Input Dimensions
Recommended value
Height of wall, H =
Stem top thickness,T1 =
Stem bottom thickness,T2 =
Depth of heel cantilever,T5 =
Tappering slope,y1 =
End depth of heel cantilever,T3 =
End depth of toe cantilever,T4 =
Length of heel cantilever,L1 =
Length of toe cantilever,L2 =
Length of footing, L =
Height of fill, H2 =
Free board of wall height on top =
heq
5.00
0.25
0.40
0.40
0.10
0.21
0.30
1.95
1.40
3.75
4.80
0.00
0.845
m
m
m
m
m
m
m
m
m
m
m
m
_______________________________________________________________________________________________________________________
________________
Page RW-1
Ethiopian Roads Authority
Material Properties
Yield stength of reiforcemement steel, fy for f <=20 =
Yield stength of reiforcemement steel, fy for f >20 =
Cylinderical compressive strength at 28 days, fc' =
Unit weight of concrete,gc =
Unit weight of soil,gs =
Active earth pressure coef. Ka =
ff =
fT =
fT*tan ff=
Coef. of friction b/n concrete and foundation material =
Foundation material (Soil, Rock)=
Bearing resistance of the foundation material =
qsurcharge =
350.0 Mpa
400.0 Mpa
20.0 Mpa
24.00
19.22
0.38
38 Deg.
0.9
0.70
0.70
soil
Soil type
Clay
Sand
Gravel
fT
ff
0.85
0.8
0.9
22
25
38
250.00 kN/m2
16.24 kNm2
Load Factors
Active Horizontal earth pressure =
Vertical earth pressure =
Dead load of components =
Max
1.50
1.35
1.25
Min
0.90
1.00
0.90
Resisting
Material
Portion
concrete
W1
"
W2
"
W3
"
W4
"
W5
"
W6
"
W7
Concrete Total
soil
soil
W8
W9
Surcharge
Soil Total
Weight
[kN/m]
27.6
8.28
3.84
1.68
10.08
4.56
9.59
65.64
176.06
6.63
34.11
216.79
Centroidal moment
distance (Weight X
from toe
centroidal
[m]
distance)
1.53
42.09
1.70
14.08
1.6
6.14
0.93
1.57
0.70
7.06
2.45
11.18
2.775
26.62
108.74
2.78
1.75
2.7
489.44
11.60
92.09
593.13
heq [m]
1.70
1.20
0.76
0.61
_______________________________________________________________________________________________________________________
________________
Page RW-2
Ethiopian Roads Authority
heq [m]
2
f(x) = - 0.003382716x^3 + 0.077x^2 - 0.6265555556x + 2.478
1.5
1
0.5
0
1
4 Wall height
5
6
[m]
Colum n J
10
Wall Height[m]
1.5
3.0
6.0
9
heq [m]
1.70
1.20
0.76
0.61
heq [m ]
Let P1 & P2 be the earth pressure from the surcharge and linearly varyng load.
Force
30.86
91.30
P1
P2
sum
Arm from
Driving
foundation Moment
level
about Toe
2.5
77.14
1.7
152.16
122.15
229.30
a ) With min. factors for dead and surcharge load and max. factor for lateral pressure
The summation of moment about toe, Msum =
V
The eccentricity e , is therefore,
e =L/2-Msum/V =
0.617 m
I ) When the foundation material is rock
Case -1
347.04 kNm
275.87 KN
OK !!
L/6
When e<=L/6
q heel =
0.94 kN/m2
OK !!
q toe =
146.19 kN/m2
OK !!
0.94
146.19
_______________________________________________________________________________________________________________________
________________
Page RW-3
Ethiopian Roads Authority
When L/6<e<=3/8*L
qmax =2V/[3(L/2-e)] =
146.19 kN/m2
L1 =3[L/2-e] =
OK !!
3.774 m
146.19
L1 =
3.774 m
2.516 m
V
qmax =V(L/2+e)/[Le(L-Le/2)] =
or
V/Le=
109.65 kN/m2
OK !!
qmax =
109.65 kN/m2
Le = 2.516 m
b ) With max. factors for dead and surcharge load and max. factor for lateral pressure
The summation of moment about toe, Msum =
V=
The eccentricity e , is therefore,
e =L/2-Msum/V =
0.293 m
I ) When the foundation material is rock
Case -1
592.69 kNm
374.72
e<L/4, OK !!
When e<=L/6
q heel =
53.03 kN/m2
OK !!
q toe =
146.82 kN/m2
OK !!
53.03
146.82
Case -2
When L/6<e<=L/4
qmax =2V/[3(L/2-e)] =
L1 =3[L/2-e] =
157.94 kN/m2
OK !!
4.75 m
157.94
L1 =
4.745 m
_______________________________________________________________________________________________________________________
________________
Page RW-4
Ethiopian Roads Authority
3.163 m
qmax =
qmax =V(L/2+e)/[Le(L-Le/2)] =
118.45 kN/m2
118.5 kN/m2
OK !!
Le = 3.163 m
4.0 Stability
4.1 Stability against overturning
For foundation on soil, the location of the resultant of the reaction forces shall be within the middle half of the base.
For foundation on rock, the location of the resultant of the reaction forces shall be within the middle three-fourth
of the base. This condition is already checked above.
Driving Moment =
229.30 kN
Resisting Moment =
701.87 kN
Resisting Moment > Driving Moment, OK !!
S.F= 3.06
S.F >=2 ,Safe against Overturning
4.2 Stability against sliding
Driving force =
Resisting force =
122.15 kN
198.59 kN
5. Design of components
5.1 Design of stem
5.1.1 Design for Flexure
The moment at the base of the stem is calculated as;
Net height of fill on stem =
Msurcharge =
Mvaryng =
Msum =
4.60 m
65.29 kNm/m
118.48 "
183.78 "
28.389093
77.272088
158.49177
275.67 kNm/m
75.13 KNm/m
Mu =
275.67 KNm/m
As = Mu/fy(d-a/2)
=
2461.92 mm2
a = Asfy/(.85fc'b)
=
57.93 mm
Ig =bh3/12 =
yt=
Dprov. =
beff =
fy =
fc' =
=
bar =
cover =
dprov =
400 mm
1000 mm
400
20
0.9
20
50
340
MPa
MPa
mm
mm
mm
_______________________________________________________________________________________________________________________
________________
Page RW-5
Ethiopian Roads Authority
20
S1
c/c
0.85
120 mm
_______________________________________________________________________________________________________________________
________________
Page RW-6
Ethiopian Roads Authority
2618.0 mm2
Smax =
450 mm
0.0077 OK !!
1309.00 mm2
The distance from top to the point where half of the reinforcement is not required (i.e "y") can be found by trial and error
to equalize the moment by the factored lateral pressure and the moment that can be resisted by half of the bar.
y
3.5
My
of
eq (1)
119.52
My
of eq (2)
123
1
2.65
2.8
3
3.2
3.35
3.5
4.6
5
Extension length reqd beyond the point at which it is no longer required is given by ;
lext reqd = max( 15*dia of bar,deff)
=
340 mm
Therefore, the bar can be cut at the following distance from top of wall.
Bar cut off point from top of wall =
10
3.16 m
0.9
a ) With min. factors for dead and surcharge load and max. factor for lateral pressure
a
The factored pressure from underneath minus weight of cantilever is,
qtoe =
146.19 kN/m2
q a-a =
91.96 kN/m2
Wc
125.55 kNm/m
a
_______________________________________________________________________________________________________________________
________________
Page RW-7
Ethiopian Roads Authority
146.82 kN/m2
111.80 kN/m2
132.44 kNm/m
132.44 kNm/m
5.3E+09 mm4
75.13 KNm/m
200 mm
fr =
2.817 MPa
The amount of reinforcement shall be adequate to develop a factored flexural resistance at least equal to the
lesser of :
- 1.2 times the cracking strength determined on the basis of elastic stress distribution and the
modulus of rupture, fr, of the concrete.
- 1.33 times the factored moment required by the applicable strength load combinations.
Besides the area of reinforcement shall not be less than the minimum shrinkage and temprature reinforcement.
Since bar T2 is cut at some point up the spacing at bottom shall not be greater than half the maximum spacing.
Mcr =frIg/yt =
Mu =
132.44 KNm/m
Dprov. =
beff =
As = Mu/fy(d-a/2)
=
1389.01 mm2
fy =
fc' =
=
bar =
cover =
dprov =
1 =
a = Asfy/(.85fc'b)
=
28.60 mm
use
12
As prov. =
T1
c/c
1436.2 mm2
400 mm
1000 mm
350
20
0.9
16
75
317
0.85
MPa
MPa
mm
mm
mm
140 mm
Smax =
450 mm
0.0045 OK !!
_______________________________________________________________________________________________________________________
________________
Page RW-8
Ethiopian Roads Authority
a ) With min. factors for dead and surcharge load and max. factor for lateral pressure
b
qtoe =
q b-b =
146.19 kN/m2
V factored b-b=
135.61 kN/m
104.24 kN/m2
b ) With max. factors for dead and surcharge load and max. factor for lateral pressure
qtoe =
q b-b =
146.82 kN/m2
V factored b-b=
144.34 kN/m
V factored b-b(max) =
144.34 kN/m
119.73 kN/m2
b
0.9
b
a
wt. of soil + Surcharge
76.47 kN/m2
0.94 kN/m2
1.95 m
The average pressure by the weight of soil, surcharge and heel cantilever is given as,
qsoil+surcharge+cantilever=
118.44 kN/m2
b
a
wt. of soil + Surcharge
Case -2 When the foundation material is soil
qmax =
Lh =
157.56 kN/m2
0.33 m
Assume counter clock-wise moment as positive.
Ma-a =
206.29 kNm/m
Wc
_______________________________________________________________________________________________________________________
________________
Page RW-9
Ethiopian Roads Authority
Ma-a =
225.18 kNm/m
75.13 KNm/m
Ig =bh3/12 =
yt=
fr =
5.3E+09 mm4
200 mm
2.817 MPa
The amount of reinforcement shall be adequate to develop a factored flexural resistance at least equal to the
lesser of :
- 1.2 times the cracking strength determined on the basis of elastic stress distribution and the
modulus of rupture, fr, of the concrete.
- 1.33 times the factored moment required by the applicable strength load combinations.
Mu =
As = Mu/fy(d-a/2)
=
1974.60 mm2
a = Asfy/(.85fc'b)
=
46.46 mm
225.18 KNm/m
Dprov. =
beff =
fy =
fc' =
f=
fbar =
cover =
dprov =
1 =
400 mm
1000 mm
400
20
0.9
20
50
340
0.85
MPa
MPa
mm
mm
mm
_______________________________________________________________________________________________________________________
________________
Page RW-10
Ethiopian Roads Authority
20
H1
As prov. =
c/c
2094.4 mm2
150 mm
Smax =
450 mm
0.0062 OK !!
a ) With min. factors for dead and surcharge load and max. factor for lateral pressure
q end =
157.56 kN/m2
q b-b =
0.00 kN/m2
Lh =
1.95 kN/m
V factored b-b=
310.37 kN/m
b ) With max. factors for dead and surcharge load and max. factor for lateral pressure
q end =
155.22 kN/m2
q b-b =
155.22 kN/m2
Lh =
0.65 kN/m
V factored b-b=
197.70 kN/m
0.9
fbar =
10 mm
600 mm2
f
10
c/c
130
mm
_______________________________________________________________________________________________________________________
________________
Page RW-11
Ethiopian Roads Authority
H [height of wall]
Bar Schedule
300
Bar S1
400
400
10
S1*
c/c
240 mm
300
L=
1400 mm
S1
c/c
240 mm
S2
c/c
240 mm
4753
f
L=
20
5153 mm
400
Bar S2
f
2616
L=
20
3016 mm
400
_______________________________________________________________________________________________________________________
________________
Page RW-12
Ethiopian Roads Authority
f
4850
L=
10
S3
c/c
320 mm
c/c
240 mm
c/c
240 mm
5000 mm
150
Bar T1
175
3250
f
L=
12
T1
3425 mm
Bar T2
175
1550
f
L=
12
T2
1725 mm
Bar H1
2262
300
80
f
L=
20
T1
c/c
160 mm
2642 mm
Size
[mm]
20
10
20
10
20
12
12
10
Number/m
4.17
4.17
4.17
3.13
6.25
4.17
4.17
54
Length
[mm]
5153
1400
3016
5000
2642
3425
1725
1000*
Weight
[kg]
52.96
3.60
31.00
9.64
40.73
12.67
6.38
33.30
Grade 20 Concrete--------------------2.59 m3
Reinforcement Steel-------------------190.27 kg
* indicates that the actual length is the length of the wall minus cover
The fraction number of bar is due to per linear assumption.
_______________________________________________________________________________________________________________________
________________
Page RW-13
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-14
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-15
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-16
Ethiopian Roads Authority
3.35
_______________________________________________________________________________________________________________________
________________
Page RW-17
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-18
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-19
Ethiopian Roads Authority
My1
6.4545565
66.484055
76.370824
90.957209
107.22853
120.59049
134.9865
275.66817
77.144275
_______________________________________________________________________________________________________________________
________________
Page RW-20
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-21
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-22
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-23
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-24
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-25
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-26
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-27
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-28
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-29
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-30
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-31
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-32
Ethiopian Roads Authority
My2
86.759221
122.99952
132.1987
135.61852
138.34529
140.10599
137.14959
160.2058
166.36782
_______________________________________________________________________________________________________________________
________________
Page RW-33
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-34
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-35
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-36
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-37
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-38
Ethiopian Roads Authority
_______________________________________________________________________________________________________________________
________________
Page RW-39
Ethiopian Roads Authority