Anda di halaman 1dari 1

Federal Register / Vol. 70, No.

180 / Monday, September 19, 2005 / Rules and Regulations 54835

After consideration of all relevant FOR FURTHER INFORMATION CONTACT: Issued in Washington, DC, on September
material presented, including the Mark Friedrichs, PI–40, Office of Policy 13, 2005.
information and recommendation and International Affairs, U.S. Karen A. Harbert,
submitted by the Committee and other Department of Energy, 1000 Assistant Secretary, Policy and International
available information, it is hereby found Independence Ave., SW., Washington, Affairs.
that this rule, as hereinafter set forth, DC 20585, or e-mail: [FR Doc. 05–18628 Filed 9–15–05; 9:21 am]
will tend to effectuate the declared 1605bguidelines.comments@hq.doe.gov. BILLING CODE 6450–01–P
policy of the Act.
List of Subjects in 7 CFR Part 922 SUPPLEMENTARY INFORMATION: As DOE
explained in the notice of interim final DEPARTMENT OF TRANSPORTATION
Apricots, Marketing agreements, rulemaking, the Technical Guidelines
Reporting and recordkeeping that supplement the General Guidelines Federal Aviation Administration
requirements. will provide the specificity necessary
PART 922—APRICOTS GROWN IN for DOE to fully implement the 14 CFR Part 39
DESIGNATED COUNTIES IN greenhouse gas emissions inventory and
[Docket No. FAA–2005–20944; Directorate
WASHINGTON emissions reduction elements of the Identifier 2003–NE–64–AD; Amendment 39–
voluntary reporting guidelines (70 FR 14247; AD 2005–18–01]
■ Accordingly, the interim final rule 15171). DOE received a substantial
amending 7 CFR part 922 which was number of written comments on the RIN 2120–AA64
published at 70 FR 36812 on June 27, Interim Final General Guidelines and
2005, is adopted as a final rule without Airworthiness Directives; General
draft Technical Guidelines, and DOE Electric Company CT7–5, –7, and –9
change. expects to issue final General and Series Turboprop Engines
Dated: September 14, 2005. Technical Guidelines by the end of
Lloyd C. Day, 2005. At that time, the Energy AGENCY: Federal Aviation
Administrator, Agricultural Marketing Information Administration (EIA) will Administration (FAA), Department of
Service. prepare reporting forms that conform to Transportation (DOT).
[FR Doc. 05–18584 Filed 9–16–05; 8:45 am] the Final General Guidelines and Final ACTION: Final rule.
BILLING CODE 3410–02–P Technical Guidelines and begin
developing the electronic reporting SUMMARY: The FAA is adopting a new
software necessary to implement the airworthiness directive (AD) for General
DEPARTMENT OF ENERGY revised Program. Electric Company (GE) CT7–5A2, –5A3,
–7A, –7A1, –9B, –9B1, and –9B2
10 CFR Part 300 Because DOE does not expect to issue turboprop engines, with stage 2 turbine
final guidelines until the end of the aft cooling plate, part number (P/N)
RIN 1901–AB11 calendar year, and because the Office of 6064T07P01, 6064T07P02, 6064T07P05,
Management and Budget (OMB) or 6068T36P01 installed. This AD
Guidelines for Voluntary Greenhouse
clearance process under the Paperwork requires a onetime eddy current
Gas Reporting
Reduction Act for EIA’s revised inspection (ECI) of certain P/N stage 2
AGENCY: Office of Policy and reporting forms will take at least 120 turbine aft cooling plate boltholes. This
International Affairs, U.S. Department of days following the issuance of the final AD results from reports of six stage 2
Energy. guidelines, DOE is delaying the turbine aft cooling plates found cracked
ACTION: Final rule; delay of effective September 20, 2005 effective date of the during inspection. We are issuing this
date. rule published on March 24, 2005 until AD to prevent stage 2 aft cooling plate
June 1, 2006. This delay in the effective separation, resulting in uncontained
SUMMARY: The Department of Energy engine failure and damage to the
date will allow EIA time to complete the
(DOE) published interim final General airplane.
development of revised reporting forms,
Guidelines for its Voluntary Reporting
including an opportunity for public DATES: This AD becomes effective
of Greenhouse Gases Program on March
24, 2005 (70 FR 15169), and published review, after the final General and October 24, 2005. The Director of the
in the same issue of the Federal Register Technical Guidelines are issued at the Federal Register approved the
a notice of availability inviting public end of 2005. Once EIA has completed incorporation by reference of certain
comment on draft Technical Guidelines the development of its planned publications listed in the regulations as
needed to fully implement the revised electronic reporting system, of October 24, 2005.
Voluntary Reporting of Greenhouse approximately 9 to 12 months after the ADDRESSES: You can get the service
Gases Program (70 FR 15164). DOE guidelines are finalized, reporting information identified in this AD from
today is delaying the effective date of entities would be able to use it to report General Electric Aircraft Engines CT7
the guidelines to address the comments under the revised guidelines. Since it is Series Turboprop Engines, 1000
received by DOE in response to the unlikely that entities will be able to Western Ave., Lynn, MA 01910;
March 24, 2005 Federal Register notice report under the revised guidelines by telephone (781) 594–3140, fax (781)
and to align the effective date with the July 1, 2006, DOE will revise the 594–4805.
likely availability of final reporting General Guidelines to provide that You may examine the AD docket on
forms being developed by the Energy entities may use DOE’s October 1994 the Internet at http://dms.dot.gov or in
Information Administration. guidelines for reporting in calendar year Room PL–401 on the plaza level of the
DATES: The effective date of the rule 2006. Entities that wish to report their Nassif Building, 400 Seventh Street,
establishing 10 CFR part 300 published emissions and reductions for 2005, or SW., Washington, DC.
in the Federal Register at 70 FR 15169 prior years, using the revised guidelines FOR FURTHER INFORMATION CONTACT:
on March 24, 2005, is delayed until June will be able to do so during the normal Eugene Triozzi, Aerospace Engineer,
1, 2006. 2007 reporting cycle. Engine Certification Office, FAA, Engine

VerDate Aug<31>2005 15:27 Sep 16, 2005 Jkt 205001 PO 00000 Frm 00003 Fmt 4700 Sfmt 4700 E:\FR\FM\19SER1.SGM 19SER1

Anda mungkin juga menyukai