14
FLOORING AND DADOS
Notes :(i)
Unless otherwise stated, the labour rates include the handling charges of materials within 100
metres.
(ii)
The rates include the cost of water. Where the water is supplied free by department, the rates shall
be decreased accordingly.
(iii)
The rates given are for ground floor, for every additional storey add Rs. 0.30 per sqm.
(iv)
The labour rates given in this chapter include the cost of water, tools and plants and cost of good
earth for mud mortar and mud plaster wherever required.
(v)
Coarse sand (fine aggregate) for 1:2:4 concrete in item of conglomerate, polished and terrazo
flooring shall be as per Punjab PWD Specifications No.3.30.
(vi)
For square and rectangular columns, enhance the labour rate for item No. 14.28 to 14.32 by 33.3 per
cent. For round and eliptical columns, enhance the labour rates for the item No. 14.28 to 14.32 by
100 per cent. The through rates are to be increased accordingly.
(vii)
Risers of stair-case are to be paid as per skirting or dado rates while treads and landings are to be
paid as per flooring rates of similar specifications.
(viii) The rates for rubbing and polishing to granolithic finish are for rubbing & polishing to granolithic
grenite finish.
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
4.30
27.00
4.75
27.00
Sqm.
1.65
3.80
1.80
4.00
Sqm.
7.90
18.00
8.70
19.00
Sqm.
7.90
24.00
8.70
25.00
Sqm.
7.90
28.00
8.70
29.00
Sqm.
12.00
45.00
13.50
46.00
Sqm.
12.00
51.00
13.50
52.00
Page 86
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm.
12.00
55.00
13.50
56.00
Sqm.
2.55
12.00
2.80
12.50
Sqm.
2.55
10.00
2.80
10.50
Sqm.
13.00
49.00
14.00
50.00
Sqm.
21.00
36.00
23.00
38.00
Sqm.
21.00
41.50
23.50
44.00
Sqm.
19.00
34.00
21.00
36.00
Sqm.
2.60
21.50
2.85
22.00
Sqm.
4.60
35.00
5.05
35.50
Sqm.
4.05
38.50
4.45
38.50
Sqm.
12.00
61.00
13.00
62.00
Sqm.
15.00
72.00
16.50
73.00
14.11 Deleted
Page 87
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm.
5.00
27.00
5.50
27.50
Sqm.
31.00
59.00
34.00
62.00
Sqm.
38.00
70.00
42.00
74.00
Sqm
40.00
76.50
44.00
80.50
Sqm
31.00
76.00
34.00
79.00
Sqm
38.00
87.00
42.00
91.00
Page 88
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm
40.00
99.00
44.00
103.00
Sqm.
32.00
73.00
35.00
76.00
Sqm
39.00
91.00
43.00
95.00
Sqm
41.00
105.00
45.00
109.00
Page 89
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
32.00
88.00
35.00
91.00
Sqm
39.00
105.00
43.00
109.00
Sqm
41.00
123.00
45.00
127.00
Sqm.
32.00
88.00
35.00
91.00
Page 90
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm
39.00
105.00
43.00
109.00
Sqm
40.00
122.00
44.00
126.00
Sqm.
19.00
52.00
21.00
54.00
Sqm.
37.00
58.50
40.50
62.00
Page 91
45.50
71.00
50.00
75.50
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Sqm.
48.00
Sqm.
37.00
75.50
40.50
79.00
Sqm
45.00
87.50
49.50
92.00
Sqm
48.00
100.00
53.00
105.00
Sqm.
37.00
73.00
40.50
76.50
Through
Rate
5
78.00
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
53.00
83.00
Page 92
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
45.50
92.00
50.00
96.50
Sqm
48.00
105.50
53.00
110.50
Sqm.
37.00
87.50
40.50
91.00
Sqm
45.00
105.50
49.50
110.00
Page 93
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
48.00
124.00
53.00
129.00
Sqm.
37.00
87.50
40.50
91.00
Sqm
45.00
105.50
49.50
110.00
sqm
48.00
124.00
53.00
129.00
14.33 Extra over item No. 14.22 and 14.28 for plains if
33 percent white cement in 6mm thick top layer
is used.
Sqm.
--
11.80
--
11.80
4.85
--
5.30
--
Page 94
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Page 95
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Metre
14.55
--
16.00
--
Metre
3.25
--
3.55
--
Metre
7.30
--
8.00
--
Metre
4.85
--
5.35
--
1.15
--
1.25
--
Sqm.
25.00
75.00
27.00
78.00
Sqm.
9.90
58.00
11.00
59.00
14.37 Precast P.C.C. tiles conforming to I.S. 1237(ii) 1980, 20cm x 20cm x 2.5cm in ordinary grey
cement without chips laid on 20mm thick bed
of cement mortar 1:3 with neat cement slurry
between joints and over the base in floors treads
and steps on landings.
Sqm
10.00
61.00
11.00
62.00
14.37 Precast P.C.C. tiles conforming to I.S. 1237(iii) 1980, 25cm x 25cm x 2.5cm in ordinary grey
cement without chips laid on 20mm thick bed
of cement mortar 1:3 with neat cement slurry
between joints and over the base in floors,
treads and steps on landings.
Sqm
10.00
65.50
11.00
66.50
Page 96
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
14.37 Precast P.C.C. tiles conforming to I.S. 1237(iv) 1980, 30cm x 30cm x 2.50cm in ordinary grey
cement without chips laid on 20mm thick bed
of cement mortar 1:3 with neat cement slurry
between joints and over the base in floors,
treads and steps on landings.
Sqm
10.00
69.00
11.00
70.00
Sqm.
25.00
80.00
27.00
83.00
Sqm.
25.00
86.00
27.00
89.00
Sqm.
25.00
83.00
27.00
85.00
Sqm.
25.00
90.00
27.00
92.00
Sqm.
32.00
88.00
35.00
91.00
Page 97
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
32.00
86.00
35.00
89.00
Sqm.
32.00
87.00
35.00
90.00
Sqm.
32.00
86.00
35.00
89.00
Sqm.
32.00
88.00
35.00
91.00
Sqm.
30.00
203.00
33.00
206.00
14.48 Deleted
14.48 White marble tiles with grey streacks
(i) arranged from Makrana Doongri Addanga
veined and chack Doongri veined flooring
15mm to 20mm thick of various sizes over
12.5mm thick cement, coarse sand mortar 1:3
laid and jointed with white cement slurry mixed
with pigment to match the shade of marble
including rubbing and polishing :-(a)
Sqm
91.10
242.30
100.20
251.40
(b)
Sqm
91.10
334.20
100.20
343.30
Page 98
CSR-1987 [Re-print]
Sr. No.
Description
Unit
(c)
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm
91.10
468.40
100.20
477.50
(a)
Sqm
91.10
219.10
100.20
228.20
(b)
Sqm
91.10
303.60
100.20
312.70
(c)
Sqm
91.10
389.80
100.20
398.90
Sqm
91.10
274.00
100.20
283.10
(b)
Sqm
91.10
396.70
100.20
405.80
(c)
Sqm
91.10
488.70
100.20
497.80
(a)
Sqm
91.10
264.40
100.20
273.50
(b)
Sqm
91.10
396.70
100.20
405.80
(c)
Sqm
91.10
488.70
100.20
497.80
14.49 Deleted
Page 99
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
(a)
Sqm
73.20
230.40
80.50
237.70
(b)
Sqm
73.20
322.30
80.50
329.80
(c)
Sqm
73.20
456.70
80.50
464.00
(a)
Sqm
73.20
207.20
80.50
214.50
(b)
Sqm
73.20
291.70
80.50
299.00
(c)
Sqm
73.20
377.90
80.50
385.20
(a)
Sqm
73.20
262.10
80.50
269.40
(b)
Sqm
73.20
384.80
80.50
392.10
Page 100
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Page 101
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
CSR-1987 [Re-print]
Sr. No.
Description
Unit
(c)
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm
73.20
476.80
80.50
484.10
(a)
Sqm
73.20
252.60
80.50
259.90
(b)
Sqm
73.20
384.80
80.50
392.10
(c)
Sqm
73.20
476.80
80.50
484.10
Sqm
46.50
245.00
51.00
250.00
Sqm
46.70
211.80
51.40
216.50
Sqm
46.70
225.30
51.40
230.00
Sqm
46.70
197.70
51.40
202.40
Sqm
46.70
220.80
51.40
225.50
Page 102
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
46.70
225.30
51.40
230.00
Sqm.
160.00
944.00
176.00
960.00
Sqm.
21.50
60.50
23.50
62.50
Sqm.
84.00
212.00
92.00
220.00
Sqm.
38.00
175.00
42.00 179.00
Sqm.
108.00
224.00
119.00
235.00
Sqm
108.00
1103.50
118.80
1114.30
14.51 Deleted
14.52 Deleted
Page 103
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm
108.00
1377.00
118.80
1387.80
Sqm.
79.00
119.00
87.00
127.00
Sqm.
79.00
121.00
87.00
129.00
Sqm.
25.50
296.00
28.00
299.00
Sqm.
25.50
456.00
28.00
459.00
Sqm.
90.00
411.00
99.00
420.00
Sqm.
21.50
64.00
23.50
66.00
Sqm.
21.50
61.00
23.50
63.00
Sqm.
1.20
73.00
1.35
73.00
Sqm.
Page 104
7.00
7.00
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Page 105
Sqm.
Plains
Labour
Rate
4
21.50
Through
Rate
5
261.00
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
23.50
263.00
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
Sqm.
21.50
225.00
23.50
227.00
40 mm wide
Metre
0.90
3.05
1.00
3.10
(b)
32 mm wide
Metre
0.90
2.90
1.00
3.00
(c)
25 mm wide
Metre
0.90
2.60
1.00
2.70
50 mm wide
Metre
0.90
4.55
1.00
4.65
(b)
40 mm wide
Metre
0.90
3.35
1.00
3.40
(c)
32 mm wide
Metre
0.90
3.05
1.00
3.10
(d)
25 mm wide
Metre
0.90
2.75
1.00
2.80
Cum.
2.60
---
2.85
---
Metre
0.70
5.85
0.80
5.95
Sqm
73.30
165.10
80.60
172.40
Sqm
82.65
182.45
90.90
190.70
dressed
laid on
mortar
stone to
Dholpur stone
12.5mm thick
1:3 including
required shape
Page 106
CSR-1987 [Re-print]
Sr. No.
Description
Unit
Plains
Labour
Rate
4
Through
Rate
5
Sub-mountainous
Region
Labour Through
Rate
Rate
6
7
55.35
133.70
60.90
139.35
Each
35.00
734.50
38.50
738.00
Sqm
148.00
841.00
163.00
856.00
Sqm
148.00
702.00
163.00
717.00
Note:-
Page 107
CSR-1987 [Re-print]