Anda di halaman 1dari 24

Asian Region Mechanical Design

Masanobu Miyahara /KEK


Atsushi Enomoto /KEK
Masahito Huse /Nikken Sekkei

2012/3/21

ILC Mechanical & Electrical Review

Content
Cooling Water System
HVAC System
Plumbing System
Summary
2012/3/21

ILC Mechanical & Electrical Review

Asian Region Mechanical Design


Scheme Change Image
Previous Scheme
by DRFS

Latest Scheme

2012/3/21

ILC Mechanical & Electrical Review

Asian Region Mechanical Design


New Scheme Kamaboko Tunnel
Cooling Warter
pipe

Chw pipe
Fan Coil Unit

Groundwater Drainage Ditch


2012/3/21

ILC Mechanical & Electrical Review

Cooling Water System


Heat Load

Cooling Water Load

C ooling W ater Load


AH2
AH1
LC W
Source eSource e+
DR
R TM L
ML
BDS
D um ps
IR (D H )
subTotal
C ryogenics
Total

Summary

AH3

AH4

P M C -0

PM B -0

(M W )
AH5

P XB -0

AH6

AH7

AH8

2.88
5.53
11.86
2.93
5.59

2.09

0.33
5.59

5.59

5.59

0.33

5.03
4.60

0
0
0

8.52

5.59

5.59

7.37
21.48

5.59

5.03

7.37
18.55

10.46
7.96
23.45

4.65

5.59

4.65

5.59

5.59

5.59

5.59

5.59

2.93
5.59

4.60

11.86
2.52
14.38

2.09
2.09

39.95
0.20
40.15
1.73
41.88

7.81
7.96
20.42

7.37
18.55

7.37
21.48

8.52

0.00
0.00
0.00

AH5

AH6

AH7

AH8

Total
2.88
5.53
13.95
6.51
54.42
9.20
39.95
0.20
132.64
49.65

182.29

Air + CHw Load


A ir+C hw
Source eSource e+
DR
R TM L
ML
BDS
D um ps
IR (D H )
subTotal
Total

AH2

AH1

AH3

AH4

P M C -0

PM B -0

P XB -0
1.42

0.72
0.74
0.95
1.20

0.13

0.11
1.20

1.20

1.20

0.11

1.08
0.62

0
0

2.15

1.20
3.35

2012/3/21

1.20

1.20
2.40

1.08

1.44
2.52

1.00

1.20

1.00

1.20

1.20

1.20

1.20

1.20

0.95
1.20

0.62

0.74
0.74

0.13
0.13

0.00
0.38
0.38
0.38

2.14
3.14

ILC Mechanical & Electrical Review

2.40

2.15

Total
1.42
0.72
0.87
2.10
11.69
1.23
0.00
0.38

0.00
0.00

18.41

Total 200MW

200.7

3.35

Cooling Water System


3 Types of Cooling Tower
A: Closed-circuit Type (Air-cooled)
B: Closed-circuit Type (Water cooled)
C: Open Type (Water cooled)
- IN RDR, we adopted Air-cooled type Cooling tower
- Makeup water Issue in Mountainous area

2012/3/21

ILC Mechanical & Electrical Review

Cooling Water System


3 Types of Cooling Tower
Makeup water for 200MW cooling
- WE (Evaporation)=288m3/h
- WC (Carry over) =47m3/h
- WB (Blow down) =241m3/h

Total
=WE+WC+WB
=576m3/h

Reservation of Makeup water


Groundwater
=1m3/km/min*30km*60min/h
=1,800m3/h
2012/3/21

ILC Mechanical & Electrical Review

Cooling Water System


Comparison of Cooling Tower Type
A
TYP E

C losed-circuit A ir-cooled Type C losed-circuit C ooling Tow er

C
O pen Type C ooling Tow er

U N IT SIZE

59m 10m

22m 4m

12m 4m

14,160m 2

5,870m 2

3,200m 2

95dB (A )

80dB (A )

75dB (A )

9,330M \

1,810M \

370M \

(6M W U N IT)

SPAC E
(for 200M W )

N O IS E
(6M W U N IT)

U N IT C O ST
(for 200M W )

RDR Scheme
2012/3/21

TDR Scheme
ILC Mechanical & Electrical Review

Cooling Water System


2-Loop & 3-Loop System
2-Loop System
1st Loop

CT

3-Loop System
CT

To separate the
100m=1MPa
water pressure to
the 2nd Loop
H EX

2nd Loop
Galvanized steel
Piping

H EX

RF

RF

RF

RF

H EX

RF

2nd Loop
3rd Loop

D.I. Water Stainless steel


Piping

RF

2 -L O O P S Y S T E M
2012/3/21

RF

RF

D.I. Water Stainless


steel Piping
3 -L O O P S Y S T E M

ILC Mechanical & Electrical Review

RF

Cooling Water System


Comparison of 2-Loop and 3-Loop

Cost

2-Loop System

3-Loop System

3,423M\

2,943M\

(AH-3)
Water leakage

Evaluation
2012/3/21

If there would be some


troubleat the thin pipe
around accelerator, 5km(total
650m3) de ionized cooling
water would be run over.

ILC Mechanical & Electrical Review

10

Cooling Water System


3-Loop LCW System (AH-3)

From ground
level to
access hall

Stand-by (back-up)

De-ionize filter

L1000m
H
100m

2012/3/21

De-aerator

ILC Mechanical & Electrical Review

11

Cooling Water System


3-Loop Chw System
In case of AH-3(5km)
Turbo Refrigerator
2+1(standby)

2nd-Loop
3rd-Loop

2012/3/21

ILC Mechanical & Electrical Review

12

Cooling Water System


Inverter turbo refrigerator

COP at the midterm =up to 20.0

COP (Coefficiency Of Performance) the


rating point =7.0
2012/3/21

ILC Mechanical & Electrical Review

13

HVAC System
Tunnel Ventilation System in RDR

Its difficult to make Chevron


We need to change the scheme
2012/3/21

ILC Mechanical & Electrical Review

14

HVAC System
Tunnel Ventilation System
Exhaust Fan

Sloped tunnel
About 1,000m

2012/3/21

Air Handling Unit

D2m

ILC Mechanical & Electrical Review

15

HVAC System
Tunnel Ventilation System
Exhaust Fan

Outside air
Heated or Cooled by
Air-handling Unit

Air Handling Unit

Exhaust

2012/3/21

ILC Mechanical & Electrical


Review

16

HVAC System
Tunnel Ventilation System
Exhaust Fan

Helium Quench !!

Air Handling Unit

Quench
exhaust

2012/3/21

Fire !!

Smoke
exhaust

ILC Mechanical & Electrical


Review

17

HVAC System
Tunnel Ventilation Rate
High velocity (>1.0m/s)
cause vibration !

Velocity < 0.5 m/s

Beam Tunnel
Service Tunnel
0.5m/s16m23600
0.5m/s12m23600

=28,800m3/h

=21,600m3/h

28,800m3/h(16m25000m)
=0.36N/h

2012/3/21

ILC Mechanical & Electrical Review

18

HVAC System
Typical Tunnel Section Plan
Chw PIPE
LCW PIPE

Fan Coil Unit

6000

4402
1098

400

Maintenance
space

5500

3rd Loop Cooling Water Skid

Mesh grounding
1500
3300

3500

4200

11000
11600

2012/3/21

12000
ILC Mechanical
& Electrical
Review

19

Plumbing System
Drainage System

Ground water :
Cooling water leakage :
to the DP tank for RI monitoring
2012/3/21

Amount of Springwater
1t/km.Min. 30t/min.
43,000t/day

ILC Mechanical & Electrical Review

20

Plumbing System
Water Supply and Drainage System

Drainage System
Leaked cooling water is
pumped up to access hall

Ground water is running


through the ditch
2012/3/21

ILC Mechanical & Electrical Review

21

Plumbing System
Water Supply and Drainage System
Source of Makeup water is ground water

Source of potable water is city water

Water Supply System

2012/3/21

ILC Mechanical & Electrical Review

22

Asian Region Mechanical Design


Summary (1)
Cooling Water System
- Use the open type Cooling Tower System
- Use 3-Loop System (t=11)
- Inverter Turbo Refrigerator is used to make CHW
HVAC System
- Air Ventilation is through the Duct in Access tunnel
- Ventilation in ML tunnel is Duct-less, 0.5m/s Velocity
- Fire Smoke is extracted to the surface through AH,AT.
2012/3/21

ILC Mechanical & Electrical Review

23

Asian Region Mechanical Design


Summary (2)
Plumbing System (water supply)
- City water is used for the potable water.
- Groundwater is used for the makeup water of CT.
Drainage System
- Groundwater is flow down to the Access Hall through
the Drainage ditch under the Service Tunnel.
- Leaked Cooling Water to the DP tank for RI Monitoring
We need more detailed study by the time next meeting in Korea
2012/3/21

ILC Mechanical & Electrical Review

24

Anda mungkin juga menyukai