Anda di halaman 1dari 2

Federal Register / Vol. 70, No.

48 / Monday, March 14, 2005 / Notices 12473

may be filed electronically via the comment date for the particular DATES: Additional comments may be
Internet in lieu of paper; see 18 CFR application. submitted on or before April 13, 2005.
385.2001(a)(1)(iii) and the instructions n. Filing and Service of Responsive ADDRESSES: Submit your comments,
on the Commission’s Web site under the Documents—Any filings must bear in referencing docket ID number OECA–
‘‘e-Filing’’ link. The Commission all capital letters the title 2004–0039, to (1) EPA online using
strongly encourages electronic filings. ‘‘COMMENTS’’, ‘‘PROTEST’’, or EDOCKET (our preferred method), by e-
Please include the Project Number on ‘‘MOTION TO INTERVENE’’, as mail to docket.oeca@epa.gov, or by mail
any comments or motions filed. applicable, and the Project Number of to: Environmental Protection Agency,
The Commission’s Rules of Practice the particular application to which the EPA Docket Center (EPA/DC),
and Procedure require all intervenors filing refers. Any of the above-named Enforcement and Compliance Docket
filing a document with the Commission documents must be filed by providing and Information Center, Mail Code
to serve a copy of that document on the original and eight copies to: The 2201T, 1200 Pennsylvania Avenue,
each person in the official service list Secretary, Federal Energy Regulatory NW., Washington, DC 20460, and (2)
for the project. Further, if an intervenor Commission, 888 First Street, NE., OMB at: Office of Information and
files comments or documents with the Washington, DC 20426. A copy of any Regulatory Affairs, Office of
Commission relating to the merits of an motion to intervene must also be served Management and Budget (OMB),
issue that may affect the responsibilities upon each representative of the Attention: Desk Officer for EPA, 725
of a particular resource agency, they Applicants specified in the particular 17th Street, NW., Washington, DC
must also serve a copy of the documents application. 20503.
on that resource agency. o. Agency Comments—Federal, State, FOR FURTHER INFORMATION CONTACT:
j. Description of Application: The and local agencies are invited to file
Applicants seek Commission approval Learia Williams, Compliance
comments on the described application. Assessment and Media Programs
to modify the identity of co-licensee A copy of the application may be
General Electric Credit Corporation Division, Office of Compliance, (Mail
obtained by agencies directly from the Code 2223A), Environmental Protection
(GECC), now known as General Electric Applicants. If an agency does not file
Capital Corporation, to the Eldred L. Agency, 1200 Pennsylvania Avenue,
comments within the time specified for NW., Washington, DC 20460; telephone
Field Hydroelectric Facility Trust, as filing comments, it will be presumed to
had been envisioned when a sale- number: (202) 564–4113; fax number:
have no comments. One copy of an (202) 564–0050; e-mail address:
leaseback transaction was consummated agency’s comments must also be sent to
pursuant to the Commission’s Order williams.learia@epa.gov.
the Applicants’ representatives.
Approving Transfer of License issued on SUPPLEMENTARY INFORMATION: EPA has
December 15, 1983. The Trust was Magalie R. Salas, submitted the following ICR to OMB for
formed pursuant to the Amended and Secretary. review and approval according to the
Restated Trust Agreement between [FR Doc. E5–1054 Filed 3–11–05; 8:45 am] procedures prescribed in 5 CFR 1320.12.
GECC and United States Trust Company BILLING CODE 6717–01–P
On September 14, 2004 (69 FR 55430),
of New York dated December 1, 1985. EPA sought comments on this ICR
k. This filing is available for review at pursuant to 5 CFR 1320.8(d). EPA
the Commission in the Public Reference received no comments.
Room or may be viewed on the ENVIRONMENTAL PROTECTION EPA has established a public docket
Commission’s Web site at http:// AGENCY for this ICR under Docket ID No. OECA–
www.ferc.gov using the ‘‘eLibrary’’ link. 2004–0039, which is available for public
[OECA–2004–0039; FRL–7883–3]
Enter the docket number (P–2790) in the viewing at the Enforcement and
docket number field to access the Agency Information Collection Compliance Docket and Information
document. For assistance, call toll-free Activities; Submission for OMB Review Center in the EPA Docket Center (EPA/
1–866–208–3676 or e-mail and Approval; Comment Request; DC), EPA West, Room B102, 1301
FERCOnlineSupport@ferc.gov. For TTY, NESHAP for Primary Copper Smelters, Constitution Avenue, NW., Washington,
call (202) 502–8659. A copy is also ICR Number 1850.04, OMB Number DC. The EPA Docket Center Public
available for inspection and 2060–0476 (Renewal) Reading Room is open from 8:30 a.m. to
reproduction at the addresses in item g. 4:30 p.m., Monday through Friday,
above. AGENCY: Environmental Protection excluding legal holidays. The telephone
l. Individuals desiring to be included Agency (EPA). number for the Reading Room is (202)
on the Commission’s mailing list should ACTION: Notice. 566–1744, and the telephone number for
so indicate by writing to the Secretary the Enforcement and Compliance
of the Commission. SUMMARY: In compliance with the Docket and Information Center Docket
m. Comments, Protests, or Motions to Paperwork Reduction Act, this is: (202) 566–1752. An electronic
Intervene—Anyone may submit document announces that an version of the public docket is available
comments, a protest, or a motion to Information Collection Request (ICR) through EPA Dockets (EDOCKET) at
intervene in accordance with the has been forwarded to the Office of http://www.epa.gov/edocket. Use
requirements of Rules of Practice and Management and Budget (OMB) for EDOCKET to submit or view public
Procedure, 18 CFR 385.210, .211, .214. review and approval. This is a request comments, access the index listing of
In determining the appropriate action to to renew an existing approved the contents of the public docket, and to
take, the Commission will consider all collection. This ICR is scheduled to access those documents in the public
protests or other comments filed, but expire on May 31, 2005. Under OMB docket that are available electronically.
only those who file a motion to regulations, the Agency may continue to When in the system, select ‘‘search,’’
intervene in accordance with the conduct or sponsor the collection of then key in the docket ID number
Commission’s Rules may become a information while this submission is identified above.
party to the proceeding. Any comments, pending at OMB. This ICR describes the Any comments related to this ICR
protests, or motions to intervene must nature of the information collection and should be submitted to EPA and OMB
be received on or before the specified its estimated burden and cost. within 30 days of this notice. EPA’s

VerDate jul<14>2003 15:31 Mar 11, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1
12474 Federal Register / Vol. 70, No. 48 / Monday, March 14, 2005 / Notices

policy is that public comments, whether and maintain on site two site-specific Respondents/Affected Entities:
submitted electronically or in paper, operating plans: (1) A startup, Owners or operators of primary copper
will be made available for public shutdown, malfunction plan, and (2) a smelters.
viewing in EDOCKET as EPA receives fugitive dust control plan. Records and Estimated Number of Respondents: 3.
them and without change, unless the reports will be required to be retained Frequency of Response: Initially,
comment contains copyrighted material, for a total of five years, two years at the monthly, semiannually and annually.
Confidential Business Information (CBI), site, and the remaining three years at an Estimated Total Annual Hour Burden:
or other information whose public off-site location. 8,837 hours.
disclosure is restricted by statute. When Notifications are used to inform the Estimated Total Annual Costs:
EPA identifies a comment containing Agency or delegated authority when a $564,848, which includes $0 annualized
copyrighted material, EPA will provide source becomes subject to the standard. capital/startup costs, $8,000 annual
a reference to that material in the The reviewing authority may then O&M costs, and $556,848 annual labor
version of the comment that is placed in inspect the source to check if the costs.
EDOCKET. The entire printed comment, pollution control devices are properly Changes in the Estimates: There is a
including the copyrighted material, will installed and operated, and the standard decrease of 11,669 hours in the total
be available in the public docket. is being met. Performance test reports estimated burden currently identified in
Although identified as an item in the the OMB Inventory of Approved ICR
are needed as these are the Agency’s
official docket, information claimed as Burdens. The decrease in burden from
records of a source’s initial capability to
CBI, or whose disclosure is otherwise the most recently approved ICR is due
comply with the emission standards,
restricted by statute, is not included in to a decrease in the number of sources.
and serve as a record of the operating
the official public docket, and will not Our data indicates that there are
conditions under which compliance
be available for public viewing in approximately three sources subject to
was achieved. The information
EDOCKET. For further information the rule, as compared to the active ICR
generated by monitoring, recordkeeping
about the electronic docket, see EPA’s that shows six sources. There are no
and reporting requirements described in
Federal Register notice describing the new facilities expected to be
this ICR is used by the Agency to ensure
electronic docket at 67 FR 38102 (May constructed in the next three years. The
31, 2002), or go to http://www.epa.gov/ that facilities affected by the standard
continue to operate the control decline in the number of sources was
edocket. partially due to corporate mergers,
Title: NESHAP for Primary Copper equipment and achieve continuous
compliance with the regulation. coupled with power disruptions and
Smelters (40 CFR Part 63, Subpart QQQ) high energy costs which resulted in loss
(Renewal). All reports are sent to the delegated of production and plant closure.
Abstract: The National Emission state or local authority. In the event that The annual reporting and
Standards for Hazardous Air Pollutants there is no such delegated authority, the recordkeeping cost burden is reduced
(NESHAP), for Primary Copper Smelters reports are sent directly to the EPA from $98,000 to $8,000. In the initial
were proposed on April 20, 1998 (63 FR regional office. rule related ICR, respondents were
19582), and June 26, 2000 (65 FR 39326) An agency may not conduct or required to install monitoring
respectively. These standards apply to sponsor, and a person is not required to equipment. For this ICR, all of the
any existing, reconstructed, or new respond to, a collection of information monitoring equipment has been
primary copper smelters. The affected unless it displays a currently valid OMB installed and only O&M costs remain.
sources are each copper concentrate Control Number. The OMB Control
dryer, each smelting furnace, each slag Dated: March 1, 2005.
Numbers for EPA’s regulations are listed Oscar Morales,
cleaning vessel, each copper converter in 40 CFR part 9 and 48 CFR chapter 15,
department, and the entire group of Director, Collection Strategies Division.
and are identified on the form and/or
fugitive emission sources. Affected [FR Doc. 05–4900 Filed 3–11–05; 8:45 am]
instrument, if applicable.
owners and operators are required to BILLING CODE 6560–50–P
meet specific monitoring, Burden Statement: The annual public
recordkeeping, and reporting reporting and recordkeeping burden for
requirements in order to demonstrate this collection of information is ENVIRONMENTAL PROTECTION
initial and continuous compliance with estimated to average 196 hours per AGENCY
the rule. A primary copper smelter is response. Burden means the total time,
effort, or financial resources expended [OW–2003–0019, FRL–7883–8]
only subject to the regulation if it is a
major source of hazardous air pollutant by persons to generate, maintain, retain,
Agency Information Collection
(HAP) emitting or has the potential to or disclose or provide information to or
Activities: Proposed Collection;
emit any single HAP at the rate of 10 for a Federal agency. This includes the
Comment Request; Clean Watersheds
tons or more per year or any time needed to review instructions;
Needs Survey (CWNS), EPA ICR
combination of HAP at the rate of 25 develop, acquire, install, and utilize
Number 0318.10, OMB Control Number
tons or more per year. technology and systems for the purposes
2040–0050
Owners and operators must submit of collecting, validating, and verifying
notification reports upon the information, processing and AGENCY: Environmental Protection
construction, reconstruction, or maintaining information, and disclosing Agency (EPA).
modification of any primary copper and providing information; adjust the ACTION: Notice.
smelter. Also, required is a one-time- existing ways to comply with any
only initial notification for new and previously applicable instructions and SUMMARY: In compliance with the
reconstructed sources. The respondents requirements; train personnel to be able Paperwork Reduction Act (44 U.S.C.
are required to submit an annual to respond to a collection of 3501 et seq.), this document announces
performance test for each control information; search data sources; that EPA is planning to submit a
device, and a semiannual summary complete and review the collection of continuing Information Collection
report to EPA. Respondents subject to information; and transmit or otherwise Request (ICR) to the Office of
the final rule are required to prepare disclose the information. Management and Budget (OMB). This is

VerDate jul<14>2003 15:31 Mar 11, 2005 Jkt 205001 PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 E:\FR\FM\14MRN1.SGM 14MRN1

Anda mungkin juga menyukai