PDVSA N
N251
0
REV.
APPD.
E1994
TITLE
DEC.98
ORIGINAL
DATE
Alexis Arvalo
16
DESCRIPTION
DATE
DEC.98
Y. K.
PAG. REV.
APPD. Jess E. Rojas
A. A.
J. E. R.
APPD.
APPD.
DATE
DEC.98
ESPECIALISTAS
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 1
Indice norma
Index
1 OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1
1.3
1.4
Scope (Exception) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Exceptions (Addition New Subclause) . . . . . . . . . . . . . . . . . . . . . . . . . . .
Responsibilities (Addition New Subclause) . . . . . . . . . . . . . . . . . . . . . . .
2
2
3
REFERENCES (ADDITION) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SERVICE CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2
3.3
3
3
ELECTRICAL PERFORMANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.2
5.4
3
4
6 MECHANICAL FEATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6.1
6.2
6.4
6.5
4
5
6
6
7 CORROSIONRESISTANT TREATMENT . . . . . . . . . . . . . . . . . . . . . .
7.1
7.4
6
6
8 EFFICIENCY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.1
9 TESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.3
12 DATA EXCHANGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
7
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice manual
PDVSA N251
REVISION
FECHA
DEC.98
Indice volumen
Pgina 2
Indice norma
OVERVIEW
This specification covers the Particular Requirements for the design,
manufacture, testing and shipment of Squirrel Cage Induction Motors as detailed
in IEEE Std 841 (Standard for Petroleum and Chemical Industry Severe Duty
Totally Enclosed FanCooled (TEFC) Squirrel Cage Induction Motors up to and
including 500 hp), for use in oil refineries, gas plants, chemical plants, exploration
and production facilities, and supply/marketing installations owned by PDVSA.
This specification along with the Owners Induction Motor Data Sheet (Appendix
A) and the requirements of IEEE Std 841 shall be considered complementary.
Any conflict among them shall be referred to the Owner for clarification before
proceeding with design and manufacture.
The following clauses are amendments, supplements or additions to IEEE Std
841. Clauses that are not mentioned herein shall remain applicable as written.
When the word should appears in the IEEE Std 841, it must be substituted by
shall and, therefore, considered mandatory.
The additional requirements or clarifications specified herein are required in order
to:
a.
Make selections from the options given in the IEEE Std 841.
b.
The following paragraph numbers refer to those used in IEEE Std 841 or added
in this specification.
1.1
Scope (Exception)
This standard applies to high efficiency total enclosed fancooled (TEFC),
horizontal and vertical, single speed, squirrel cage polyphase induction motors,
up to and including 500 hp, in NEMA frame sizes 143T and larger, for petroleum,
chemical, and other severe duty applications (commonly referred to as severe
duty motors). Excluded from the scope of this standard are motors with sleeve
bearings, except as required in subclause 6.1.d, and additional specific features
required for explosionproof motors.
1.2
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
1.3
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 3
Indice norma
REFERENCES (ADDITION)
For any details not mentioned in the referenced standard, the Manufacturer shall
submit his proposed standards for Owners approval. If required, the
Manufacturer shall provide a copy of them.
Written approval must be obtained for the construction of motors using other
standards (IEC, DIN, etc.).
SERVICE CONDITIONS
3.1
3.2
ELECTRICAL PERFORMANCE
4.1
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice manual
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 4
Indice norma
4.2
5.4.a
5.4.c
MECHANICAL FEATURES
5.1
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 5
Indice norma
e) (Addition) For oil lubricated bearings, oil sump temperature shall not exceed
82 C (180 F) based on the specified operating condition and an ambient
temperature of 40 C (104 F). The housing shall be provided with tapped and
plugged fill openings at least 1/2 inch National Pipe Thread (NPT) size. Housings
shall be equipped with constant level sightfeed oilers at least 8 ounces (0.25 liter)
in size, with a positive level positioner (not a set screw), transparent containers
(not subject to sunlightor heat induced opacity or deterioration) and protective
wire cages. A permanent indication of the proper oil level shall be accurately
located and clearly marked on the outside of the bearing housing with permanent
metal tags, marks inscribed in the castings, or another durable means. If the oil
level indicator breaks accidentally, the resulting drop in oil level shall not result in
loss of bearing lubrication, that is, reduction of the oil level below the level required
for normal operation.
f) (Exception) Bearings and bearings housing shall be coated with a rust
preventive compound, compatible to the type of oil or grease required by the
bearing in operation.
g) (Exception) Oil mist lubrication systems are not acceptable.
h) (Addition) Bearings for motors above 200 hp shall be electrically insulated. A
removable shorting device shall be provided in the bearing housing on the drive
end. For doubleend motors, the bearing and coupling on one end shall be
electrically insulated. Motors below 250 hp with a shaft voltage higher than 250
mV (peak), when tested per IEEE Std 112, require grounding the shaft and/or
insulating a bearing.
i) (Addition) Oil lubricated bearings shall use standard hydrocarbon oils.
Synthetic oils are not acceptable.
j) (Addition) Antifriction bearings shall be retained on the shaft and fitted into
housings in accordance with the requirements of ABMA Standard 7. The device
used to lock ball thrust bearings to shafts shall be restricted to a nut with a
tonguetype lock washer.
k) (Addition) If specified in Appendix A, bearing temperature sensing devices
shall be supplied.
5.2
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice manual
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 6
Indice norma
Direction of rotation for motors shall be marked when facing motor from opposite
drive end (according to NEMA MG1, section 2.24). The direction of rotation
required will be indicated in Appendix A.
5.3
Fans (Addition)
Fans shall be bidirectional, unless otherwise specified in Appendix A.
5.4
6.5.b
Material of terminal boxes for voltages above 600V or for frame sizes exceeding
445T shall be as indicated in Appendix A.
6.5.e
Stator winding lead terminals of copper alloy seamless compression type shall be
supplied.
6.5.f
CORROSIONRESISTANT TREATMENT
6.1
6.2
Miscellaneous (Addition)
A cast iron drip cover shall be installed in every vertical motor.
EFFICIENCY
7.1
TESTS
8.1
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice manual
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 7
Indice norma
10 DATA EXCHANGE
10.1
10.2
12.2.1
12.2.2
Each unit shall be suitably prepared for the type and mode of shipment specified
in Appendix A. The preparation shall make the equipment suitable for at least
6 months of outdoor storage from the time of shipment, with no disassembly
required before operation, except for inspection of bearings and seals. Motors
disassembled for shipment or storage shall be provided with marinetype
plywood over all openings and sloped for proper watershed when protected with
exterior covering.
13.2
Manufacturer shall provide the Owner with the instructions necessary to preserve
the integrity of the storage preparation after the equipment arrives at the job site
and before startup.
13.3
Motors shall be prepared for shipment after all testing and inspection have been
completed and it has been released for shipment by the Owners Inspector. As
a minimum, the preparation shall include the following:
13.3.a
13.3.b
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 8
Indice norma
13.3.c
After thorough cleaning, internal areas of bearings and carbon steel oil systems
auxiliary equipment shall be coated with a suitable oil soluble rust preventive.
13.3.d
Flanged openings shall be provided with metal closures at least 4.8 millimeters
thick, with synthetic rubber gaskets and at least four fulldiameter bolts.
13.3.e
Threaded openings shall be provided with steel caps or solid shank steel plugs.
In no case shall nonmetallic caps or plugs be used.
(13.3.f)
When specified, motor shall be mounted on a rigid skid or base suitable for
handling by forklift, truck, or crane. This skid shall extend beyond all surfaces of
the motor.
13.3.g
13.3.h
Space heater leads shall be accessible without disturbing the shipping package
and shall be suitably tagged for easy identification.
13.4
Lifting points and lifting lugs shall be clearly marked. Each motor shall be properly
identified with item and serial numbers. Material shipped in separate crates shall
be suitable identified with securely affixed, corrosionresistant metal tags,
indicating the item and serial number of the equipment for which it is intended.
The recommended lifting arrangement shall be identified on boxed equipment.
13.5
The fitup and assembly of motormounted piping, coolers, and other equipment
shall be completed in the Manufacturers shop before shipping, unless specifically
approved by the Owner.
13.6
Exposed shaft and shaft couplings shall be wrapped with waterproof, moldable
waxed cloth or vapor phase inhibitor paper. The seams shall be sealed with
oilproof adhesive tape.
13.7
Components (both individual pieces and packaged sets) shipped with mounted
preassembled piping, tubing, or wiring shall comply with the requirements of the
Occupational Safety and Health Administration.
13.8
13.9
Bearing assemblies shall be fully protected from the entry of moisture and dirt.
If vapor phase inhibitor crystals in bags are installed in large cavities to absorb
moisture, the bags must be attached in an accessible area for case of removal.
Where applicable, bags shall be installed in wire cages attached to flanged
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
Indice volumen
PDVSA N251
REVISION
FECHA
DEC.98
Pgina 9
Indice norma
13.10
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 1
Indice volumen
Indice norma
APPENDIX A
OWNERS INDUCTION
MOTOR DATA SHEET
APPLICABLE TO:
PROJECT No.
1
PAGE
PURCHASE
PROPOSAL
ITEM No.
3
OF
DATE
BY
REVISION
PLANT
DRIVEN EQUIPMENT
LOCATION
QUANTITY REQUIRED
SERVICE
TAG No.
MOTOR DESIGN DATA
RESPONSIBILITIES (1.4)
INDEPENDENT
OTHER:
9
10
11
12
AREA CLASSIFICATION (3. 2a): CLASS___________ DIVISION __________ GROUP________ TEMP. CLASS
13
14
15
16
CONTACTOR
AUTOMATIC REACCELERATION
CONDITION:
CIRCUIT
BREAKER
REQUIRED
TYPE: SF6
VACUUM
17
OTHER:
19
NOT REQUIRED
20
RATINGS (4)
NAMEPLATE HP (4.1):__________________
18
SERVICE FACTOR:
1.0 (PREFERRED)
1.15
21
22
23
24
25
TEFC
26
NEMA D
OTHER:
OTHER:
27
28
29
30
31
32
F
OTHER
33
34
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 2
Indice volumen
Indice norma
APPENDIX A
OWNERS INDUCTION
MOTOR DATA SHEET
APPLICABLE TO:
PROPOSAL
PROJECT No.
2
PAGE
PURCHASE
ITEM No.
OF
DATE
BY
REVISION
PLANT
DRIVEN EQUIPMENT
LOCATION
QUANTITY REQUIRED
SERVICE
TAG No.
MOTOR DESIGN DATA
NOT REQUIRED
REQUIRED
2
3
ROLLER
MANUFACTURERS STANDARD
SLEEVE
REQUIRED
NOT REQUIRED
DRAIN
5
6
BEARING
VERTICAL
HORIZONTAL
FOOT MOUNTED
SHAFT UP
SHAFT DOWN
10
NONE (WHEN DRIVEN EQUIPMENT TRUST IS TAKEN BY ITS OWN THRUST BEARING)
11
12
13
COUPLING MANUFACTURER:
CCW
UNIDIRECTIONAL
GEAR
COPPER
CW
ALUMINUM
MANUFACTURERS STANDARD
F1
17
19
OTHER:
20
21
22
23
24
ECONOMICAL EVALUATION (8.1): LOSSES EVALUATION FACTOR ($/kW): __________________ AT ____________________% FULL LOAD
25
26
16
18
OTHER:
14
15
MAIN TERMINAL BOX (6.5.b): p 600 V AND t 445T FRAME: CAST IRON
NOT REQUIRED
27
28
29
REQUIRED
NOT REQUIRED
30
31
32
DRAWINGS REQUESTED:
33
34
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 3
Indice volumen
Indice norma
APPENDIX A
OWNERS INDUCTION
MOTOR DATA SHEET
APPLICABLE TO:
PROPOSAL
PROJECT No.
PAGE
PURCHASE
ITEM No.
OF
BY
DATE
PLANT
DRIVEN EQUIPMENT
LOCATION
QUANTITY REQUIRED
SERVICE
TAG No.
REVISION
DOMESTIC EXPORT
MOUNTED ON SKID
OTHER REQUIREMENTS:
_______________________________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
10
_______________________________________________________________________________________________________________________ 11
_______________________________________________________________________________________________________________________ 12
REMARKS: ___________________________________________________________________________________________________________
13
_______________________________________________________________________________________________________________________ 14
_______________________________________________________________________________________________________________________ 15
_______________________________________________________________________________________________________________________ 16
_______________________________________________________________________________________________________________________ 17
_______________________________________________________________________________________________________________________ 18
REQUIRED
WITNESSED
OBSERVED
19
20
21
ROUTINE TEST
22
__________________________________________________________________________________
24
__________________________________________________________________________________
25
__________________________________________________________________________________
26
__________________________________________________________________________________
27
__________________________________________________________________________________
28
__________________________________________________________________________________
29
__________________________________________________________________________________
30
__________________________________________________________________________________
31
__________________________________________________________________________________
32
23
OTHER:
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 1
Indice volumen
Indice norma
APPENDIX B
1.
BIDDERS INDUCTION
MOTOR PROPOSAL DATA SHEET
(REQUIRED WITH PROPOSAL)
PROJECT No.
1
PAGE
ITEM No.
1
OF
BY
DATE
REVISION
PROPOSAL No.
BIDDER
PURCHASE BY
OWNER
TAG No.
HORSEPOWER_____________FULL LOAD SPEED (RPM)
DESIGN DATA
LOAD
LOCKED ROTOR:
AMPERES
EFFICIENCY
POWER FACTOR
CODE LETTER
GUARANTEE EFF .
POWER FACTOR
IEEE METHOD
MOTOR ROTOR
Wk2
3/4
FULL
SF
1
2
8
9
NET WEIGHT
11
12
10
13
14
15
CURVE No.
16
17
18
19
90 % VOLTAGE, ______________SEC
20
21
22
70 % VOLTAGE, ______________SEC
23
24
90 % VOLTAGE, ______________SEC
25
26
BEARING TYPE
27
28
29
REMARKS:
30
31
32
33
34
35
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 1
Indice volumen
Indice norma
APPENDIX C
MANUFACTURERS INDUCTION1.
MOTOR CONTRACT DATA SHEET
PROJECT No.
1
PAGE
ITEM No.
BY
OF
DATE
REVISION
CONTRACT No.
TAG No.
AS BUILT
AS DESIGNED
GENERAL INFORMATION
PLANT
MODEL
LOCATION
UNIT
SERVICE
DRIVEN EQUIPMENT
MANUFACTURER
QUANTITY REQUIRED
SERIAL No.
MOTOR DATA
SUBTRANSIENT REACTANCE X
MANUFACTURES TYPE
BI DIRECTIONAL
FULL
HERTZ
CLOCKWISE
COUNTERCLOCKWISE
LOAD
1/2
3/4
SF
AMPERES
EFFICIENCY
10
POWER FACTOR
11
12
BEARING LOADING:____________PSI
13
THRUST BEARING:
14
CODE LETTER:
15
BEARING LUBRICATION:
16
17
TORQUE % OF RATED:
18
LOCKED ROTOR__________PULL UP
19
TOP
BOTTOM
OIL
GREASE
BREAKDOWN ______________
20
80 % VOLTAGE, _____________SEC
21
22
23
CURVE NUMBERS:
24
INSULATION SYSTEM:
25
CLASS _____________
26
28
AT ________________SF
RATED TEMPERATURE:
BY RESISTANCE RTD
29
30
ENGINEERING SPECIFICATION
PDVSA
PDVSA N251
.Men Principal
Indice manual
REVISION
FECHA
DEC.98
Pgina 2
Indice volumen
Indice norma
APPENDIX C
MANUFACTURERS INDUCTION1.
MOTOR CONTRACT DATA SHEET
PROJECT No.
2
PAGE
ITEM No.
OF
BY
DATE
CONTRACT No.
TAG No.
REVISION
ACCESSORIES
1
2WIRE SYSTEM
3WIRE SYSTEM
RECOMMENDED TRIP SETTING, C ___________________________________
NORMALLY OPEN
NORMALLY CLOSED
4
6
7
9
10
12
SURGE PROTECTION:
14
16
17
OTHER INFORMATION
18
DRAWING REFERENCES
WINDING THROW
19
ACCESSORIES OUTLINE
WINDING CONNECTION
20
WIRING DIAGRAM
21
22
23
DIMENSIONS:
OTHER INFORMATION:
24
25
26
27
28
29
30
31
OD__________________ID ______________THICKNESS
32
33
34
DRAWINGS REQUESTED:
SHAFT MATERIAL
35
GRADE OF CASTINGS
36
37
38
39
40
REMARKS:
41
42
43
ENGINEERING SPECIFICATION
PDVSA
.Men Principal
PDVSA N251
REVISION
FECHA
DEC.98
Indice volumen
Pgina 1
Indice norma
APPENDIX D
DEVIATIONS AND EXCEPTIONS TAKEN BY BIDDER
CLAUSE
EXCEPTIONS/DEVIATIONS
BIDDER:
EXPLANATION AND
PROPOSED OPTION
DATE:
Note: