ACHIEVEMENTS
Above 3 million people in 39 districts (compared to 30 in 2012) are more
resilient due to local DRR interventions Over 820,000 people (of which 385,000 female) directly benefitted by 249
new schemes (safe drinking water, embankments, cyclone shelters, sanitation,
resilient habitat, etc.);
More than 80,000 people (25,000 female) benefited from short term
employment generated by LDRRF scheme implementation;
245,744 families received livelihood support (e.g. cash for work, training,
adaptive cropping, irrigation facilities, skill based training, etc.);
Construction of 153 km long embankment, saving more than 40,000 hec of
cultivable land;
Reduced water collection time of 36,000 women installation of 300 DTW &
200 RWH;
30,000 women & children benefited from construction of 5,000 hygienic
toilets
Comprehensive Disaster Management Programme (CDMP II)
Ministry of Disaster Management & Relief

LDRRF GOVERNANCE
LDRRF Technical Committee
CDMP Project Manager is the Chair & other Members include, representatives
from DDM, UNDP, Technical Expert & LFMS as Member Secretary.
LDRRF Approval Committee
CDMP NPD is the Chair & other members include: DG, DDM, Deputy ChiefMoDMR, ACD, UNDP, civil society representative & LFMS as Member
Secretary.
LDRRF Project Progress Review Committee
On request of CDMP, the then MoFDM through a notification 19 Sept. 2011
formed a 7 member committee with Joint Secretary (DM) as Chair. On 21 Nov
2013, MoDMR have reformed the Committee with Addl. Secretary (Admin) as
Chair with Addl. Secretary (DM), JS (DM), JS (Relief), Director (KABIKHA) of DDM,
Dy. Chief & Sr. Ast. Chief of MoDMR, representatives from UNDP & CDMP.

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

PROJECT IDENTIFICATION PROCESS


LDRRF Target: 40 Districts
CDMP I identified 16 & CDMP
II added 24 districts based on
vulnerability
Projects for LDRRF support
must have linkage of
CRA/RRAP
Projects under 25 lac are
implemented by UDMC
Projects between 25-50 lac
are implemented by UzDMC
Projects above 50 lac are
implemented by short-listed
NGOs through RFP process

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Identifying
vulnerable
Upazilas

Identifying
most
vulnerable
Unions

Contracts
Signed

Technical
Review and
Approval

Implementati
on cycle
begins

CRA, CRA
revisit or
FTRA

Project
Proposal
Development
(Site Engineers, PIO,
Endorsed by UNO)

MATRIX USED FOR DISTRICT SELECTION

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

LDRRF AT A GLANCE
PRINCIPLES

STATUS AS ON November 13

LDRRF is a pilot, must be

Covered 39 districts, 90

exemplary
Risks as the cornerstone of
interventions
Covering all the targeted districts
Empowering the local
administration
Pursuing quality and
accountability
Timely and systematic

Upazilas and 279 Unions


Completed 947 schemes
Ongoing 1061 schemes
Conducted 258 CRAs/RRAPs &
278 FRTAs(in addition to
644CRAs/RRAPs of Phase I)

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

DETAILS OF PROJECTS
Intervention
Killa Construction/Reconstruction
Embankment Construction/ Reconstruction
Water supply pipeline
Excavation of Pond
Canal re-excavation
Sanitary Latrine
Tube-Well
Rain Water Harvester
Pond Sand filter (PSF)
Pond excavation/re-excavation
Brick Flat Soling (BFS)
Herring Bond Road (HBR)
Cyclone Shelter re-construction
Tree plantation

Parameter Quantity

Earth
Volume
Earth
Volume
Length
No.
No.
No.
No.
No.
No.
No.
Length
Length
No.
No.

m3

No.

85

3,225,632

m3

Length

153

198
54
21
5,134
415
261
75
164
5,004
1,050
6
81,716

km

Indeginious people

No.

Parameter Quantity

196,060

Livelihood support to Dis. victim

Beneficiaries(Total)

Unit

1,848,444

Unit

km

Employment generation of 2,732,930


man-days (200 BDT/day) which may be
alternatively presented as employment
generation for 30,365 people for
3 months.

Urban Schemes

m
Interventions
m
Strom Sewer

Unit

Progress(%)

6.1km

90

U-Drain, Box Culvert,


Canal Excavation

672m

50

Construction of DRH

260

75

PICTORIAL VIEW OF INTERVENTIONS

DRH at Gopalgonj

Construction of U-Drain

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Construction of drainage

PICTORIAL VIEW OF INTERVENTIONS

DRH Honble Minister, MoDMR

DRH Gopalgonj

DRH Gazipara

DRH Gopalgonj

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

PICTORIAL VIEW OF INTERVENTIONS

Rain water harvest

Solar powered PSF Water option

DRH Bainpara

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

DRH Bainpara

Pond excavation Water option

PICTORIAL VIEW OF INTERVENTIONS

Re-excavation of canal

Cyclone shelter repairing

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Embankment cum road

Land raised for flood victims

PICTORIAL VIEW OF INTERVENTIONS

Water supply through pipeline

Killah and tree plantation

Water dispenser

Secondary embankment cum road

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

PICTORIAL VIEW OF INTERVENTIONS

Embankment cum road

Reverse Osmosis Plant Water option

Vegetation at Killah

Hygienic Toilet

Brick Flat Soiling (BFS)

Homestead gardening at DRH

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

VISITORS AT FIELD

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

WAY FORWARD
Strengthen local community/ authority to
sustain LDRRF supported activities;

Establish linkage between local disaster risk


reduction initiatives and development initiatives
through mainstreaming;

Support government to institutionalize LDRRF.

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Thank you

For more information contact:


LDRRF Secretariat
Comprehensive Disaster Management Programme (CDMP II)
Disaster Management & Relief Bhaban (6th Floor)
92-93 Mohakhali C/A, Dhaka-1212, Bangladesh, Tel: (+88 02) 989 0937, 882 1255

Comprehensive Disaster Management Programme (CDMP II)


Ministry of Disaster Management & Relief

Website: www.cdmp.org.bd

Anda mungkin juga menyukai