Anda di halaman 1dari 2

Federal Register / Vol. 70, No.

148 / Wednesday, August 3, 2005 / Notices 44615

Comment Date: 5 p.m. on July 26, of the intervention or protest to the Any comments should be filed within
2005. Federal Energy Regulatory Commission, 30 days from the issuance date of this
888 First Street, NE., Washington, DC notice, and should be addressed to the
Magalie R. Salas,
20426. Secretary, Federal Energy Regulatory
Secretary. The filing in the above proceeding is Commission, 888 First Street, NE.,
[FR Doc. 05–15398 Filed 8–2–05; 8:45 am] accessible in the Commission’s eLibrary Room 1–A, Washington, DC 20426.
BILLING CODE 6717–01–P system. It is also available for review in Please affix ‘‘Ohio Falls Hydroelectric
the Commission’s Public Reference Project No. 289’’ to all comments.
Room in Washington, DC. There is an Comments may be filed electronically
DEPARTMENT OF ENERGY eSubscription link on the Web site that via Internet in lieu of paper. The
enables subscribers to receive e-mail Commission strongly encourages
Federal Energy Regulatory
notification when a document is added electronic filings. See 18 CFR
Commission
to a subscribed docket(s). For assistance 385.2001(a)(1)(iii) and the instructions
[Docket No. EL05–128–000] with any FERC Online service, please e- on the Commission’s Web site under the
mail FERCOnlineSupport@ferc.gov or ‘‘eFiling’’ link. For further information,
Quest Energy, L.L.C., Complainant v. call (866) 208–3676 (toll free). For TTY, contact John Costello at (202) 502–6119.
Midwest Independent Transmission call (202) 502–8659.
System Operator, Inc., Respondent; Magalie R. Salas,
Comment Date: 5 p.m. on July 7,
Notice of Complaint Requesting Fast 2005. Secretary.
Track Processing [FR Doc. E5–4167 Filed 8–2–05; 8:45 am]
Linda Mitry, BILLING CODE 6717–01–P
June 23, 2005. Deputy Secretary.
Take notice that on June 22, 2005, [FR Doc. E5–4157 Filed 8–2–05; 8:45 am]
Quest Energy, L.L.C. (Quest) filed a BILLING CODE 6717–01–P DEPARTMENT OF ENERGY
complaint against Midwest Independent
Transmission System Operator, Inc. Federal Energy Regulatory
(MISO) pursuant to Rule 206 of the DEPARTMENT OF ENERGY Commission
Commission’s Rules of Practice and
[Docket No. CP05–49–000]
Procedure (18 CFR 385.206). Quest’s Federal Energy Regulatory
complaint states that MISO violated the Commission Northern Natural Gas Company; Notice
express terms of its tariff by: (1) of Availability of the Environmental
[Project No. 289–013–Kentucky]
Requiring customers to post Security to Assessment for the Proposed Bluff
cover the newly-imposed SECA Louisville Gas and Electric Company; Creek/Tomah Expansion Project
surcharge; and (2) requiring payment Notice of Availability of Environmental
into escrow of the SECA charges if the Assessment July 7, 2005.
charge is disputed pursuant to the The staff of the Federal Energy
billing dispute provisions of the MISO July 29, 2005. Regulatory Commission (FERC or
tariff. In accordance with the National Commission) has prepared an
Any person desiring to intervene or to Environmental Policy Act of 1969 and environmental assessment (EA) on the
protest in of the above proceeding must the Federal Energy Regulatory natural gas pipeline facilities proposed
file in accordance with Rules 211 and Commission’s regulations, 18 CFR part by Northern Natural Gas Company,
214 of the Commission’s Rules of 380 (Order No. 486, 52 FR 47879), the (Northern) in the above-referenced
Practice and Procedure (18 CFR 385.211 Office of Energy Projects has reviewed docket.
and 385.214) on or before 5 p.m. eastern the application for a new license for the The EA was prepared to satisfy the
time on the specified comment date. Ohio Falls Hydroelectric Project, located requirements of the National
Anyone filing a motion to intervene or on the Ohio River, in Jefferson County, Environmental Policy Act. The staff
protest must serve a copy of that Kentucky, and has prepared an concludes that approval of the proposed
document on the Complainant. Environmental Assessment (EA). In the project, with appropriate mitigating
Respondent’s answer and all EA, Commission’s staff analyze the measures, would not constitute a major
interventions, or protests must be filed potential environmental effects of federal action significantly affecting the
on or before the comment date. The relicensing the project and conclude quality of the human environment.
Respondent’s answer, motions to that issuing a new license for the The EA assesses the potential
intervene, and protests must be served project, with appropriate environmental environmental effects of the
on the Complainants. measures, would not constitute a major construction and operation of the
The Commission encourages Federal action significantly affecting the proposed 3.2 miles of 30-inch diameter
electronic submission of protests and quality of the human environment. pipeline in Lafayette County, Wisconsin
interventions in lieu of paper, using the A copy of the EA is on file with the at the Bluff Creek Interconnect, and
FERC Online links at http:// Commission and is available for public increase the horsepower at the existing
www.ferc.gov. To facilitate electronic inspection. The EA may also be viewed Chatfield compressor station.
service, persons with Internet access on the Commission’s Web site at The purpose of the proposed facilities
who will eFile a document and/or be http://www.ferc.gov using the is to enable Northern to provide a 675-
listed as a contact for an intervenor ‘‘eLibrary’’ link. Enter the docket pounds per square inch gauge operating
must create and validate an number excluding the last three digits in pressure guarantee to Wisconsin Gas
eRegistration account using the the docket number field to access the LLC at the Bluff Creek Interconnect and
eRegistration link. Select the eFiling document. For assistance, contact FERC provide additional horsepower at the
link to log on and submit the Online Support at Chatfield Compressor Station to enable
intervention or protests. FERCOnlineSupport@ferc.gov or toll- Northern to meet firm incremental
Persons unable to file electronically free at 1–866–208–3676, or for TTY, service to Wisconsin Gas LLC on the
should submit an original and 14 copies (202) 502–8659. Tomah Branchline.

VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1
44616 Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices

The EA has been placed in the public intervenor status upon showing good by Calhoun LNG, L.P. and Point
files of the FERC. A limited number of cause by stating that they have a clear Comfort Pipeline Company, L.P.
copies of the EA are available for and direct interest in this proceeding (collectively referred to as Calhoun
distribution and public inspection at: which would not be adequately Point Comfort) in Calhoun and Jackson
Federal Energy Regulatory Commission, represented by any other parties. You do Counties, Texas.1 These facilities would
Public Reference Room, 888 First Street, not need intervenor status to have your consist of a liquefied natural gas (LNG)
NE., Room 2A, Washington, DC 20426, comments considered. import terminal and storage facilities,
(202) 502–8371. Additional information about the and 27 miles of 36-inch-diameter
Copies of the EA have been mailed to project is available from the pipeline. This EIS will be used by the
federal, state and local agencies, public Commission’s Office of External Affairs, Commission in its decision-making
interest groups, interested individuals, at 1–866–208–FERC or on the FERC process to determine whether the
and parties to this proceeding. Internet Web site (http://www.ferc.gov) project is in the public convenience and
Any person wishing to comment on using the eLibrary link. Click on the necessity. Please note that the scoping
the EA may do so. To ensure eLibrary link, click on ‘‘General Search’’ period will close on August 8, 2005.
consideration prior to a Commission and enter the docket number excluding Comments may be submitted in
decision on the proposal, it is important the last three digits in the Docket written form or presented verbally at the
that we receive your comments before Number field. Be sure you have selected public meetings detailed below. Further
the date specified below. Please an appropriate date range. For details on how to submit written
carefully follow these instructions to assistance, please contact FERC Online comments are provided in the public
ensure that your comments are received Support at FercOnlineSupport@ferc.gov participation section of this notice. In
in time and properly recorded: or toll free at 1–866–208–3676, or for lieu of sending written comments, you
• Send an original and two copies of TTY, contact (202) 502–8659. The are invited to attend the public scoping
your comments to: Secretary, Federal eLibrary link also provides access to the meeting scheduled as follows:
Energy Regulatory Commission, 888 texts of formal documents issued by the
First St., NE., Room 1A, Washington, DC Commission, such as orders, notices, July 26, 2005, 7 p.m. (cst), Bauer
20426; and rulemakings. Community Center, 2300 N. Highway
• Label one copy of the comments for In addition, the Commission now 35, Port Lavaca, Texas 77979.
the attention of the (Gas Branch 2), offers a free service called eSubscription Telephone: (361) 552–1234.
PJ11.2. which allows you to keep track of all The public scoping meeting is
• Reference Docket No. CP05–49– formal issuances and submittals in designed to provide state and local
000; and specific dockets. This can reduce the agencies, interested groups, affected
• Mail your comments so that they amount of time you spend researching landowners, and the general public with
will be received in Washington, DC on proceedings by automatically providing more detailed information and another
or before August 8, 2005. you with notification of these filings, opportunity to offer your comments on
Please note that we are continuing to document summaries and direct links to the proposed project. Interested groups
experience delays in mail deliveries the documents. Go to http:// and individuals are encouraged to
from the U.S. Postal Service. As a result, www.ferc.gov/esubscribenow.htm. attend the meeting and to present
we will include all comments that we comments on the environmental issues
receive within a reasonable time frame Magalie R. Salas, they believe should be addressed in the
in our environmental analysis of this Secretary. EIS. A transcript of the meeting will be
project. However, the Commission [FR Doc. 05–15382 Filed 8–2–05; 8:45 am] made so that your comments will be
strongly encourages electronic filing of BILLING CODE 6717–01–U accurately recorded.
any comments or interventions or Also on July 26 2005, starting at 8
protests to this proceeding. See 18 CFR a.m., we will be conducting a visit to the
385.2001(a)(1)(iii) and the instructions DEPARTMENT OF ENERGY
proposed LNG terminal site and
on the Commission’s Web site at pipeline route. Anyone interested in
http://www.ferc.gov under the ‘‘e- Federal Energy Regulatory
Commission participating in the site visit should
Filing’’ link and the link to the User’s meet at the Days Inn Port Lavaca at 2100
Guide. Before you can file comments [Docket Nos. CP05–91–000 and CP05–380– N. Hwy, Port Lavaca, Texas 77979
you will need to create a free account 000] (phone number: 361–552–4511).
which can be created by clicking on Participants must provide their own
‘‘Sign-up.’’ Calhoun LNG, L.P. and Point Comfort
transportation. For additional
Comments will be considered by the Pipeline Company, L.P.; Notice of
information, please contact the
Commission but will not serve to make Intent To Prepare an Environmental
Commission’s Office of External Affairs
the commentor a party to the Impact Statement for the Proposed
at 1–866–208–FERC (3372).
proceeding. Any person seeking to Calhoun LNG Terminal and Pipeline
become a party to the proceeding must Project, Request for Comments on This notice is being sent to affected
file a motion to intervene pursuant to Environmental Issues, and Notice of landowners; federal, state, and local
Rule 214 of the Commission’s Rules of Public Scoping Meetings and Site Visit government representatives and
Practice and Procedures (18 CFR agencies; environmental and public
July 7, 2005. interest groups; Native American tribes;
385.214).1 Only intervenors have the
The staff of the Federal Energy local libraries and newspapers; and
right to seek rehearing of the
Regulatory Commission (FERC or
Commission’s decision.
Commission) will prepare an 1 On March 8, 2005, Calhoun LNG, L.P. filed its
Affected landowners and parties with
environmental impact statement (EIS) application with the Commission under Section
environmental concerns may be granted 3(a) of the Natural Gas Act (NGA) and part 153 of
that will discuss the environmental
the Commission’s regulations. On June 10, 2005
1 Interventions may also be filed electronically via impacts of the Calhoun LNG Terminal Point Comfort Pipeline Company, L.P. filed its
the Internet in lieu of paper. See the previous and Pipeline Project involving application under Section 7 of the NGA and Parts
discussion on filing comments electronically. construction and operation of facilities 157 and 284 of the Commission’s regulations.

VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1

Anda mungkin juga menyukai