Anda di halaman 1dari 2

43862 Federal Register / Vol. 70, No.

145 / Friday, July 29, 2005 / Notices

DEPARTMENT OF THE INTERIOR measures it may find necessary to avoid, small hydropower diversion dams and
reduce or mitigate any significant construction of new fish screens/ladders
Bureau of Reclamation adverse project effects. on another three dams, with
ADDRESSES: Requests for a compact disk modification of several hydropower
DEPARTMENT OF ENERGY or a bound copy of the Final EIS/EIR facilities to ensure continued
should be addressed to Ms. Rosemary hydropower operations. The Final EIS/
Federal Energy Regulatory Stefani, Bureau of Reclamation, 2800 EIR addresses the impacts of project
Commission Cottage Way, Sacramento, CA 95825, construction and operation on fisheries;
telephone: (916) 978–5309, TDD (916) botanical, wetland and wildlife
Battle Creek Salmon and Steelhead 978–5608, or e-mail: resources; hydrology; water quality;
Restoration Project, Tehama and rstefani@mp.usbr.gov. The final EIS/EIR groundwater; land use; geology and
Shasta Counties, CA is available online at http:// soils; aesthetics and visual resources;
AGENCIES: Bureau of Reclamation, www.usbr.gov/mp/battlecreek/ transportation; noise; air quality; public
Interior; Federal Energy Regulatory documents.html. health and safety; public services and
Commission, DOE. FOR FURTHER INFORMATION CONTACT: Ms. utilities; recreation; cultural resources;
ACTION: Notice of availability of the Mary Marshall, Bureau of Reclamation, power generation and economics;
Final Environmental Impact Statement/ 2800 Cottage Way, Sacramento, CA socioeconomics; environmental justice;
Environmental Impact Report. 95825, telephone: (916) 978–5248, TDD and Indian trust assets.
(916) 978–5608, e-mail: The Notice of Availability of the
SUMMARY: Pursuant to section 102(2)(c) mmarshall@mp.usbr.gov; or Mr. Jim original joint Draft Environmental
of the National Environmental Policy Canaday, California State Water Impact Statement/Environmental
Act of 1969 (NEPA) and Public Resources Control Board, 1001 I Street, Impact Report (Draft EIS/EIR), notice of
Resources Code, sections 21000–21177 Sacramento, CA 95814, telephone: (916) public workshop, and notice of public
of the California Environmental Quality 341–5308, e-mail: hearing was published in the Federal
Act (CEQA), the Bureau of Reclamation jcanaday@waterboards.ca.gov. Register on July 18, 2003. Two public
(Reclamation), the lead Federal agency; information workshops and a public
SUPPLEMENTARY INFORMATION: The
the Federal Energy Regulatory hearing were held on July 23 and
proposed Restoration Project is to August 12, and August 27, 2003,
Commission (FERC), a cooperating
restore approximately 48 miles of respectively; all meetings occurred in
Federal agency; and the California State
salmonid habitat in Battle Creek and its Manton, CA. A Draft Supplemental EIS/
Water Resources Control Board (State
tributaries and to facilitate the safe Revised EIR (Draft SEIS/REIR) was
Water Board), the lead State agency; passage for, and the growth and
have prepared a joint Final released on March 1, 2005 for a 60-day
recovery of, naturally-produced public review and comment period.
Environmental Impact Statement/ anadromous fish populations, including
Environmental Impact Report (Final Responses to all comments received
three federally-listed runs: the Central
EIS/EIR) for the Battle Creek Salmon from interested organizations and
Valley spring-run chinook salmon, the
and Steelhead Restoration Project individuals on the Draft EIS/EIR and the
Central Valley steelhead trout, and the
(Restoration Project). The Restoration Draft SEIS/REIR during the public
Sacramento River winter-run chinook
Project proposed action considered by review periods and at the public hearing
salmon. The Restoration Project’s
the lead agencies is the five-dam are addressed in the Final EIS/EIR.
proposed action (five-dam removal Copies of the Final EIS/EIR are
removal alternative that includes the alternative) stems from the 1999
decommissioning and removal of five available at the following locations:
Memorandum of Understanding (MOU) • Tehama County Library, 645
small hydropower diversion dams, to pursue a restoration project for Battle
construction of new fish screens at the Madison, Red Bluff, CA 96080, (530)
Creek that modifies both Battle Creek 527–0604
intakes and fish ladders at three other Hydroelectric Project facilities and
dams, and the modification of several • Shasta County Library, 1855 Shasta
water management operations, while at Street, Redding, CA 96001, (530) 225–
hydropower facilities to ensure the same time minimizing loss of
continued hydropower operations. This 5769
renewable energy produced. The MOU • Susanville Library, Lassen County,
action will require a FERC license is signed by Reclamation, the U.S. Fish 1618 Main Street, Susanville, CA 96130,
amendment of the Battle Creek and Wildlife Service, National Marine (530) 251–8127
Hydroelectric Project, owned and Fisheries Service, the California • Bureau of Reclamation, Red Bluff
operated by Pacific Gas and Electric Department of Fish and Game, and Field Office, 22500 Altube Avenue, Red
Company (PG&E). PG&E. Bluff, CA 96080, (530) 529–3890
DATES: No decision will be made on the The Restoration Project Final EIS/EIR • Bureau of Reclamation, Office of
proposed action until 30 days after the discusses the project purpose and need, Public Affairs, 2800 Cottage Way,
release of the Final EIS/EIR. After the project description, project background, Sacramento, CA 95825–1898, (916) 978–
30-day waiting period, Reclamation and and related projects. The Final EIS/EIR 5100
the State Water Board will complete evaluates a ‘‘No Action’’ alternative and • Bureau of Reclamation, Denver
their respective Record of Decision several action alternatives, which Office Library, Building 67, Room 167,
(ROD) and CEQA Findings. The ROD consist of various combinations of dam Denver Federal Center, 6th and Kipling,
and CEQA Findings will identify the decommissioning and removals, fish Denver, CO 80225, (303) 445–2072
recommended action to be implemented screen/fish ladder improvements, and • Natural Resources Library, U.S.
including any measures found necessary increased in-stream flows, and also Department of the Interior, 1849 C Street
to avoid, reduce or mitigate any describes the affected environment and NW., Main Interior Building,
significant adverse project effects to less environmental consequences of the Washington, DC 20240–0001
than significant. FERC will then make Restoration Project alternatives. The • California State Water Resources
its own independent decision regarding proposed action (five-dam removal Control Board, Division of Water Rights,
the proposed Battle Creek Hydroelectric alternative) combines the 1001 I Street, 14th Floor, Sacramento,
Project license amendment and any decommissioning and removal of five CA 95814, (916) 341–5300

VerDate jul<14>2003 17:05 Jul 28, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\29JYN1.SGM 29JYN1
Federal Register / Vol. 70, No. 145 / Friday, July 29, 2005 / Notices 43863

Dated: May 19, 2005. For further information, contact Clearing Price. To aid in this discussion,
Kirk C. Rodgers, Rebecca Martin at (202) 502–6012. Staff requests ISO–NE to use the
Regional Director, Mid-Pacific Region, Bureau hypothetical example described in the
Magalie R. Salas,
of Reclamation. Appendix to this Notice to illustrate
Secretary.
Dated: May 16, 2005. how Resources would be selected to
[FR Doc. E5–4032 Filed 7–28–05; 8:45 am] provide Regulation Service and how the
Joseph D. Morgan, BILLING CODE 6717–01–P Regulation Clearing Price would be
Director, Division of Hydropower determined. ISO–NE should also be
Administration and Compliance, Federal
Energy Regulatory Commission.
prepared to explain whether, under its
DEPARTMENT OF ENERGY proposal, the Resources selected to
[FR Doc. 05–15013 Filed 7–28–05; 8:45 am]
Federal Energy Regulatory provide Regulation Service would be
BILLING CODE 4310–MN–P
Commission those whose total costs of providing
Regulation Service are the lowest. In
[Docket No. ER05–795–001] addition, ISO–NE should be prepared to
DEPARTMENT OF ENERGY discuss the rationale for recalculating
ISO New England Inc. and New updated Regulation Rank Prices for
Federal Energy Regulatory England Power Pool; Notice of
Commission generating units with Regulation Offer
Technical Conference Prices that are less than the initial
July 22, 2005. Regulation Clearing Price, as described
[Project No. 2105–095] in section 3.2.5(2) of the proposed
The Federal Energy Regulatory
Commission hereby gives notice that revision to Manual M–11.
Pacific Gas & Electric Company; The conference is open for the public
Notice of Availability of Environmental members of its staff will hold a
technical conference with ISO New to attend. In addition, a telephone line
Assessment will be provided for interested parties to
England Inc. (ISO–NE) to discuss certain
July 21, 2005. aspects of the ‘‘Joint Request for call in and participate in the conference.
Clarification, or in the Alternative, Below is the call-in information for the
In accordance with the National conference call:
Environmental Policy Act of 1969 and Rehearing; Request for Expedited
Action; and Request for Deferral of Date: July 28, 2005.
the Federal Energy Regulatory Time: 8:30 a.m. to 9:30 a.m. e.d.t.
Commission’s (Commission) Filing Requirements of ISO New
Toll-free Number: 877–546–1566.
regulations, 18 CFR Part 380 (Order No. England Inc. and New England Power Passcode: 65271.
486, 52 FR 47897), the Office of Energy Pool’’ (Joint Request) filed on June 23, Leader’s Name: Mr. David Mead.
Projects’ staff has prepared an 2005 in Docket No. ER05–795–001. Parties interested in submitting
The conference will take place on comments following the conference
Environmental Assessment (EA) for an
Thursday, July 28, 2005 from 8:30 a.m. must do so no later than August 11,
application for a non-capacity related
to 9:30 a.m. (e.d.t.), in Room 3M–3 of 2005.
amendment of the Lake Almanor
the Federal Energy Regulatory FERC conferences are accessible
Development of the Upper North Fork
Commission, 888 First St., NE., under section 508 of the Rehabilitation
Feather River Project. The Upper North
Washington DC 20426. Act of 1973. For accessibility
Fork Feather River Project, FERC No.
Specifically, the purpose of the accommodations please send an e-mail
2105, is located on the Butt Creek and
conference is to discuss the mechanism to accessibility@ferc.gov or call toll free
North Fork Feather River in Plumas
for selecting generating units to provide 1–866–208–3372 (voice) or 202–208–
County, California.
Regulation Service as proposed in an 1659 (TTY), or send a FAX to 202–208–
The EA contains the staff’s analysis of April 7 filing, and how Regulation 2106 with the required
the potential environmental impacts of Clearing Prices would be established. accommodations.
the proposal and concludes that The conference will also discuss any For more information about the
approval of the proposal would not possible inconsistencies in the conference, please contact: David Mead
constitute a major federal action description of the mechanism as found at (202) 502–8028 or
significantly affecting the quality of the in (i) the proposed Tariff revisions david.mead@ferc.gov.
human environment. (especially section III.1.11.5 and section
A copy of the EA is attached to a July III.3.2.2), (ii) the Joint Request,1 and (iii) Magalie R. Salas,
20, 2005, Commission order titled the proposed revisions to the ISO–NE Secretary.
‘‘Order Approving Application for Manual for Market Operations, Manual Appendix
Amendment of License and Revised M–11 (Revision XX—ASM Phase I),
Exhibit K,’’ which is available for section 3 (especially section 3.2.5).2 The following is a hypothetical example to
During the conference, ISO–NE be used during the technical conference to
review and reproduction at the help illustrate how Resources would be
Commission’s Public Reference Room, should be prepared to explain the
selected to provide Regulation Service and
located at 888 First Street, NE., Room proposed steps that would be taken to how the Regulation Clearing Price would be
2A, Washington, DC 20426. The EA may select generators to provide Regulation determined.
also be viewed on the Commission’s Service and to determine the Regulation Assume that 150 MW of Regulation
website at http://www.ferc.gov using the Capability must be procured to provide
1 The Joint Request (at 6–7) describes a 7-step
‘‘elibrary’’ link. Enter the docket number Regulation Service for a particular hour.
process for determining the Resources that would Assume that 6 different Resources, A through
(prefaced by P-) and excluding the last be selected to provide Regulation Service and for
three digits, in the docket number field F, have submitted offers to provide
determining the Regulation Clearing Price.
Regulation Service. Each of the 6 Resources
to access the document. For assistance, 2 The ISO–NE Manual for Market Operations has
has an Automatic Response Rate of 10 MW
contact FERC Online Support at not been filed with the Commission. It may be
found on the ISO–NE Web site at http://www.iso- per minute, and thus, a Regulation Capability
FERCOnlineSupport@ferc.gov or toll- ne.com/rules_proceds/isone_mnls/M– of 50 MW (i.e., 10 MW per minute times 5
free at (866) 208–3676, or for TTY, 11_Market%20Operations_(Revision%20XX)_10– minutes). Although each Resource has
contact (202) 502–8659. 01–05.doc. submitted a different Energy Bid (shown in

VerDate jul<14>2003 17:05 Jul 28, 2005 Jkt 205001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\29JYN1.SGM 29JYN1

Anda mungkin juga menyukai