Anda di halaman 1dari 1

13226 Federal Register / Vol. 70, No.

52 / Friday, March 18, 2005 / Notices

Approval Procedures for Parts notice is hereby given that the Federal action is taken. Comments received after
Manufacturer Approval of Critical Railroad Administration (FRA) received that date will be considered as far as
Engine and Propeller Parts. a request for a waiver of compliance practicable. All written communications
DATES: The FAA issued policy statement with certain requirements of its safety concerning these proceedings are
number ANE–2004–33.4–4 on March 4, standards. The individual petition is available for examination during regular
2005. described below, including the party business hours (9 a.m.–5 p.m.) at the
FOR FURTHER INFORMATION CONTACT:
seeking relief, the regulatory provisions above facility. All documents in the
Karen M. Grant, FAA, Engine and involved, the nature of the relief being public docket are also available for
Propeller Standards Staff, ANE–110, 12 requested, and the petitioner’s inspection and copying on the Internet
New England Executive Park, arguments in favor of relief. at the docket facility’s Web site at
Burlington, MA 01803; e-mail: http://dms.dot.gov.
Metro North Railroad (MNCW) Anyone is able to search the
karen.m.grant@faa.gov; telephone: (781)
(Docket Number FRA–2005–20314) electronic form of all comments
238–7119; fax: (781) 238–7199. The
The Metro North Railroad (MNCW) received into any of our dockets by the
policy statement is available on the
seeks a waiver of compliance from name of the individual submitting the
Internet at the following address:
docket number, FRA–2005–20314, with comment (or signing the comment, if
http:.//www.airweb.faa.gov/rgl. If you do
the Passenger Equipment Safety submitted on behalf of an association,
not have access to the Internet, you may
Standards, 49 CFR part 238, section business, labor union, etc.). You may
request a copy of the policy by
309(b) periodic brake equipment review DOT’s complete Privacy Act
contacting the individual listed in this
maintenance, as it pertains to scheduled Statement in the Federal Register
section.
1,104 day clean, repair, and test published on April 11, 2000 (Volume
SUPPLEMENTARY INFORMATION: The FAA 65, Number 70; Pages 19477–78). The
published a notice in the Federal intervals for a MU locomotive that is
part of a fleet that is 100% equipped Statement may also be found at http://
Register on November 8, 2004 (69 FR dms.dot.gov.
64805) to announce the availability of with air driers and also equipped with
the proposed policy and invite one of the approved brake systems, RT– Issued in Washington, DC on March 14,
5A. MNCW is requesting permission to 2005.
interested parties to comment.
We have filed in the docket all extend the 1,104 day intervals by 184 Grady C. Cothen, Jr.,
comments we received, as well as a days for 144 M1–A MU rail cars. MNCW Deputy Associate Administrator for Safety
report summarizing each substantive explains in their request that the M1–A Standards and Program Development.
public contact with FAA personnel cars were slated for retirement prior to [FR Doc. 05–5364 Filed 3–17–05; 8:45 am]
concerning this policy. The docket is coming due for the 1,104 day BILLING CODE 4910–06–P
available for public inspection. If you maintenance but because they are not
wish to review the docket in person, go receiving new M7 cars on time, they are
to the above address between 9 a.m. and unable to do this. DEPARTMENT OF TRANSPORTATION
5 p.m.. Monday through Friday, except As part of the request, the railroad
will perform a 368 day inspection, Federal Railroad Administration
Federal holidays.
which will include the same
Background Petition for Waiver of Compliance
maintenance and overhaul to the M1–A
This policy memorandum provides air compressor and air quality system as In accordance with Part 211 of Title
guidance to Aircraft Certification Offices required as part of the 1104 day 49 Code of Federal Regulations (CFR),
when establishing their process for maintenance. Also, at this time, they notice is hereby given that the Federal
evaluating Parts Manufacturer Approval will renew the emergency brake valve Railroad Administration (FRA) received
(PMA) applications for critical engine portion, the J–1 Relay valve, and the a request for a waiver of compliance
and propeller parts. This policy also electro-pneumatic emergency valve, and with certain requirements of its safety
requires applicants to complete a safety perform a single car test, to assure the standards. The individual petition is
assessment and to consider a emergency brake functions as intended. described below, including the party
continuous operational safety plan for Interested parties are invited to seeking relief, the regulatory provisions
all engine and propeller PMA proposed participate in these proceedings by involved, the nature of the relief being
parts. submitting written views, data, or requested, and the petitioner’s
comments. FRA does not anticipate arguments in favor of relief.
Authority: 49 U.S.C. 106(g), 40113, 44701,
scheduling a public hearing in
44702, 44704. Norfolk Southern Corporation
connection with these proceedings since
Issued in Burlington, Massachusetts, on the facts do not appear to warrant a (Waiver Petition Docket Number FRA–2005–
March 4, 2005. hearing. If any interested party desires 20384)
Jay J. Pardee, an opportunity for oral comment, they The Norfolk Southern Corporation
Manager, Engine and Propeller Directorate, should notify FRA, in writing, before (NS) seeks a waiver of compliance for
Aircraft Certification Service. the end of the comment period and locomotives assigned to operate over the
[FR Doc. 05–5340 Filed 3–17–05; 8:45 am] specify the basis for their request. hump yard retarders at its Bellevue, OH,
BILLING CODE 4910–13–M All communications concerning these and Roanoke, VA, yards, from the
proceedings should identify the requirements of the Locomotive Safety
appropriate docket number (FRA–2005– Standards, 49 CFR 229.123, which
DEPARTMENT OF TRANSPORTATION 20314) and must be submitted to the requires each lead locomotive be
Docket Clerk, DOT Docket Management equipped with an end plate, pilot plate,
Federal Railroad Administration Facility, Room PL–401 (Plaza Level), or snow plow, that extends across both
Petition for Waiver of Compliance 400 7th Street, SW., Washington, DC rails at a maximum clearance of six
20590. Communications received within inches. NS indicates that due to the
In accordance with part 211 of title 49 45 days of the date of this notice will height of the retarders, it is not
Code of Federal Regulations (CFR), be considered by FRA before final uncommon for locomotive pilots or

VerDate jul<14>2003 16:14 Mar 17, 2005 Jkt 205001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\18MRN1.SGM 18MRN1

Anda mungkin juga menyukai