Anda di halaman 1dari 2

53786 Federal Register / Vol. 70, No.

175 / Monday, September 12, 2005 / Notices

DEPARTMENT OF ENERGY Pell as indicated in the ADDRESSES a finding that the proposed project is
section below on or before September consistent with the public interest. In
[Docket No. PP–89–1]
21, 2005. Requests to speak may also be determining consistency with the public
Notice of Public Hearings for the made at the time of registration for the interest, DOE considers the
Proposed Bangor Hydro-Electric hearing(s). However, persons who have environmental impacts of the proposed
Company (BHE) Northeast Reliability submitted advance requests to speak project pursuant to NEPA, the project’s
Interconnect will be given priority if time should be impact on electric reliability by
limited during the meeting. ascertaining whether the proposed
AGENCY: Department of Energy. ADDRESSES: Requests to speak at the project would adversely affect the
ACTION: Notice of public hearings. public hearings should be addressed to: operation of the U.S. electric power
SUMMARY: The Department of Energy
Dr. Jerry Pell, Office of Electricity supply system under normal and
(DOE) announces two public hearings Delivery and Energy Reliability (OE–20), contingency conditions, and any other
on the ‘‘Draft Environmental Impact U.S. Department of Energy, Washington, factors that DOE may also consider
Statement for the Bangor Hydro-Electric DC 20585, or transmitted by phone: relevant to the public interest. The
Company (BHE) Northeast Reliability 202–586–3362, facsimile: 202–318– regulations implementing the E.O. have
Interconnect’’ (DOE/EIS–0372). The 7761, or electronic mail at
been codified at 10 CFR 205.320–
Draft EIS was prepared pursuant to the Jerry.Pell@hq.doe.gov. Please be aware
205.329. Issuance of the permit
National Environmental Policy Act of that anthrax screening delays
indicates that there is no Federal
1969 (NEPA), as amended, 42 U.S.C. conventional mail delivery to DOE.
The locations of the public hearings objection to the project, but does not
4321 et seq., the Council on mandate that the project be completed.
Environmental Quality NEPA are:
1. Woodland Elementary School, 23 On January 22, 1996, DOE issued
regulations, 40 CFR parts 1500–1508,
Fourth Avenue, Baileyville, Maine. Presidential Permit PP–89 which
and the DOE NEPA regulations, 10 CFR 2. Jeff’s Catering Banquet &
part 1021. The U.S. Fish and Wildlife authorized BHE to construct a single-
Convention Center, East West Industrial circuit, 345,000-volt (345–kV)
Service (USFWS) and the National Park, 5 Coffin Avenue, Brewer, Maine.
Marine Fisheries Service (NOAA alternating current transmission line
Copies of the Draft EIS are available that would originate at BHE’s Orrington
Fisheries) are cooperating agencies in in paper format, accompanied by a CD–
the preparation of this Draft EIS. Substation, extend eastward
ROM containing the entire Draft EIS, or
The proposed DOE action in the Draft approximately 85 miles (137–km), and
as a CD–ROM only. Requests for
EIS is to amend BHE’s existing additional copies in either format cross the U.S.-Canada border near
Presidential permit to allow should be addressed to Dr. Pell at any Baileyville, Maine. Before granting the
construction along the Modified of the addresses above. Additionally, Presidential permit, DOE prepared an
Consolidated Corridors Route of a the Draft EIS is available on the project EIS which analyzed the environmental
single-circuit, 345,000-volt, electric Internet Web site at http:// impacts of various alternative actions
transmission line that would cross the web.ead.anl.gov/interconnecteis, and and routes. The preferred alternative in
U.S. international border in the vicinity also on the DOE NEPA Web site at the EIS and in the Record of Decision
of Baileyville, Maine. DOE has prepared http://www.eh.doe.gov/nepa/docs/deis/ was to grant a Presidential permit for
this Draft EIS to evaluate the potential deis.html. construction of the transmission line
environmental impacts in the United Written comments on the Draft EIS along the Stud Mill Road route.
States of the proposed action and the may be addressed to Dr. Jerry Pell as However, the project was never
range of reasonable alternatives, indicated in the ADDRESSES section of constructed and on September 30, 2003,
including the No Action alternative. this notice or submitted on the project BHE applied to DOE to amend
DATES: DOE invites interested Members Web site at http://web.ead.anl.gov/ Presidential Permit PP–89 by allowing
of Congress, state and local interconnecteis. construction of the proposed
governments, other Federal agencies,
FOR FURTHER INFORMATION CONTACT: For transmission line along a route other
American Indian tribal governments,
information on the proposed project or than the Stud Mill Road route.
organizations, and members of the
public to provide comments on the Draft to receive a copy of the Draft EIS,
Alternatives Considered
EIS. The public comment period began contact Dr. Pell as indicated in the
ADDRESSES section of this notice. The proposed DOE action in the Draft
on August 26, 2005, with the
For general information on the DOE EIS is to amend BHE’s existing
publication of the Notice of Availability
NEPA process, contact: Carol M. Presidential permit to allow
of the Draft EIS in the Federal Register
Borgstrom, Director, Office of NEPA construction along the Modified
by the Environmental Protection Agency
Policy and Compliance (EH–42), U.S. Consolidated Corridors Route. DOE has
and will continue until October 11,
Department of Energy, 1000
2005. Written and oral comments will prepared this Draft EIS to evaluate the
Independence Avenue, SW.,
be given equal weight, and DOE will potential environmental impacts in the
Washington, DC 20585, Phone: 202–
consider all comments received or United States of the proposed action
586–4600 or leave a message at 800–
postmarked by that date in preparing and the range of reasonable alternatives,
472–2756; Facsimile: 202–586–7031.
the Final EIS. Comments received or including the No Action alternative.
postmarked after that date will be SUPPLEMENTARY INFORMATION: Executive
Under the No Action alternative, only
considered to the extent practicable. Order (E.O.) 10485, as amended by E.O.
12038, requires that a Presidential the previously permitted route (the Stud
Dates for the public hearings are: Mill Road route) could be utilized by
1. September 28, 2005, 7 p.m. to 9 permit be issued by DOE before electric
transmission facilities may be BHE for construction of the
p.m., Baileyville, Maine.
2. September 29, 2005, 7 p.m. to 9 constructed, maintained, operated, or transmission line. In addition to the
p.m., Brewer, Maine. connected at the U.S. international Modified Consolidated Corridors Route
Requests to speak at a specific public border. The E.O. provides that a and the Previously Permitted Route, two
hearing should be received by Dr. Jerry Presidential permit may be issued after other alternative routes are analyzed in

VerDate Aug<18>2005 17:17 Sep 09, 2005 Jkt 205001 PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1
Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices 53787

the Draft EIS: the Consolidated Company, Chandeuleur Pipe Line Company, protests must be filed on or before the
Corridors Route, and the MEPCO South Colorado Interstate Gas Company, Eastern date as indicated below. Anyone filing
Route. DOE also analyzed a rescission Shore Natural Gas Company, El Paso Natural an intervention or protest must serve a
Gas Company, Enbridge Pipelines (AlaTenn)
alternative under which the existing copy of that document on the Applicant.
L.L.C., Enbridge Pipelines (KPC), Enbridge
permit would be rescinded and no Pipelines (Midla) L.L.C., Garden Banks Gas Anyone filing an intervention or protest
international transmission line could be Pipeline, L.L.C., Guardian Pipeline, L.L.C., on or before the intervention or protest
constructed. As indicated in the Draft Gulf South Pipeline Company, LP, Kern date need not serve motions to intervene
EIS, DOE has designated the Modified River Gas Transmission Company, Kinder or protests on persons other than the
Consolidated Corridors Route as its Morgan Interstate Gas Transmission LLC, KO Applicant.
preferred alternative. Transmission Company, Midwestern Gas The Commission encourages
Transmission Company, Mississippi Canyon electronic submission of protests and
Availability of the Draft EIS Gas Pipeline, LLC, Mojave Pipeline
interventions in lieu of paper using the
DOE has distributed copies of the Company, Nautilus Pipeline Company,
L.L.C., Northeast Pipeline Corporation, Ozark ‘‘eFiling’’ link at http://www.ferc.gov.
Draft EIS to appropriate members of Gas Transmission, L.L.C., Panther Interstate Persons unable to file electronically
Congress, state and local government Pipeline Energy, LLC., Questar Pipeline should submit an original and 14 copies
officials in Maine, American Indian Company, Questar Southern Trails Pipeline of the protest or intervention to the
tribal governments, and other Federal Company, Sabine Pipe Line LLC, Sabine Pipe Federal Energy Regulatory Commission,
agencies, groups, and interested parties. Line LLC, SCG Pipeline, Inc., Southern Star 888 First Street, NE., Washington, DC
Copies of the document may be Central Gas Pipeline, Inc., Stingray Pipeline 20426.
obtained by contacting DOE as provided Company, L.L.C., TransColorado Gas
This filing is accessible on-line at
in the ADDRESSES section of this notice. Transmission Company, Viking Gas
Transmission Company, Wyoming Interstate http://www.ferc.gov, using the
Copies of the Draft EIS are also available ‘‘eLibrary’’ link and is available for
Company, Ltd., Young Gas Storage Company,
for inspection at the locations identified Ltd. review in the Commission’s Public
below: Reference Room in Washington, DC.
1. Bangor Public Library, 145 Harlow Take notice that the above-referenced
There is an ‘‘eSubscription’’ link on the
St., Bangor, ME 04401. pipelines tendered for filing their tariff
Web site that enables subscribers to
2. Brewer Public Library, 24 Union sheets respectively, pursuant to Section
receive e-mail notification when a
St., Brewer, ME 04412. 154.402 of the Commission’s
document is added to a subscribed
3. Calais Free Library, 9 Union St., regulations, to reflect the Commission’s
docket(s). For assistance with any FERC
Calais, ME 04619. change in the unit rate for the Annual
Online service, please e-mail
4. Orrington Public Library, 15 School Charge Adjustment (ACA) surcharge to
FERCOnlineSupport@ferc.gov, or call
St., Orrington, ME 04474. be applied to rates for recovery of 2005
5. Princeton Public Library, Main (866) 208–3676 (toll free). For TTY, call
Annual Charges. The proposed effective
Street, Princeton, ME 04668. (202) 502–8659.
date of the tariff sheets is October 1,
6. Baileyville Public Library, 169 Intervention, Protest Date: 5 p.m.
2005.
Main Street, Baileyville, ME 04694. The above-referenced pipelines state eastern time on September 13, 2005.
Issued in Washington, DC, on September 6, that the purpose of their filings is to Magalie R. Salas,
2005. reflect the revised ACA effective for the Secretary.
Anthony J. Como, twelve-month period beginning October [FR Doc. E5–4956 Filed 9–9–05; 8:45 am]
Director, Permitting and Siting, Office of 1, 2005. The pipelines further state that BILLING CODE 6717–01–P
Electricity Delivery and Energy Reliability. their tariff sheets reflect a decrease of
[FR Doc. 05–18023 Filed 9–9–05; 8:45 am] $0.0001 per Dth in the ACA adjustment
BILLING CODE 6450–01–P
surcharge, resulting in a new ACA rate DEPARTMENT OF ENERGY
of $0.0018 Dth as specified by the
Commission in its invoice dated June Federal Energy Regulatory
DEPARTMENT OF ENERGY 30, 2005, for the Annual Charge Commission
Billing—Fiscal year 2005.
Federal Energy Regulatory Due to the large number of pipelines [Project No. 2602]
Commission that have filed to comply with the
Annual Charge Adjustment Billing, the Duke Power, a Division of Duke Energy
[RP05–544–000, et al.]
Commission is issuing this single notice Corporation, Nantahala Area; Notice of
CenterPoint Energy—Mississippi River of the filings included in the caption. Authorization or Continued Project
Transmission Corporation et al.; Any person desiring to become part in Operation
Notice of Proposed Changes in FERC any of the listed dockets must file a
separate motion to intervene in each September 6, 2005.
Gas Tariff
docket for which they wish party status. On July 22, 2003, Duke Power, a
September 2, 2005. Any person desiring to intervene or to division of Duke Energy Corporation,
In the matter of: RP05–570–000, RP05– protest this filing must file in Nantahala Area, licensee for the
570–000, RP05–575–000, RP05–548–000, accordance with Rules 211 and 214 of Dillsboro Project No. 2602, filed an
RP05–576–000, RP05–541–000, RP05–539– the Commission’s Rules of Practice and application for subsequent license
000, RP05–540–000, RP05–542–000, RP05– Procedure (18 CFR 385.211 and pursuant to the Federal Power Act
563–000, RP05–400–001, RP05–547–000, 385.214). Protests will be considered by (FPA) and the Commission’s
RP05–554–000, RP05–568–000, RP05–562– the Commission in determining the regulations. The application for
000, RP05–538–000, RP05–577–000, RP05– appropriate action to be taken, but will subsequent license will be held in
545–000, RP05–558–000, RP05–569–000,
RP05–557–000, RP05–551–000, RP05–555–
not serve to make protestants parties to abeyance pending Commission
000, RP05–455–001, RP05–571–000, RP05– the proceeding. Any person wishing to processing of a surrender application
592–000, RP05–572–000, RP05–543–000, become a party must file a notice of filed on June 1, 2004. Project No. 2602
RP05–556–000, RP05–561–000, RP05–578– intervention or motion to intervene, as is located on the Tuckasegee River in
000, RP05–579–000: Chandeleur Pipe Line appropriate. Such notices, motions, or Jackson County, North Carolina.

VerDate Aug<18>2005 17:17 Sep 09, 2005 Jkt 205001 PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1

Anda mungkin juga menyukai