Anda di halaman 1dari 2

Federal Register / Vol. 70, No.

135 / Friday, July 15, 2005 / Notices 41005

certainty and Commission assurance notifications of changes in reporting sediment, water and air quality impacts,
that good faith reporting will not subject status within 15 days of the date of such the indirect and cumulative impacts of
a company to the risk of sanctions.23 So changes. We also waive the 15 day growth, and environmental justice
long as a data provider has adopted and requirement for any market participants issues; and believes that a decision on
is following the standards of the Policy that have changed their reporting status whether the project is intended to
Statement for reporting entities, we will but failed to notify us of that fact. Such accommodate short or long-term
apply the safe harbor policy, even if the market participants may file transportation needs should be made
company is not specifically subject to notifications of any changes since their before a preferred alternative is
the Market Behavior Rules. initial notification no later than August identified. Rating EC2.
1, 2005. EIS No. 20050127, ERP No. D–AFS–
Requirement to Notify the Commission F65055–MI, Hiawatha National Forest,
of Changes in Price Reporting Status The Commission Orders Proposed Land and Resource
19. In Behavior Rule 4 and its (A) The Policy Statement on Natural Management Plan, Forest Plan Revision,
counterpart in Order No. 644, we Gas and Electric Price Indices is Implementation, Alger, Cheboygan,
required that all sellers subject to the clarified as discussed in the body of this Chippewa, Delta, Luce and Mackinac
rule notify the Commission within 15 order. Counties, MI.
days of the effective date of the rule (B) The requirement to file Summary: EPA has no objections to
whether the seller reports its notifications of changes in reporting the proposed action. Rating LO.
transactions in accordance with the status within 15 days of the date of the EIS No. 20050136, ERP No. D–AFS–
Policy Statement. Additionally, we change is waived until August 1, 2005, J67932–CO, Dry Fork Federal Coal
required that sellers update their for any market-based rate sellers or Lease-by-Application (COC–67232),
notifications within 15 days of any blanket certificate holders who file Leasing Additional Federal Coal Lands
change in their reporting status.24 We notifications for any changes in status for Underground Coal Resource,
directed market-based rate sellers to file that have occurred since their initial Special-Use-Permits and U.S. Army
their notifications in Docket No. EL01– notification. COE section 404 Permit, Grand Mesa,
118 and the docket in which they Uncompahgre and Gunnison National
By the Commission.
received market-based rate authority; we Forests, Gunnison County, CO.
directed blanket certificate holders to Linda Mitry, Summary: EPA expressed concerns
file their notifications in Docket No. Deputy Secretary. regarding reducing impacts from roads
RM03–10.25 [FR Doc. 05–13910 Filed 7–14–05; 8:45 am] to habitat, soil erosion and maintaining
20. We received initial notifications BILLING CODE 6717–01–P a buffer between the mining area and
by or on behalf of 756 market the West Elk wilderness area. EPA also
participants in December 2003 and expressed concerns about potential
January 2004. Since then, we have ENVIRONMENTAL PROTECTION wetland impacts caused by mine
received only 26 notifications in Docket AGENCY subsidence. Rating EC2.
No. EL01–118 of subsequent changes in EIS No. 20050174, ERP No. D–FHW–
reporting status from market-based rate [ER–FRL–6665–4]
J40170–CO, I–25, Valley Highway
sellers and 24 notifications in Docket Environmental Impact Statements and Project, Transportation Improvement
No. RM03–10 from blanket certificate Regulations; Availability of EPA from Logan to U.S. 6, Denver County,
holders. In several cases a company CO.
Comments
filed the same notification in both Summary: EPA has environmental
dockets; in other cases the same Availability of EPA comments concerns about the proposed project
company filed more than one prepared pursuant to the Environmental related to the lack of improvements to
notification in a docket. During this Review Process (ERP), under section pedestrian access to commercial areas,
period, however, price index developers 309 of the Clean Air Act and section the compatibility of ramp and arterial
have reported increases in both the 102(2)(c) of the National Environmental improvements with multimodal
number of transactions being reported Policy Act, as amended. Requests for transportation development, and bicycle
and in the number of market copies of EPA comments can be directed and pedestrian safety at intersections.
participants reporting trade data to to the Office of Federal Activities at EPA also recommends improvements to
them.26 It is possible that some market 202–564–7167. An explanation of the the air quality analysis. Rating EC2.
participants have overlooked the ratings assigned to draft environmental EIS No. 20050175, ERP No. D–FHW–
requirement to notify the Commission of impact statements (EISs) was published K40258–CA, Campus Parkway Project,
changes in their reporting status. in the Federal Register dated April 1, Proposes to Construct a New
21. Accordingly, we hereby remind all 2005 (70 FR 16815). Expressway from Mission Avenue
market-based rate sellers subject to the Interchange and Yosemite Avenue/Lake
Market Behavior Rules, and all blanket Draft EISs
Road, U.S. Army COE Section 404
certificate holders subject to Order No. EIS No. 20040554, ERP No. D–FHW– Permit, City of Merced, Merced County,
644, of their obligation to file J40169–CO, Programmatic—I–70 CA.
Mountain Corridor Tier 1 Project, from Summary: EPA has environmental
23 104 FERC ¶ 61,121 at PP 30–31. Glenwood Springs and C–470 Proposes concerns about the proposed project
24 105 FERC ¶ 61,218 at P 116; see also 18 CFR to Increase Capacity, Improve regarding logical termini, alternatives,
284.288(b) and 284.403(b).
25 Order Clarifying Prior Notice, 105 FERC ¶
Accessibility and Mobility, and connected actions, air quality,
61,277 at P 11 (2003). Decrease Congestion, Colorado, cumulative impacts to waters of the
26 NGI comments at 2. NGI notes that the volume Garfield, Eagle, Summit, Clear Creek U.S., and growth-inducing impacts. EPA
of natural gas bidweek trades reported to it has and Jefferson Counties, CO. recommends that FHWA clearly explain
increased from 7.9 Bcf to 21.2 Bcf in June 2005, and Summary: EPA expressed the traffic benefits of the project. Rating
that the number of trades has increased from 1,357
to 3,069. Id. at 2. See also 109 FERC ¶ 61,184 at PP
environmental concerns about the EC2.
5–7; Comments of Platts, Docket Nos. PL03–3, et al. proposed project regarding road deicers, EIS No. 20050181, ERP No. D–FHW–
June 14, 2004. the long-term fate and transport of D40184–MO, MO–34, Corridor

VerDate jul<14>2003 17:47 Jul 14, 2005 Jkt 205001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\15JYN1.SGM 15JYN1
41006 Federal Register / Vol. 70, No. 135 / Friday, July 15, 2005 / Notices

Improvements, from intersection of US assumptions made for air quality 564–7167 or http://www.epa.gov/
Routes 60/21 in Carter County to the modeling for coal usage and the long- compliance/nepa/.
intersection of Routes 34/72 in Cape term projections of air quality impacts Weekly receipt of Environmental Impact
Girardeau County, Funding, U.S. Army that were not in concert with the Statements
COE Section 404 Permit, Carter, expected life of the rail project or the Filed 07/04/2005 through 07/08/2005
Bollinger, Reynolds, Wayne, and Cape potential production life of Powder Pursuant to 40 CFR 1506.9.
Girardeau Counties, MO. River Basin coal in eastern Wyoming. EIS No. 20050283, Final EIS, AFS, NV,
Summary: EPA has environmental Rating EC1. Martin Basin Rangeland Project,
concerns about the proposed project Authorize Continued Livestock
related to impacts to streams and 4(f) Final EISs
Grazing in Eight Allotments: Martin
resources. EPA is also concerned about EIS No. 20050108, ERP No. F–FTA–
Basin, Indian, West Side Flat Creek,
the uncertainty of potential issues that J54001–UT, Weber County to Salt Lake
Buffalo, Bradshaw, Buttermilk,
could arise between now and the City Commuter Rail Project, Proposes a
Granite Peak and Rebel Creek Cattle
projected construction start date, Commuter Rail Transit Service with
and Horse Allotments, Humboldt-
estimated to be at least 10 years. Rating Nine Stations between Salt Lake City
Toiyabe National Forest, Santa Rosa
EC2. and Peasant View, Funding, Weber,
Ranger District, Humboldt County,
EIS No. 20050182, ERP No. D–FRC– Davis and Salt Lake Counties, UT.
Summary: EPA continues to have NV, Wait Period Ends: 08/15/2005,
J03018–00, Piceance Basin Expansion Contact: Jose Noriega (775) 623–5025,
Project, Construction and Operation of a concerns about wetland mitigation and
air quality impacts. EIS No. 20050153, Ext. 115.
New Interstate Natural Gas Pipeline EIS No. 20050284, Final EIS, BOP, WV,
System, Wamsutter Compressor Station ERP No. F–FHW–J40160–UT, Southern
Corridor Construction, I–15 at Reference Southern West Virginia Proposed
to Interconnections Greasewood Federal Correctional Institution, Four
Compressor Station, Rio Blanco County Post 2 in St. George to UT–9 near
Hurricane, Funding, Right-of-Way Grant Alternatives Sites in Southern West
CO and Sweetwater County, WY. Virginia, Boone County, Mingo
Summary: EPA expressed and U.S. Army COE Section 404 Permit
Issuance, St. George, Washington and County, Nicholas County, and
environmental concerns about water
Hurricane, Washington County, UT. McDowell County, WV, Wait Period
and air quality impacts and the need to
Summary: EPA has no objections to Ends: 08/15/2005, Contact: Pamela J.
assess impacts from several connected
the proposed project. EIS No. 20050214, Chandler (202) 514–6470.
and induced actions. Rating EC2.
EIS No. 20050189, ERP No. D–COE– ERP No. F–AFS–J65430–MT, McSutten EIS No. 20050285, Final Supplement,
D36075–PA, The Town of Bloomsburg, Decision Area, Implementation of COE, PA, Wyoming Valley Levee
Columbia County, Pennsylvania Flood Harvest and Associated Activities, Raising Project, Design Modification
Damage Reduction Project, Prescribed Burning, and Road and Recreational Enhancements,
Implementation, Integrated Feasibility Management, Kootenai National Forest, Wilkes-Barre, Pennsylvania River
Report, Susquhanna River and Fishing Rexford Ranger District, Lincoln Commons, Susquehanna River,
Creek, Town of Bloomsburg, Columbia County, MT. Luzerne County, PA, Wait Period
County, PA. Summary: EPA supports the proposed Ends: 08/15/2005, Contact: Jo Ann
Summary: EPA expressed project; however, expressed Grundy (410) 962–6136.
environmental concern about wetland environmental concerns about potential EIS No. 20050286, Final EIS, SFW, ME,
and proposed wetland mitigation and impacts to water quality, adequate Maine Coastal Islands National
roadway relocation impacts; and funding to implement road BMP Wildlife Refuge (formerly Petit Manan
suggested minimization measures that upgrades and maintenance, and road National Wildlife Refuge Complex)
would reduce project impacts. Rating decommissioning. Comprehensive Conservation Plan,
EC2. EIS No. 20050223, ERP No. F–FHW– Implementation, the Gulf of Maine,
EIS No. 20050197, ERP No. D–TVA– J40168–UT, 11400 South Project, Wait Period Ends: 08/15/2005,
E65073–TN, Watts Bar Reservoir Land Proposed Improvement to the Contact: Nancy McGarigal (413) 253–
Management Plan, Update 1988 Plan to Transportation Network in the Southern 8562.
Reflect Changing Community Needs, Salt Lake Valley from 12300/12600 EIS No. 20050287, Final EIS, BLM, OR,
Loudon, Meigs, Rhea and Roane South to 10400/10600 South, and from Provolt Seed Orchard Integrated Pest
Counties, TN. Bangerter Highway to 700 East, Salt Management (IPM) Program,
Summary: EPA expressed Lake City Salt Lake County, UT. Implementation, Grants Pass, Medford
environmental concern related to Summary: No formal comment letter District, Jackson and Josephine
impacts associated with the was sent to the preparing agency. Counties, OR and Charles A. Sprague
development/recreation alternative. Robert W. Hargrove, Seed Orchard Integrated Pest
Rating EC1. Director, NEPA Compliance Division, Office Management Program (IMP),
EIS No. 20050163, ERP No. DS–STB– of Federal Activities. Implementation, Merlin, Medford
J53005–00, Powder River Basin [FR Doc. 05–13972 Filed 7–14–05; 8:45 am] District, Josephine County, OR, Wait
Expansion Project, New Information on Period Ends: 08/15/2005, Contact:
BILLING CODE 6560–50–P
SEA’s Independent Analyses Four Grodon LyFord (541) 618–2401.
Issues Remanded by the ‘‘8’’ Circuit EIS No. 20050288, Final EIS, BLM, OR,
Court of Appeals, Finance Docket No. ENVIRONMENTAL PROTECTION Walter H. Horning Seed Orchard
33407—Dakota, Minnesota, Eastern AGENCY Integrated Pest Management Program
Railroad, SD, WY and MN. (IPMO), Implementation, Colton,
Summary: EPA expressed [ER–FRL–6665–3] Salem District, Clackamas County,
environmental concern about apparent OR, Wait Period Ends: 08/15/2005,
Environmental Impacts Statements;
contradictions between statements in Contact: Terry Garren (503) 630–6888.
Notice of Availability
the Final Environmental Impact EIS No. 20050289, Final EIS, BLM, OR,
Statement and the Draft Supplemental Responsible Agency: Office of Federal Travis Tyrrell Seed Orchard
EIS. EPA is also concerned that the Activities, General Information (202) Integrated Pest Management (IPM)

VerDate jul<14>2003 17:47 Jul 14, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\15JYN1.SGM 15JYN1

Anda mungkin juga menyukai