Anda di halaman 1dari 3

Federal Register / Vol. 70, No.

140 / Friday, July 22, 2005 / Notices 42377

identity, as allowable by law. If you Project Act of 1939 and the rules and time limits set forth in the advance
request that we withhold your name regulations published in 52 FR 11954, public notices.
and/or address, state your request April 13, 1987 (43 CFR 426.22), 5. All written comments received and
prominently at the beginning of your Reclamation will publish notice of testimony presented at any public
comment. However, we will not proposed or amendatory contract hearings will be reviewed and
consider anonymous comments. We actions for any contract for the delivery summarized by the appropriate regional
will make all submissions from of project water for authorized uses in office for use by the contract approving
organizations or businesses, and from newspapers of general circulation in the authority.
individuals identifying themselves as affected area at least 60 days prior to 6. Copies of specific proposed
representatives or officials of contract execution. Announcements contracts may be obtained from the
organizations or businesses, available may be in the form of news releases, appropriate regional director or his
for public inspection in their entirety. legal notices, official letters, designated public contact as they
MMS Information Collection memorandums, or other forms of become available for review and
Clearance Officer: Arlene Bajusz (202) written material. Meetings, workshops, comment.
208–7744. and/or hearings may also be used, as 7. In the event modifications are made
Dated: July 14, 2005. appropriate, to provide local publicity. in the form of a proposed contract, the
Richard Adamski, The public participation procedures do appropriate regional director shall
not apply to proposed contracts for the determine whether republication of the
Acting Associate Director for Minerals
Revenue Management. sale of surplus or interim irrigation notice and/or extension of the comment
water for a term of 1 year or less. Either period is necessary.
[FR Doc. 05–14528 Filed 7–21–05; 8:45 am]
of the contracting parties may invite the Factors considered in making such a
BILLING CODE 4310–MR–P
public to observe contract proceedings. determination shall include, but are not
All public participation procedures will limited to (i) the significance of the
DEPARTMENT OF THE INTERIOR be coordinated with those involved in modification, and (ii) the degree of
complying with the National public interest which has been
Bureau of Reclamation Environmental Policy Act. Pursuant to expressed over the course of the
the ‘‘Final Revised Public Participation negotiations. At a minimum, the
Quarterly Status Report of Water Procedures’’ for water resource-related regional director shall furnish revised
Service, Repayment, and Other Water- contract negotiations, published in 47 contracts to all parties who requested
Related Contract Negotiations FR 7763, February 22, 1982, a tabulation the contract in response to the initial
is provided of all proposed contractual public notice.
AGENCY: Bureau of Reclamation, The March 10, 2005, notice should be
Interior. actions in each of the five Reclamation
regions. When contract negotiations are used as a reference point to identify
ACTION: Notice. changes. The numbering system in this
completed, and prior to execution, each
SUMMARY: Notice is hereby given of proposed contract form must be notice corresponds with the numbering
contractual actions that have been approved by the Secretary of the system in the March 10, 2005, notice.
proposed to the Bureau of Reclamation Interior, or pursuant to delegated or Definitions of Abbreviations Used in This
(Reclamation) and are new, modified, redelegated authority, the Commissioner Document
discontinued, or completed since the of Reclamation or one of the regional BCP—Boulder Canyon Project
last publication of this notice on April directors. In some instances, Reclamation—Bureau of Reclamation
19, 2005. This notice is one of a variety congressional review and approval of a CAP—Central Arizona Project
of means used to inform the public report, water rate, or other terms and CVP—Central Valley Project
about proposed contractual actions for CRSP—Colorado River Storage Project
conditions of the contract may be
capital recovery and management of FR—Federal Register
involved. IDD—Irrigation and Drainage District
project resources and facilities Public participation in and receipt of ID—Irrigation District
consistent with section 9(f) of the comments on contract proposals will be M&I—Municipal and Industrial
Reclamation Project Act of 1939. facilitated by adherence to the following NMISC—New Mexico Interstate Stream
Additional announcements of procedures: Commission
individual contract actions may be 1. Only persons authorized to act on O&M—Operation and Maintenance
published in the Federal Register and in behalf of the contracting entities may P–SMBP—Pick-Sloan Missouri Basin
newspapers of general circulation in the Program
negotiate the terms and conditions of a PPR—Present Perfected Right
areas determined by Reclamation to be specific contract proposal. SOD—Safety of Dams
affected by the proposed action. 2. Advance notice of meetings or SRPA—Small Reclamation Projects Act of
ADDRESSES: The identity of the hearings will be furnished to those 1956
approving officer and other information parties that have made a timely written WD—Water District
pertaining to a specific contract request for such notice to the Pacific Northwest Region: Bureau of
proposal may be obtained by calling or appropriate regional or project office of Reclamation, 1150 North Curtis Road,
writing the appropriate regional office at Reclamation. Suite 100, Boise, Idaho 83706–1234,
the address and telephone number given 3. Written correspondence regarding telephone (208) 378–5344.
for each region in the SUPPLEMENTARY proposed contracts may be made The Pacific Northwest Region has no
INFORMATION section. available to the general public pursuant updates to report for this quarter. Please
FOR FURTHER INFORMATION CONTACT: to the terms and procedures of the refer to the March 10, 2005, publication
Sandra L. Simons, Manager, Contract Freedom of Information Act, as of this notice for current contract
Services Office, Bureau of Reclamation, amended. actions.
P.O. Box 25007, Denver, Colorado 4. Written comments on a proposed Mid-Pacific Region: Bureau of
80225–0007; telephone (303) 445–2902. contract or contract action must be Reclamation, 2800 Cottage Way,
SUPPLEMENTARY INFORMATION: Consistent submitted to the appropriate regional Sacramento, California 95825–1898,
with section 9(f) of the Reclamation officials at the locations and within the telephone (916) 978–5250.

VerDate jul<14>2003 19:28 Jul 21, 2005 Jkt 205001 PO 00000 Frm 00079 Fmt 4703 Sfmt 4703 E:\FR\FM\22JYN1.SGM 22JYN1
42378 Federal Register / Vol. 70, No. 140 / Friday, July 22, 2005 / Notices

New contract actions: Affairs; Delta Division, CVP; California: Creek Reservoir and Ditch Company and
39. Mercy Springs WD, CVP, Renewal of the long-term water service the Collbran Conservancy District have
California: Proposed partial assignment contract for up to 850 acre-feet. Contract requested a nonproject irrigation
of 2,825 acre-feet of Mercy Springs WD’s executed February 28, 2005. Wheeling carriage contract (40-year) to have 3 cfs,
CVP supply to San Luis WD for agreement for conveyance through the not to exceed 1,000 acre-feet annually,
irrigation and M&I use. California State Aqueduct is pending. of their direct flow irrigation water
40. Oro Loma WD, CVP, California: 34. Plain View WD, CVP, California: rights diverted into and delivered
Proposed partial assignment of 4,000 Reorganization and proposed full through the existing Southside Canal, a
acre-feet of Oro Loma WD’s CVP supply contract assignment of Plain View WD’s feature of Collbran Project delivery
to Westlands WD for irrigation and M&I CVP supply to Byron-Bethany ID. structures. Contract was executed on
use. Contract was executed on March 14, May 26, 2005.
41. San Luis WD, CVP, California: 2005. 22. Central Utah Water Conservancy
Proposed partial assignment of 2,400 Lower Colorado Region: Bureau of District, Bonneville Unit, Central Utah
acre-feet of San Luis WD’s CVP supply Reclamation, P.O. Box 61470 (Nevada Project, Utah: Negotiate a repayment
to Santa Nella County WD for M&I use. Highway and Park Street), Boulder City, contract for 60,000 acre-feet per year of
42. Placer County Water Agency, CVP, Nevada 89006–1470, telephone (702) M&I water from the Utah Lake System.
California: Proposed exchange 293–8081. Contract was executed on March 15,
agreement under Section 14 of the Completed contract action: 2005.
Reclamation Project Act of 1939 of up 24. Town of Palisade, Palisade ID,
to 74,000 acre-feet. 41. Golden Shores Water Mesa County ID, Reclamation, and the
Conservation District, BCP, Arizona: U.S. Fish and Wildlife Service; CRSP:
Modified contract actions:
Amend the district’s contract to include The Colorado River is critical habitat for
9. El Dorado ID, CVP, California: the water allocation for Topock Village
Execution of long-term Warren Act four endangered fish species. These
Estates within the district’s boundaries. agencies are entering into an agreement
contracts for conveyance of nonproject Upper Colorado Region: Bureau of
water (one contract for Weber Reservoir for each to provide the following:
Reclamation, 125 South State Street, Reclamation shall provide cost-share
and pre-1914 ‘‘ditch’’ rights in the Room 6107, Salt Lake City, Utah 84138–
amount of 3,344 acre-feet, and one funding for the recovery monitoring and
1102, telephone (801) 524–3864. research, and O&M (October 30, 2000,
contract for Project 184 in the amount
Modified contract actions: 114 Stat. 1602, Pub. L. 106–392); the
of 11,000 acre-feet). The contracts will
6. Sanpete County Water Conservancy districts are willing to allow the U.S.
allow CVP facilities to be used to deliver
District, Narrows Project, Utah: Fish and Wildlife Service and
nonproject water to El Dorado ID for use
Application for a SRPA loan and grant Reclamation to construct the fish
within its service area.
22. City of Vallejo, Solano Project, to construct a dam, reservoir, and passage; and the Town of Palisade
California: Execution of long-term pipeline to annually supply proposes to provide related safety
Warren Act contract for conveyance of approximately 5,000 acre-feet of water features on or near the fish passage.
through a transmountain diversion from Contract was executed on May 3, 2005.
nonproject water. This contract will
upper Gooseberry Creek in the Price 26. Reclamation, U.S. Fish and
allow Solano Project facilities to deliver
River drainage (Colorado River Basin) to Wildlife Service, and the Colorado River
nonproject water to the City of Vallejo Water Conservation District; Recovery
for use within its service area. the San Pitch—Sevier River (Great
Basin). Implementation Program for
23. Sacramento Suburban WD, CVP,
31. Central Utah Project, Utah. Endangered Fish Species in the Upper
California: Execution of long-term
Petition for project water among the Colorado River Basin: Reclamation will
Warren Act contract for conveyance of
United States, the Central Utah Water provide cost-share funding for
nonproject water. This contract will
Conservancy District, and the Duchesne enlargement of Elkhead Reservoir
allow CVP facilities to be used to deliver
(October 30, 2000, 114 Stat. 1602, Pub.
nonproject water provided from the County Water Conservancy District for
L. 106–392) in a separate grant
Placer County Water Agency to the use of 2,500 acre-feet of irrigation water
agreement. Contract was executed on
Sacramento Suburban WD for use from the Bonneville Unit of the Central
February 15, 2005.
within its service area. Utah Project. Great Plains Region: Bureau of
26. San Joaquin Valley National Completed contract actions: Reclamation, P.O. Box 36900, Federal
Cemetery, U.S. Department of Veteran 1.(a) Ron Connell, Aspinall Storage Building, 316 North 26th Street,
Affairs; Delta Division, CVP; California: Unit, CRSP: Mr. Connell has requested Billings, Montana 59107–6900,
Renewal of the long-term water service a 40-year water service contract for 6 telephone (406) 247–7752.
contract for up to 850 acre-feet. Contract acre-feet of water out of Blue Mesa New contract actions:
executed February 28, 2005. Wheeling Reservoir. Mr. Connell has submitted an
agreement for conveyance through the 51. Bostwick ID; Superior-Courtland
augmentation plan to Water District 4, and Franklin Units, Bostwick Division,
California State Aqueduct is pending. Case No. 04CW168. Contract was
31. Delta Lands Reclamation District P–SMBP; Red Cloud, Nebraska: The
executed on February 2, 2005. district requested a deferment of its
No. 770, CVP, California: Long-term
1.(c) Dry West Nursery, Aspinall 2005 construction obligations in
Warren Act contract for conveying
Storage Unit, CRSP: Dry West Nursery accordance with the Act of September
nonproject flood flows.
has requested a 40-year water service 21, 1959.
Discontinued contract Action: contract for 3 acre-feet of water out of 52. Kirwin ID No. 1; Kirwin Unit,
15. Plain View WD, CVP, California: Blue Mesa Reservoir. Dry West Nursery Solomon Division, P–SMBP; Gaylord,
Long-term Warren Act contract for has submitted their augmentation plan Kansas: The district requested a
conveyance of nonproject water in the to Water District 4, Case No. 04CW174. deferment of its 2005 construction
Delta-Mendota Canal. Contract was executed on March 2, obligations in accordance with the Act
Completed contract actions: 2005. of September 21, 1959.
26. San Joaquin Valley National 21. Coon Creek Reservoir and Ditch 53. Webster ID; Webster Unit,
Cemetery, U.S. Department of Veteran Company, Collbran Project: The Coon Solomon Division, P–SMBP; Gaylord,

VerDate jul<14>2003 19:28 Jul 21, 2005 Jkt 205001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\22JYN1.SGM 22JYN1
Federal Register / Vol. 70, No. 140 / Friday, July 22, 2005 / Notices 42379

Kansas: The district requested a new 40-year repayment contract was ADDRESSES: Written comments (no
deferment of its 2005 construction executed on March 4, 2005. emails or faxes) must be addressed to:
obligations in accordance with the Act Dated: June 15, 2005. Mr. Daniel Borunda, Environmental
of September 21, 1959. Roseann Gonzales,
Protection Specialist, Compliance
54. Ainsworth ID; Ainsworth Unit, Section, USIBWC, 4171 North Mesa
Director, Office of Program and Policy
Sandhills Division, P–SMBP; Street, C–100, El Paso, Texas 79902. A
Services.
Ainsworth, Nebraska: Contract renewal copy of the FSEIS is available at
[FR Doc. 05–14488 Filed 7–21–05; 8:45 am]
for a long-term water service contract. http://www.ibwc.state.gov and in local
55. Pueblo West Metropolitan District, BILLING CODE 4310–MN–P
public libraries in the San Diego area. A
Fryingpan-Arkansas Project, Colorado: limited number of copies will be
Consideration of a request for a long- available, if you wish to obtain a copy
term contract for the use of excess contact Mr. Daniel Borunda at the
capacity in the Fryingpan-Arkansas INTERNATIONAL BOUNDARY AND
address above.
Project. WATER COMMISSION, UNITED
STATES AND MEXICO FOR FURTHER INFORMATION CONTACT: Mr.
56. Mark H. Allredge, H.S. Properties Daniel Borunda, Environmental
LLC (Individual); Boysen Unit, P– United States Section; Notice of Protection Specialist, USIBWC, at (915)
SMBP; Wyoming: Renewal of long-term Availability (NOA) of the Final 832–4701, by fax at (915) 832–4167, or
water service contract for up to 84 acre- Supplemental Environmental Impact by mail at the above address.
feet of supplemental irrigation water to Statement (FSEIS) for Clean Water Act SUPPLEMENTARY INFORMATION: Pursuant
serve 84 acres. (CWA) compliance at the South Bay
57. Western Heart River ID, P–SMBP, to Section 102(2)(c) of the National
International Wastewater Treatment Environmental Policy Act of 1969, as
North Dakota: Amend existing power
Plant (SBIWTP), San Diego County, CA amended, the USIBWC has analyzed the
contract to allow for the installation of
an additional pump site and to provide impacts of alternatives for the SBIWTP
AGENCY: United States Section, to achieve compliance with the CWA
project use power to that site. International Boundary and Water and its NPDES permit. This action is
Modified contract actions: Commission (USIBWC). needed because the SBIWTP currently
46. Buford-Trenton ID, Buford- ACTION: Notice of availability. operates and discharges only at the
Trenton Project, North Dakota: Amend advanced primary level and cannot
existing power contract to provide for SUMMARY: This announces the
meet all the requirements of the CWA
increase in project use pumping power availability of the FSEIS that assesses and its NPDES permit, including
rate of delivery and enter new the potential environmental impacts of secondary treatment requirements.
repayment and power contract for the construction and operation of a This DSEIS also evaluated new
additional project use pumping power range of treatment and disposal information on the current discharges of
for project purposes in irrigating bench alternatives for the SBIWTP to achieve advanced primary effluent from the
lands existing within the district. compliance with the CWA and the SBIWTP through the SBOO, as well as
47. East Bench ID; East Bench Unit, requirements contained in its National potential treatment and disposal options
P–SMBP; Montana: The district Pollutant Discharge Elimination System in Mexico, to achieve compliance with
requested a deferment of its 2005 (NPDES) permit. Situated in the United the CWA and its NPDES permit.
construction obligation. A request is States at the United States/Mexico The No Action Alternative and six
being prepared to amend Contract No. border, the SBIWTP treats sewage flows action alternatives were evaluated in the
14–06–600–3593 to defer payments in originating from the City of Tijuana, DSEIS. The six action alternatives were
accordance with the Act of September Mexico and the surrounding region and developed in a manner that would
21, 1959. discharges the treated effluent into the enable wastewater flows to be treated in
49. Frenchman Valley ID; Frenchman Pacific Ocean through an ocean outfall. compliance with the CWA and the
Unit, Frenchman-Cambridge Division, In December 2004, the USIBWC SBIWTP NPDES permit. Formulation of
P–SMBP; Culbertson, Nebraska: The published a Draft SEIS (DSEIS) for this the alternatives was the result of a
district requested a deferment of its action which considered existing and process that included public
2005 construction obligation in new alternatives that would enable the consultation involving the public,
accordance with the Act of September USIBWC to bring the SBIWTP into regulatory agencies and environmental
21, 1959. compliance with the CWA and the organizations.
50. Kansas-Bostwick ID No. 2; requirements contained in its NPDES This DSEIS evaluated the following
Courtland Unit, Bostwick Division, P– permit and to evaluate new information seven alternatives:
SMBP; Courtland, Kansas: The district on the current discharges of advanced 1. Alternative 1: No Action (Continue
requested a deferment of its 2005 primary effluent from the SBIWTP operation of SBIWTP as Advanced
construction obligations in accordance through the South Bay Ocean Outfall Primary Facility).
with the Act of September 21, 1959. (SBOO), as well as potential interim • Option A: With No Future
Completed contract actions: actions that would continue operations Improvements to Mexico’s Existing
12. Western Heart River ID; Heart of the SBIWTP until the SBIWTP Conveyance Facilities.
Butte Unit, P–SMBP; North Dakota: achieves CWA compliance. The United • Option B: With Future
Negotiation of water service contract to States Environmental Protection Agency Improvements to Mexico’s Existing
continue delivery of project water to the (USEPA), Region 9, San Francisco, Conveyance Facilities.
district. A new 40-year water service California, is a Cooperating Agency for 2. Alternative 2: Operate SBIWTP as
contract was executed on May 2, 2005. this action. Advanced Primary Facility With
15. Morkrid Enterprises, Inc.; Lower DATES: Written comments are requested Treated Flows Conveyed To Mexico for
Marias Unit, P–SMBP; Montana: by August 24, 2005. The public Discharge.
Initiating a long-term contract for up to comment period of the FSEIS will end 3. Alternative 3: Operate SBIWTP
3,751 acre-feet of storage water from 30 days after publication of the NOA in with City of San Diego Connections
Tiber Reservoir to irrigate 1,875 acres. A the Federal Register. (Interim Alternative Only).

VerDate jul<14>2003 19:28 Jul 21, 2005 Jkt 205001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\22JYN1.SGM 22JYN1

Anda mungkin juga menyukai