 - Linkages to other industry maintenance standards

Copyright 2012 BSI. All rights reserved.

18

Linkage to the SFG 20 Maintenance Standards

Bruce Kirton CEO


B&ES Publications:
(formerly HVCA)

Copyright 2012 BSI. All rights reserved.

19

Copyright 2012 BSI. All rights reserved.

SFG20 Launch

20

20

The New SFG20 Products


Core SFG20 Library: Over 400 industry standard maintenance specifications covering
heating, cooling and ventilation, installation plant, and electrical services, complete with
regular technical updates. The core library task schedules have been extended to include
biomass boilers, solar panels, chilled beams and more (plus ability to add non-core
tasks).
Customizer Compliance: Users can create a bespoke building maintenance task sets
and print bespoke booklets of applicable standards. Includes regular updates and
explicitly links the relevant statutory/ legal regulations - the must-dos to keep out of jail.
Customizer Service Model: Prioritise maintenance regimes using simple criticality
ratings. Pre-defined functional models (such as schools, offices, libraries, prisons and car
parks and more to follow........) allow users to simply refine to their specific requirements.

Copyright 2012 BSI. All rights reserved.

21

Core SFG20
Task Library

Customizer Compliance

Customizer Service Model

Functional
Model(s)
o

Prisons

Offices

Schools

Stations

Others to come

FUNCTION UNIT
TYPES / MODELS

TECHNICAL
UPDATES

NON CORE TASKS


&
PLANNED INSPECTION

SFG20 Products
Copyright 2012 BSI. All rights reserved.

MANAGEMENT TASKS
&
SPECIALIST TASKS

22

Copyright 2012 BSI. All rights reserved.

23

Copyright 2012 BSI. All rights reserved.

24

Copyright 2012 BSI. All rights reserved.

25

25

USER tailors for specific usages i.e.


Tendering and/or CAFM input:
Agree format and grouping of the book of standards
Task schedules
Grouping of tasks
Future developments ( available in 2014)
Functional models
Asset profiles
Compliance links
Task timings of core tasks
Skilling and resource modelling

Copyright 2012 BSI. All rights reserved.

26

SFG 20 current and future developments


1

Function types

Non-core tasks

Cost modeller (RYG/)

Mothball regimes (SFG30)

Energy focused maintenance

Benchmarking

BIM
Copyright 2012 BSI. All rights reserved.

DRAFT
COPY

27

SFG20 - Industry Benefits


Customer/End users/Operators;
Assurance of legal and mandatory compliance - Red /Pink tasks + why links
Not under or over maintaining their assets - Business Focused Maintenance Regime
Ability to model level to suit business use of space e.g. Fit for function standards
Financial;
Baseline to set/defend budgets (set minimum legal and fit for function service model)
Efficiency savings v old PPM regime (criticality based use of the resource and costs)
Fairer procurement (comparable basis for tendering) and demo of value for money

Copyright 2012 BSI. All rights reserved.

28

Links to CIBSE Guide M (rev 2014)

Jo Harris BSRIA
Chairman of CIBSE Maintenance Task Group

Copyright 2012 BSI. All rights reserved.

29

BS 8544 : Linkage to CIBSE Guide M

Linkage of BS 8544 to CIBSE Guide M:


1.

Brief overview of the contents CIBSE Guide M

2.

Indicative economic life expectancy and factors

3.

Factors to consider when using reference lives

Revision to Guide M (planned for Q1 2014)

Copyright 2012 BSI. All rights reserved.

30

CIBSE Maintenance Task Group: Brief Overview of CIBSE Guide M Contents


Source for those operating and maintaining buildings
Reference for: manufacturers, designers, installers
Contents of Guide M:
Good design for maintainability
Maintenance strategies and techniques
Handover procedures
Risk management
Audits
Legislation and health & Safety
Competence

Controls
Commissioning
Information
Owner and operating costs
Condition surveys
Training
Energy

Indicative economic life expectancy factors


Copyright 2012 BSI. All rights reserved.

31

Indicative Economic Life Expectancy Aligned to Construct / Renewal and Maintain


Equipment - Maintainable Components
SANITARY INSTALLATIONS (SI)
Sanitary Appliances (SA)
Sanitary Appliances:
1.

Indicative Life
/ Years
Reference
Service Life
(RSL)
As below

vitreous china/ /fireclay/ uPVC


cast iron and stainless steel

20
40

RICS
NRM 3 code
5.1

B&ES
SFG20 Library
Schedule code

5.1.1
Note SFG20 48-05 covers items 1 to 5, as well as
disposal installations in item 5.3.1.2

Note - SFG20 48.05 covers sanitary, waste water,


plumbing and drains

WC pans and cisterns, WC suites, slop


hoppers, urinals and cisterns.
-

Remarks

5.1.1.1

5.1.1.1.1

48-05 (part)

Depends on the material type

2.

Sinks

40/20

Depends on the material type (as item1)

5.1.1.1.2

48-05 (part)

3.

Wash basins, hand rinse basins, wash fountains

40/20

Depends on the material type (as item1)

5.1.1.1.3

48-05 (part)

4.

Bidets

40/20

Depends on the material type (as item1)

5.1.1.1.4

48-05 (part)

5.

Baths (including bath panels and trims)

40/20

Depends on the material type (as item1)

5.1.1.1.5

48-05 (part)

6.

Shower trays

40/20

Depends on the material type (as item1)

5.1.1.1.6

51-01

Shower unit - including shower head & hose

Self contained / electric

5.1.1.1.7

51-01

Shower booster pumps

As sup list

See supplementary pumps list -(at end of tables)

5.1.1.1.8

51-02

As sup list

Including thermostatic mixing valves


See supplementary valves list - (at end of tables)

5.1.1.1.9

61-04 and
61-05

Item 5.13.5.1.1 for ornamental fountains

5.1.1.1.10

48-09

Operational tap temperature testing regime and a


risk assessment, for flushing of low use systems
See supplementary taps list (after 5.13)
Include meters Also included in 5.4.2.1.3
Auto flush and hand tap sensor devices
NB Occuupancy lighting sensors, in 5.8,3.1.11.2
Note Jacuzzi baths taken in specialist
installations (5.13.3.1.1.4.3 Hydrotherapy pools)

5.1.1.1.11

32-01 & 02, 61-02, 03 and


04

5.1.1.1.12
5.1.1.1.13

48-08
48-05 (part) & 48-08 (part)

Shower valves

10. Drinking fountains

10
As sup list

11. Taps and waste fittings


12
13

Water saving devices


Automated controls and sensors

NLC
10

Taken
elsewhere
Copyright 2012 BSI. All rights reserved.

32

Indicative Economic Life Expectancy Tables Chapter 13


Life tables - aligned with NRM and cross referenced to B&ES SFG20 tasks

Economic life Least expensive method of performing its function


Factors to be consider when using reference service life data:

External environment
Internal environment
Technology changes - obsolescence
Design and specifications
Unoccupied buildings
Maintenance
Hours of operation
Installation
Adequate space
Copyright 2012 BSI. All rights reserved.

33

Implementing the Standards

Geoff Prudence

C.Eng FCIBSE MBIFM

Chairman of CIBSE Facilities Management

Copyright 2012 BSI. All rights reserved.

34

A Junction in Our Industry


CIBSE Guide M

Plan, Do, Check, Act - Build, Maintain, Renew


BIM

BS 8544

Added
Value

NRM 3
Plan of Work

Effective
Maintenance
Strategies
and Delivery

SFG 20
1192-3

What an Opportunity !
Copyright 2012 BSI. All rights reserved.

35

Developing

Innocence

Competence

Knowledge Based

A paradigm shift in attitude from


cost focus to business focus

Repair as good
as before

Reactive fix it
when it breaks

Excellence
Optimized planning
& decision making

Integrated organization,
systems & processes

Proactive predictive
maintenance
Struggling with
management systems

Systems are a valuable tool


- information is an asset

Proactive, preventive
maintenance

Learning

Applying

Maintenance is an expense
Copyright 2012 BSI. All rights reserved.

Outsourced contracts to
deliver value & cost savings

Embedding

Sound knowledge of
cost, performance &
risk relationships

Integrating

Performance & Reliability

Maintenance & Renewal Spend

Whats Happening in the UK Maintenance Market ?

Optimizing

Maintenance is an investment
36

The UCL Journey


1.

World Class Institution

2. Over 200 Buildings


3. Diverse Estate; Age, Type, Criticality, Use, Location 1826 to now.
4

Previous incremental growth linked now with future aspirations.

Copyright 2012 BSI. All rights reserved.

37

The UCL Journey- First Step

Clear Organisational Priorities

Defined Maintenance Strategy

Existing Gap Analysis - Risk Based

Infrastructure Review

Engineering Leadership Skills


Copyright 2012 BSI. All rights reserved.

38

The UCL Journey- Embed Standards

Strategic Maintenance Programme - Framework Defined

Categorisation of Buildings (A, B, C)

Defined Priorities (Aligned to Best Practice)

Utilising Approach from Guide M, SFG 20 BS 8544, NRM 3


to develop one standardised portfolio wide approach
that is accurate, dynamic and to enable effective decision
making to meet the needs of UCL moving forward.

Copyright 2012 BSI. All rights reserved.

39

Effective life cycle asset management:

Prioritisation techniques:
Estate Importance:
Building Rating - ABCD
Function Priority - 1234

Asset Performance
Function AB-CDEFX

condition/remaining life
energy efficiency
space utilisation
resilience/capacity
other form of assessments

Standardised Portfolio Asset Data Structure


(CAFM Systems and BIM FM Models)
Copyright 2012 BSI. All rights reserved.

40

Customised Maintenance Standards


(Fit for Function Business Focused)

Must do to be complaint with statutory/legal obligations

Must do to be complaint with Organisational policies

Should do based on business criticality and risks

Could do/not to avoid under or over maintaining assets


(Return on investment/Energy Efficiency etc)

Copyright 2012 BSI. All rights reserved.

41

Understand how well critical


asset are performing v needs?

ENERGY &
ENVIRONMENTAL
PERFORMANCE

SAFETY,
SECURITY &
COMPLIANCE
BUILDING OPERATIONAL
RISK MANAGEMENT
SPACE
UTILISATION

RISK BANDING
P1 Statutory /Legal
P2 Service Critical
P3 Other Criteria

FUNCTIONAL
SUITABILITY
(CAPACITY & RESILIENCE)

FINANCIAL
(LCC PLANS)

PHYSICAL CONDITION & REMAINING LIFE


Copyright 2012 BSI. All rights reserved.

14/10/2013

BS 8544 Communications Event at One Drummond Gate, Victoria, London on 18 th September 2013

42

A PRACTICAL VIEWPOINT

How BS 8544 can help realise sustainable efficiencies


Current State

Future State

Agreed
Strategy
Financial
Management
v
Baseline
Defendable
Benchmarks

15- 20%
Savings
Service Level
Model
RED
AMBER
GREEN
Fit For
Function
&
Business
Focused

Copyright 2012 BSI. All rights reserved.

Direct
Labour
Savings
Right
Skills
V
SLM
regime

Supply Chain
Leverage

Innovation
&
Best Buy

Process
Optimisation
Integrated
Approach
To
Total
LCC

Technology
Application

Cost of
Change

Performance
Management
Control
of asset
Intelligence
(How well
Assets
Performing)
43

Tangible Benefits of BS 8544


BS 8544 Is a key piece of the Jigsaw for the Facilities Management & Maintenance Industry:

1. Consistent basis for maintenance cost planning and comparison.


2. Target precisely what is being spent and where and when
3. Inform option appraisals (e.g. during budgeting and funding scenarios)
4. Basis for improved procurement and avoiding adversarial contracting
5. Provides interoperable data for effective CAFM solutions and the BIM
6. Pivotal to realising bankable efficiencies and Continual Improvements
Copyright 2012 BSI. All rights reserved.

44

The UCL Journey- Drivers for Change

Why Wouldnt You?

Copyright 2012 BSI. All rights reserved.

45

PANEL DISCUSSION / Q&A SESSION

Questions from the audience?


Q1

BS 8544 and the new UK Industry Standards for Maintenance

Q2 -

Standardising Asset information will positively impact on CAFM & BIM agenda

Q3

What will be the impact on the current maintenance of retained estates /assets

Thank You
Copyright 2012 BSI. All rights reserved.

46

Introducing BS 8544:2013
Guide for life cycle costing of
maintenance during the in use
phases of buildings
Purchase a copy of BS 8544:2013
from the bsi bookshop:
http://shop.bsigroup.com/

Copyright 2012 BSI. All rights reserved.