1 Procurement policy
Government Procurement Unit
2 Professions / Institutions
Building Cost Information Service
Chartered Inst. of Building Services Eng.
Chartered Institution of Building
Construction Confederation
Construction Products Association
Institution of Structural Engineers
Royal Institute of Chartered Surveyors
4 Providers
Building &Engineering Services Assoc.
(formerly the HVCA)
PFI/PPP Consortia
Maintenance contractors
5 Practitioners
Asset operators / estate managers
Facilities managers
Independent experts
Major QS companies
Process and applications step by step guidance and instructions (section 4, 5 & 6)
Process and applications step by step guidance and instructions (section 4, 5 & 6)
Process and applications step by step guidance and instructions (section 4, 5 & 6)
Process and applications step by step guidance and instructions (section 4, 5 & 6)
Process and applications step by step guidance and instructions (section 4, 5 & 6)
Maintenance costs for inclusion and exclusion and how to express them (section 7)
BS 8544 covers:
Maintenance
Renewal
Maintain
C
ROME-
Construction
Renewals
(if in scope)
Maintain
End of life
10
NRM 1 and NRM 3 aligned to B&ES (formerly HVCA) SFG20 Maintenance Task Schedules & Codes:
NRM 1 - Levels 1 to 3
Maintain Code
1 SUBSTRUCTURE
2 SUPERSTRUCTURE
3 INTERNAL FINISHES
4 FITTINGS, FURNISHINGS AND EQUIPMENT
5 SERVICES
5.1 SANITARY INSTALLATIONS
5.1.1 Sanitary Appliances
5.1.1.M.1
5.1.1.M.6
5.1.1.M.7
5.1.1.M.8
5.1.1.M.9
5.1.1.M.2
5.1.1.M.3
5.1.1.M.4
5.1.1.M.5
5.2 SERVICES EQUIPMENT
5.3 DISPOSAL INSTALLATIONS
5.4 WATER INSTALLATIONS
5.5 HEAT SOURCE
5.5.1 Heat Source
5.5.1.M.1
5.5.1.M.2
Maintain UoM
SFG20 Code
L
i
f
e
Sanitary appliances (WC & cisterns, basins, sinks, bidets, baths)
Drinking fountain
Tap and outlet fitting
Water saving device
Control and sensors
Showers
Shower units
Shower booster pump
Shower valve
nr
nr
nr
nr
nr
nr
nr
nr
nr
48-05
49-09
61-02
48-08
50-09
51-01
51-01
51-02
61-05
Sanitary appliances
Drinking fountains
Taps
Water saving devices
Controls
Showers
Showers
Pumps
Valves
Boiler biomass
Boiler - gas/oil
nr
nr
nr
nr
nr
nr
nr
nr
05-48
05-03
05-04
05-10
05-11
05-12
05-14
05-23
Biomass boiler
Atmospheric gas burner - free standing
Atmospheric gas burner - condensing
Blown gas burner - condensing
Blown gas burner - modular
Forced draught gas burner
Gas fired boiler - MTHW up to 108*C
Gas fired boiler - LTHW up to 95*C
e
x
p
e
c
t
a
n
c
y
y
r
s
11
How to:
set and defend the maintenance budgets
mitigate risks and liabilities (see annex E)
drive maintenance prioritisation
target investment in asset renewals
Plus:
inform wider estate planning studies
input into environmental / sustainability
feedback into future construction projects
13
14
Annex B Figure B.3 Formula for FCI rating how assets are performing
Total cost identified actions (condition/ PARL)
3m
-------------------------------------------------------------- = e.g. ---------- = 15% FCI (Poor)
Capital reinstatement value (CRV)
20m
Excellent
Good
Fair
Poor
Refurbish or De-invest trigger?
0%
1%
2%
13% 14%
24% 25%
50%
100%
15
Administration
Farms
Industries
Inmate
accommodation
Perimeter
security
Prisoner activities
Prisoner services
Staff facilities
Works
Site wide total
Sinking fund
model (PDV)
Key: FCI rating
CRV
Year
4 up to and
including 5
%
6 up to and
including 10
%
Up to end of
year 5
%
Total
Up to end of
year 10
%
2 up to and
including 3
%
2 821 650
5 970 000
13 415 700
30 399 000
0
0
0
5
9
0
2
3
11
1
1
5
9
6
6
8
20
2
3
13
29
8
9
21
533 050
18
26
5
9
1
2
0
0
0
0
2
1 665 778
7
9
12
2
6
4 312 608
5
4
14
2
4
2 866 584
11
10
27
31
9
6 926 522
12
13
26
5
12
8 844 970
23
22
53
35
22
15 771 492
859
195
016
761
1 up to 2
600
450
750
200
73 126 950
(total)
Over 25% =
14% to 24% =
3% to 13% =
Less than 2% =
Less than 1% =
NOTE 1
Assumptions: FCI is based on condition assessment. An identified backlog of works to bring up to and maintain the sinking fund model at condition B status. The sinking
fund model is the per annum investment funding required to cover renewal works over a defined period of time.
NOTE 2
16
17
18
19
SFG20 Launch
20
20
21
Core SFG20
Task Library
Customizer Compliance
Functional
Model(s)
o
Prisons
Offices
Schools
Stations
Others to come
FUNCTION UNIT
TYPES / MODELS
TECHNICAL
UPDATES
SFG20 Products
Copyright 2012 BSI. All rights reserved.
MANAGEMENT TASKS
&
SPECIALIST TASKS
22
23
24
25
25
26
Function types
Non-core tasks
Benchmarking
BIM
Copyright 2012 BSI. All rights reserved.
DRAFT
COPY
27
28
Jo Harris BSRIA
Chairman of CIBSE Maintenance Task Group
29
2.
3.
30
Controls
Commissioning
Information
Owner and operating costs
Condition surveys
Training
Energy
31
Indicative Life
/ Years
Reference
Service Life
(RSL)
As below
20
40
RICS
NRM 3 code
5.1
B&ES
SFG20 Library
Schedule code
5.1.1
Note SFG20 48-05 covers items 1 to 5, as well as
disposal installations in item 5.3.1.2
Remarks
5.1.1.1
5.1.1.1.1
48-05 (part)
2.
Sinks
40/20
5.1.1.1.2
48-05 (part)
3.
40/20
5.1.1.1.3
48-05 (part)
4.
Bidets
40/20
5.1.1.1.4
48-05 (part)
5.
40/20
5.1.1.1.5
48-05 (part)
6.
Shower trays
40/20
5.1.1.1.6
51-01
5.1.1.1.7
51-01
As sup list
5.1.1.1.8
51-02
As sup list
5.1.1.1.9
61-04 and
61-05
5.1.1.1.10
48-09
5.1.1.1.11
5.1.1.1.12
5.1.1.1.13
48-08
48-05 (part) & 48-08 (part)
Shower valves
10
As sup list
NLC
10
Taken
elsewhere
Copyright 2012 BSI. All rights reserved.
32
External environment
Internal environment
Technology changes - obsolescence
Design and specifications
Unoccupied buildings
Maintenance
Hours of operation
Installation
Adequate space
Copyright 2012 BSI. All rights reserved.
33
Geoff Prudence
34
BS 8544
Added
Value
NRM 3
Plan of Work
Effective
Maintenance
Strategies
and Delivery
SFG 20
1192-3
What an Opportunity !
Copyright 2012 BSI. All rights reserved.
35
Developing
Innocence
Competence
Knowledge Based
Repair as good
as before
Reactive fix it
when it breaks
Excellence
Optimized planning
& decision making
Integrated organization,
systems & processes
Proactive predictive
maintenance
Struggling with
management systems
Proactive, preventive
maintenance
Learning
Applying
Maintenance is an expense
Copyright 2012 BSI. All rights reserved.
Outsourced contracts to
deliver value & cost savings
Embedding
Sound knowledge of
cost, performance &
risk relationships
Integrating
Optimizing
Maintenance is an investment
36
37
Infrastructure Review
38
39
Prioritisation techniques:
Estate Importance:
Building Rating - ABCD
Function Priority - 1234
Asset Performance
Function AB-CDEFX
condition/remaining life
energy efficiency
space utilisation
resilience/capacity
other form of assessments
40
41
ENERGY &
ENVIRONMENTAL
PERFORMANCE
SAFETY,
SECURITY &
COMPLIANCE
BUILDING OPERATIONAL
RISK MANAGEMENT
SPACE
UTILISATION
RISK BANDING
P1 Statutory /Legal
P2 Service Critical
P3 Other Criteria
FUNCTIONAL
SUITABILITY
(CAPACITY & RESILIENCE)
FINANCIAL
(LCC PLANS)
14/10/2013
BS 8544 Communications Event at One Drummond Gate, Victoria, London on 18 th September 2013
42
A PRACTICAL VIEWPOINT
Future State
Agreed
Strategy
Financial
Management
v
Baseline
Defendable
Benchmarks
15- 20%
Savings
Service Level
Model
RED
AMBER
GREEN
Fit For
Function
&
Business
Focused
Direct
Labour
Savings
Right
Skills
V
SLM
regime
Supply Chain
Leverage
Innovation
&
Best Buy
Process
Optimisation
Integrated
Approach
To
Total
LCC
Technology
Application
Cost of
Change
Performance
Management
Control
of asset
Intelligence
(How well
Assets
Performing)
43
44
45
Q2 -
Standardising Asset information will positively impact on CAFM & BIM agenda
Q3
What will be the impact on the current maintenance of retained estates /assets
Thank You
Copyright 2012 BSI. All rights reserved.
46
Introducing BS 8544:2013
Guide for life cycle costing of
maintenance during the in use
phases of buildings
Purchase a copy of BS 8544:2013
from the bsi bookshop:
http://shop.bsigroup.com/