Service Contract

PT. Mercedes Benz Indonesia

Gunung Putri, December 19th, 2014


Ary Suryarama Rusiadi

Definition
1. PMA : Preventive Maintenance A
* Visual check
* Free speed test
* Shut off/Trim mechanism
2. PMB : Preventive Maintenance B
* PMA
* Moving parts replacement
e.g. O-ring, bearing, vane kit, etc.
* Calibration (Electric Tools)
3. Break down / Repair : Unscheduled corrective action

Definition
4. TAT (Turnaround Time)
Waktu yang dibutuhkan untuk melakukan maintenance.
5. MTBF (Mean Time Before Failure)
Rata-rata waktu sebelum terjadi breakdown.
6. MTTR (Mean Time To Repair)
Rata-rata waktu yang dibutuhkan untuk proses repair.

Summary of All Department

Summary of All Department

Summary of All Department

Summary of All Department

Summary of All Department

Summary of APC Department

Summary of APC Department


Breakdown Tool Information
1. Tool information
- Tool type

: ETV ST61-70-B13

- Serial No.

: F1821189

- Departement

: APC

2. Breakdown information
- Problem

: Broken tool connector

- Month

: Week 6, February 2014

3. Action

: Replace with new tool connector

4. Remarks
: Turn around time was around 3 months due to warranty
claim process and custom clearance problem

10

Summary of APC Department

11

Summary of APC Department

12

Summary of APC Department

13

Summary of APC Department

14

Summary of AGC Department

15

Summary of AGC Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP8PTS40HR42-AT

- Serial No.

: A0851629

- Departement

: AGC

2. Breakdown information

16

- Problem

: Over torque

- Month

: Week 7, February 2014

3. Action

: Pulse oil checking, re-set torque and torque verification

4. Remarks

:-

Summary of AGC Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP5PTX19HR10-RE

- Serial No.

: A2491401

- Departement

: AGC

2. Breakdown information

17

- Problem

: Low speed

- Month

: Week 9, February 2014

3. Action

: Pulse oil checking, re-set torque and torque verification

4. Remarks

:-

Summary of AGC Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP15PTX250HR20 RE

- Serial No.

: A2471163

- Departement

: AGC

2. Breakdown information

18

- Problem

: Loose ring screw

- Month

: Week 13, March 2014

3. Action

: Re-tighten the screw and torque verification

4. Remarks

:-

Summary of AGC Department

19

Summary of AGC Department

20

Summary of AGC Department

21

Summary of AGC Department

22

Summary of ACV Department

23

Summary of ACV Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP15PTX250HR20-RE

- Serial No.

: A2771715

- Departement

: ACV

2. Breakdown information

24

- Problem

: Low speed

- Month

: Week 1, January 2014

3. Action

: Check motor and torque verification

4. Remarks

:-

Summary of ACV Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP15PTX250HR20-RE

- Serial No.

: A2481470

- Departement

: ACV

2. Breakdown information

25

- Problem

: Loose ring screw

- Month

: Week 3, January 2014

3. Action

: Re-tighten the screw and torque verification

4. Remarks

:-

Summary of ACV Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP15PTX150HR20-RE

- Serial No.

: A0403519

- Departement

: ACV

2. Breakdown information

26

- Problem

: Low speed

- Month

: Week 7, February 2014

3. Action

: Check motor and torque verification

4. Remarks

:-

Summary of ACV Department


Breakdown Tool Information
1. Tool information
- Tool type

: EP7PTX55HR10-RE

- Serial No.

: A1470732

- Departement

: ACV

2. Breakdown information

27

- Problem

: Low speed

- Month

: Week 24, June 2014

3. Action

: Check motor and torque verification

4. Remarks

:-

Summary of ACV Department

28

Summary of ACV Department

29

Summary of ACV Department

30

Summary of ACV Department

31

Committed to
sustainable productivity.

32