Anda di halaman 1dari 2

9306 Federal Register / Vol. 70, No.

37 / Friday, February 25, 2005 / Notices

requirements; train personnel to be able EIS No. 050069, Final Supplement, Commission and U.S. Army Corps of
to respond to a collection of BLM, NV, Pipeline/South Pipeline Pit Engineers are Joint Lead Agencies for
information; search data sources; Expansion Project, Updated the above Project.
complete and review the collection of Information on Modifying the EIS No. 050076, Draft EIS, NOA, ME, RI,
information; and transmit or otherwise Extending Plan of Operations (Plan), CT, Atlantic Large Whale Take
disclose the information. Gold Acres Mining District, Launder Reduction Plan, Proposed
Dated: February 17, 2005. County, NV, Wait Period Ends: March Amendments to Implement Specific
28, 2005, Contact: Pam Jarnecke (775) Gear Modifications for Trap/Pot and
Gregory A. Green,
635–4144. Gillnet Fisheries, Broad-Based Gear
Acting Director, Office of Air Quality, EIS No. 050070, Final EIS, FHW, LA,
Planning, and Standards.
Modifications, Exclusive Economic
Kansas Lane Connector Project, Zone (EEZ), ME, CT and RI ,
[FR Doc. 05–3683 Filed 2–24–05; 8:45 am] Construction between U.S. 80 Comment Period Ends: April 26,
BILLING CODE 6560–50–P (Desiard Street) and U.S. 165 and the 2005, Contact: Mary Colligan (978)
Forsythe Avenue Extension, U.S. 281–9328.
Army COE Section 10 and 404 EIS No. 050077, DRAFT EIS, AFS, AR,
ENVIRONMENTAL PROTECTION Permits Issuance, City of Monroe, Ozark-St. Francis National Forests,
AGENCY Quachita Parish, LA, Wait Period Proposed Revised Land and Resource
Ends: March 31, 2005, Contact: Management Plan, Implementation,
[ER–FRL–6660–8] William C. Farr (225) 757–7615. Several Counties, AR, Comment
EIS No. 050071, Final EIS, FHW, MI, I– Period Ends: May 26, 2005, Contact:
Environmental Impact Statements; 94/Rehabilitation Project, Cary Frost (479) 864–7507.
Notice of Availability Transportation Improvements to a 6.7
mile portion of I–94 from east I–96 Amended Notices
Responsible Agency: Office of Federal
Activities, General Information (202) west end to Conner Avenue on the EIS No. 040554, Draft EIS, FHW, CO,
564–7167 or http://www.epa.gov/ east end, Funding and NPDES Permit, Programmatic–I–70 Mountain
compliance/nepa/. Weekly receipt of City of Detroit, Wayne County, MI, Corridor Tier 1 Project, from
Environmental Impact Statements filed Wait Period Ends: March 28, 2005, Glenwood Springs and C–470
February 14, 2005, through February 18, Contact: Abdelmoez Abdalla (517) Proposes to Increase Capacity,
2005, pursuant to 40 CFR 1506.9. 702–1820. Improve Accessibility and Mobility,
EIS No. 050072, Draft EIS, FHW, CA, 1st and Decrease Congestion, Colorado,
EIS No. 050065, Final EIS, AFS, MT, Street Viaduct and Street Widening
North Belts Travel Plan and the Dry Garfield, Eagle, Summit, Clear Creek
Project, To Replace Two Traffic Lanes and Jefferson Counties, CO, Comment
Range Project, Provision of Motorized on the 1st Street Viaduct between
and Non-motorized Recreation, Period Ends: May 24, 2005, Contact:
Vignes Street and Mission road, Jean Wallace (720) 963–3015.
Helena National Forest, Broadwater, Funding, in the City and County of
Lewis and Clark and Meagher Revision of FR Notice Published on
Los Angeles, CA, Comment Period
Counties, MT, Wait Period Ends 12/10/04: CEQ Comment Period Ending
Ends: April 11, 2005, Contact: Cindy
March 28, 2005, Contact: Beth Ihle 03/10/2005 has been Extended to 05/24/
Vigue (916) 498–5042.
(406) 266–3425. EIS No. 050073, Final EIS, AFS, ID, 2005.
EIS No. 050066, Draft EIS, FAA, MA, South Bear River Range Allotment Dated: February 22, 2005.
New Bedford Regional Airport Management Plan Revisions, Robert W. Hargrove,
Improvements Project, To Enhance Continued Livestock Grazing on Ten Director, NEPA Compliance Division, Office
Aviation Capacity, Air Traffic, Jet Allotments, Caribou-Targhee National of Federal Activities.
Traffic, Air Cargo and General Forest, Montpelier Ranger District, [FR Doc. 05–3686 Filed 2–24–05; 8:45 am]
Aviation Traffic, Southeastern Bear Lake and Franklin Counties, ID, BILLING CODE 6560–50–P
Massachusetts Region, City of New Wait Period Ends: March 28, 2005,
Bedford, Bristol County, MA, Contact: Heidi Heyrend (208) 847–
Comment Period Ends: April 20, 0375. ENVIRONMENTAL PROTECTION
2005, Contact: John C. Silva (781) EIS No. 050074, Draft EIS, NAS, FL, AGENCY
238–7602. New Horizons Mission to Pluto,
EIS No. 050067, Final EIS, FHW, OR, [ER–FRL–6660–9]
Continued Preparations and
U.S. 101/Oregon Coast Highway Implementation to Explore Pluto and Environmental Impact Statements and
Reconstruction, Pacific Way in the Potentially the Recently Discovered Regulations; Availability of EPA
City of Gerhart to Dooley Bridge in the Kuiper Belt, Cape Canaveral Air Force Comments
City of Seaside, Funding and COE Station, FL , Comment Period Ends:
Section 404 Permit, Clatsop County, April 11, 2005, Contact: Kurt Availability of EPA comments
OR, Wait Period Ends: March 28, Lindstrom (202) 358–1588. prepared pursuant to the Environmental
2005, Contact: John Gernhauser (503) EIS No. 050075, Draft EIS, FRC, NJ, DE, Review Process (ERP), under section
399–5749. PA, Crown Landing Liquefied Natural 309 of the Clean Air Act and Section
EIS No. 050068, Draft EIS, AFS, AK, OK, Gas Terminal, Construct and Operate 102(2)(c) of the National Environmental
Quachita National Forest, Proposed in Gloucester County, NJ and New Policy Act, as amended. Requests for
Revised Land and Resource Castle County, DE; and Logan Lateral copies of EPA comments can be directed
Management Plan, Impementation, Project, Construct and Operate a New to the Office of Federal Activities at
several counties, AR and LeFlore and Natural Gas Pipeline and Ancillary (202) 564–7167.
McCurtain Counties, OK, Comment Facilities in Gloucester County, NJ An explanation of the ratings assigned
Period Ends: April 11, 2005, Contact: and Delaware County, PA, Comment to draft environmental impact
Bill Pell (501) 321–5320. This Period Ends: April 18, 2005, Contact: statements (EISs) was published in the
document is available on the Internet Magalie R. Salas (202) 502–8371. The Federal Register dated April 2, 2004 (69
at: http://www.aokforests.com/. Federal Energy Regulatory FR 17403).

VerDate jul<14>2003 19:31 Feb 24, 2005 Jkt 205001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1
Federal Register / Vol. 70, No. 37 / Friday, February 25, 2005 / Notices 9307

Draft EISs of Approved Infrastructure, Cochise, EPA’s concerns and provided additional
ERP No. D–FHW–F40427–WI Rating Pima, Santa Cruz and Yuma Counties, information environmental issues
EC2, WI–23 Highway Project, AZ. associated with the DOE-retained lands
Transportation Improve between Fond Summary: EPA expressed and the potential transportation corridor
du Lac and Plymouth, Funding, Fond environmental concerns about the impacts on the wildlife refuge. EPA
du Lac and Sheboygan Counties, WI. project’s impacts to air quality and continued to express concerns that the
Summary: EPA has environmental wildlife habitat and requested indirect impacts of proposed
concerns about the proposed project’s additional information regarding the development could have been more
impacts to wetlands, water quality, air proposed action, mitigation, and the strongly encouraged.
quality, stormwater management, noise, relationship to JTF–6 be included in the Dated: February 22, 2005.
cumulative impacts, and leaking Final EIS. Robert W. Hargrove,
underground storage tanks. Final EISs Director, NEPA Compliance Division, Office
ERP No. D–FHW–J40168–UT Rating ERP No. F–FHW–G40179–TX, Kelly of Federal Activities.
EC2, 11400 South Project, Proposed Parkway Project, Construction from U.S. [FR Doc. 05–3687 Filed 2–24–05; 8:45 am]
Improvement to the Transportation 90 to TX–16, to Improvement BILLING CODE 6560–50–P
Network in the Southern Salt Lake Transportation Mobility, Facilitate
Valley from 12300/12600 South to Economic Development, and Enhance
10400/10600 South, and from Bangerter Safety, Funding and U.S. Army COE ENVIRONMENTAL PROTECTION
Highway to 700 East, Salt Lake City, Salt Section 404 Permit, San Antonio, Bexar AGENCY
Lake County, UT. County, TX. [OPPT–2005–0008; FRL–7700–3]
Summary: EPA has environmental Summary: EPA did not send a
concerns about the proposed project comment letter on the Final EIS. Workshops on How to Report for the
regarding indirect and cumulative ERP No. F–IBR–K39080–CA, Mendota 2006 Inventory Update Rule (IUR)
impacts, which were not adequately Pool 10-Year Exchange Agreements, Information Collection; Notice of
analyzed in the document. Water Provision to Irrigable Lands, Public Meeting
ERP No. D–IBR–K30031–CA Rating 3, Central Valley Project Improvement Act
Central Valley Project, San Luis Unit AGENCY: Environmental Protection
(CVPIA), Fresno and Madera Counties,
Long-Term Water Service Contract Agency (EPA).
CA.
Renewal, West San Joaquin Division, Summary: EPA expressed continuing ACTION: Notice.
Cities of Avenal, Coalinga and Huron, concerns regarding the potential for SUMMARY: The EPA is convening four
Fresno, King and Merced Counties, CA. adverse impacts to groundwater quality
Summary: EPA commented that the public workshops to provide training for
in the Mendota Pool area, and requested affected parties responsible for reporting
Draft EIS did not analyze the proposed more frequent monitoring and
federal action of full delivery of contract during the 2006 Inventory Update Rule
commitments to mitigate impacts. (IUR) information collection. The
quantities, the existing conditions and ERP No. F–NRS–A36450–00,
ongoing water quality degradation in the workshops will focus on the
Programmatic EIS—Emergency instructions for reporting. These
area, or the influence of drainage Watershed Protection Program,
management on the proposed action. instructions were revised in response to
Improvements and Expansion, To amendments to 40 CFR part 710
EPA recommended a Revised or Preserve Life and Property Threatened
Supplemental EIS be prepared that fully promulgated on January 7, 2003 (68 FR
by Disaster-Caused Erosion and 847) (FRL–6767–4). These workshops
analyzes the proposed federal action Flooding, U.S. 50 States and Territories
and its potential environmental impacts. are open to the public.
except Coastal Area.
ERP No. D–NPS–K65275–AZ Rating DATES: All workshops will take place
Summary: EPA continued to
EC2, Colorado River Management Plan, over 1 day. Each workshop will begin at
recommend that the NRCS take steps to
To Provide a Wilderness-Type River approximately 8:30 a.m. and end at 4:30
better integrate management of its
Experience for Visitors, General p.m. The workshops will be held in
watershed programs. EPA also requested
Management Plan, Grand Canyon early 2005: Dallas, TX (March 7); Kansas
clarification as to whether the NRCS
National Park, Colorado River, Coconino City, MO (April 4); Atlanta, GA (April
will discontinue the use of a ‘‘least-
County, AZ. 18); Philadelphia, PA (May 2).
cost’’ criterion when deciding whether
Summary: EPA expressed concerns to apply the principles of natural stream ADDRESSES: Persons planning to attend
about the project’s potential impacts to dynamics and bioengineering to the the workshops are directed to the IUR
water quality and insufficient design of EWP restoration efforts. website at http://www.epa.gov/oppt/
information regarding appropriate ERP No. F–NSF–A99224–00, iur/. This website contains specific
mitigation to minimize and avoid those Development and Implementation of workshop location information, as well
impacts. EPA recommended that the Surface Travese Capabilities in as IUR background information, draft
National Park Service, Hualapai Tribe, Antarctia Comprehensive documents, and a link to the workshop
and other partners obtain baseline and Environmental Evaluation, Antarctica. registration site. All workshop materials
periodic water quality monitoring Summary: EPA has no objections to can be downloaded from the IUR
information in the lower gorge and the proposed action. website or the EPA electronic docket at
adaptively manage activities over the ERP No. F–SFW–J64009–CO, Rocky http://www.epa.gov/edocket/ in portable
life of this plan. Flats National Wildlife Refuge document format (PDF).
ERP No. DR–CBP–K99031–AZ Rating Comprehensive Conservation Plan, 15– FOR FURTHER INFORMATION CONTACT: For
EC2, Programmatic EIS—Office of Year Guidance for Management of general information contact: Colby
Border Patrol Operational Activities Refuge Operations, Habitat Restoration Lintner, Regulatory Coordinator,
within the Border Areas of the Tucson and Visitor Services, Implementation, Environmental Assistance Division
and Yuma Sectors, Expansion of Jefferson and Boulder Counties, CO. (7408M), Office of Pollution Prevention
Operations of Technology-Based Summary: EPA acknowledge that the and Toxics, Environmental Protection
Systems, Completion and Maintenance Final EIS was generally responsive to Agency, 1200 Pennsylvania Ave., NW.,

VerDate jul<14>2003 20:02 Feb 24, 2005 Jkt 205001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\25FEN1.SGM 25FEN1

Anda mungkin juga menyukai