InstallationofSecantSoilMixPilesWall
Using
WETSPEEDMIXING(WSM)Technique
WhatisWSM Technique?
WSMTechniqueusecombinationofjetgrouting&MechanicalMixingBladestomix
thesoil.
ProventechniqueabletotreatmosttypesofsoilinsingaporerangingfromverySoft
marineclay,Peatyclay,F1,F2,siltysand,clayeysand,CoarsesandandBukitTimah
graniteSoilGV&GVIuntilSPTNvalue<100N,exceptrock&obstruction.
UseHighRevolution(RPM:40~90)forSoilmixing
Assuredqualitywithuniformmixingandconsistentdiameter(rangingfrom0.6mto
2.6m).GroundImprovementMin.Shearstrength(Cu)=300Kpato1500Kpa
Provendeepesttreatmentdepth48m.
Environmentallyfriendly.
Lownoiseandvibrationfree
HighProductivityanduselessmanpower
Costeffective
SequenceofInstallation
SetupGuideWall&WSM
installationinProgress
InstallationofIBeamimmediately
uponcompletionofWSM
TYPE(1)WSM(WITHOUTSIDENOZZLESJETTING)
I-Beam
Ground Level
Sand Layer
Rock Layer
Step 1:
Position the
ABI rig on
the WSM
peg point
Step 2 :
Drilling and
mixing of WSM
column in the
ground with
cement
Step 3 :
Withdraw the WSM
rod and mixing
monitor to complete
the grouting
Step 4 :
Completed WSM
point
Step 5 :
Install I-Beam to
required depth
TYPE(2)WSM(WITHSIDENOZZLESJETTING)))
I-Beam
Ground Level
Jetting
Sand Layer
Jetting
Step 1:
Position the
drill rig on
the WSM peg
point
Step 2 :
Drilling and mixing
WSM column in the
ground with cement
Step 3 :
Withdraw the WSM
rod and mixing
monitor to complete
the grouting
Step 4 :
Completed
WSM point
Step 5 :
Install I-Beam to
required depth
AdvantageofusingWSMMethodfor
ERSS
Proven WSM Free Standing Wall
for One Basement construction
Part One
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
BeforetrimmingSecantSoilmix
Piles. (FREEstandingwall3.5m~4.0mheight)
AftertrimmingSecantSoilMix
Piles.
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
AftertrimmingSecantSoilMix
piles
CastinsituPermanentretaining
wallwithSecantSoilMixPiles.
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
FreeStandingWallusingWSM
technique(reclaimsand&marine
claylayers)
FreeStandingWallusingWSM
technique(reclaimsand&marine
Claylayers)
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
FreeStandingWallusingWSM
technique(BukitTimahGraniteGV
&GVISoil)
FreeStandingWallusingWSM
technique(BukitTimahGraniteGV
&GVISoil)
AdvantageusingWSMMethodfor
ERSS
TOPDOWNBASEMENTCONSTRUCTION
METHODUSINGSECANTSOILMIXPILE
WALLSYSTEM
(PARTTWO)
WetSpeedMixing(WSM)
Technique
Guidewallforsecantsoilmixpiles
installation
SoilMixinginProgress
WetSpeedMixing(WSM)Technique
InstallationofHpileimmediatelyafter
completionofwsm
Preparationofcappingbeamslabfortop
downconstruction
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
SecantsoilmixPileswall
beforetrimming
Secantsoilmixpileswallafter
trimmingatbasementlevel
one
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Basementlevelone
Openingatlevelone
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Topdownconstruction
Basementleveloneslabcast
ExposedWSMgroundimprovement
atbasementleveltwo
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Trimmedsecantsoilmixwall
atbasementleveltwo
TrimmedandexposedIbeam
atbasementleveltwo
Earthretainingstructuresystem(ERSS)
(Max.excavationdepth:14to18mforBasementConstruction)
SecantSoilMixPileWallwithmulti
layersstrut(DTL1 C906)
ConnerSecantSoilMixPilesWallwith
multilayersstrut(DTL1 C906)
Earthretainingstructuresystem(ERSS)
(Max.excavationdepth:12mforBasementConstruction)
DTL1C907(ERSSWallabove
existingMRTNSLtunnel)
DTL1C907(ERSSWallabove
existingMRTNSLtunnel)
RealtimeMonitoring DataLoggerattached.
Drilling Depth
Grout Pressure
Grout Flow rate
Rotation Speed
Grout Volume
For every meter
depth
CastDate
TCR%
1000
5738
150
1017
100
4703
2629
3383
1059
4439
5520
6163
5745
400
436
680
608
548
717
1225
1131
3341
4397
4472
418
605
350
4458
2433
450
487
3178
421
CR1
C139
23/10/2012
4/1/2013
7/1/2013
C113
24/10/2012
8/1/2013
12/1/2013
C76
29/10/2012
10/1/2013
12/1/2013
C53
1/11/2012
15/1/2013
19/1/2013
CR1
CR2
CR3
96
C34
31/10/2012
17/1/2013
19/1/2013
CR1
CR2
CR3
95
Before Test
ElasticModulus,
E(Mpa)
85
1
CR2
CR3
CR1
CR2
CR3
CR1
CR2
CR3
UnconfinedComp.
Strength,qu(kPa)
94
99
After Test
ZHAOYANGGEOTECHNICPTELTD
PROJECT
WORKSCOPE
MAINCONTRACTOR
DTL 1 C 902
DTL 1 C 906
DTL 1 C 907
Taisei Corporation
DTL 2 C 916
DTL 2 C 917
DTL 2 C 918
Ground Improvement Work using WSM ( Cut & Cover tunnel &
TBM launch & arrival Shaft)
DTL 2 C 919
DTL 2 C 921
DTL 3 C 927
CMC Ravenna
DTL 3 C 932
DTL 3 C 935
Leighton-John Holland JV
MCE C 482
Ground Improvement Work using WSM ( Cut & Cover tunnel &
Pipe Piles Gap Sealing )
MCE C 483
MCE C 487
PROJECT
WORKSCOPE
MAINCONTRACTOR
OWNER
Punggol Waterway
(Part 1)
HDB
Sunhuan Construction PL
HDB
Sunhuan Construction PL
HDB
Sunhuan Construction PL
HDB
Kallang Whampoa
Contract 20C
Punggol East Contract 36
Sembawang E & C PL
HDB
Sunhuan Construction PL
HDB
Jardin Condominium
Rich Construction PL
Private
Expand Construction PL
Private
Rich Construction PL
Private
Private
Lorong 33 Geylang
Admin Construction PL
Private
Centropod at 80 Changi
Road
Private
Natura @ Hillview
Private
NUS Project
Expand Construction PL
Private
HDB @ Sembawang Rd
N5C18
HDB
THANK YOU