Presentation Outline
Rambll O&G Background
Ramblls position in offshore wind
Design References
Jacket Foundations
Installation Sequence
Conclusions
Rambolls O&G
Background
DUC Fields in
the North Sea
Platforms Designed
by Ramboll alone or
in Joint Venture
1980 - 2007
Rambolls Position in
Offshore Wind
Designed in 2005
25 Individually Designed
Monopile Foundations
SWT-3.6-107
3.6 107
Siemens SWT
Turbine
Client:
Designed in 2006
60 Individually Designed
Monopile Foundations
2 substations
Vestas V90 Turbine
Client:
Designed in 2007
25 Individually Designed
Monopile Foundations
SWT-3.6-107
3.6 107
Siemens SWT
Turbine
Client:
Designed in 2008
Clients:
Siemens SWT
SWT-3
3.6
6-107
107
Turbine
Designed in 2008/2009
88 Individually Designed
Monopile Foundations
2 substation foundations
Siemens SWT-3.6-107
Turbine
Fabrication is on-going
Client:
Designed in 2007/2008
(ongoing)
18 Individually Designed
Monopile Foundations
Substation
Repower 5M Turbine
Ramboll appointed
Foundation Designer
Client:
Designed in 2008/2009
55 Individually Designed
Monopile Foundations
Vestas V90 Turbine
Substation foundation
Installation is on-going
Client:
Designed in 2008/2009,
under construction
100 Individually Designed
Monopile Foundations
Vestas V90 Turbine
Ramboll appointed Lead
Designer
Client:
RAMSGATE
75 Individually Designed
Monopile Foundations
Siemens SWT-3.6-120
Turbine
Design is on-going
Client:
Jacket Foundations
Design Aspects
06
01
Primary Steel Design
02
Secondary Steel Design
02
03
Scour assessment
04
Metocean Assessment
04
05
Geotechnical Assessment
06
Risk Assessment
01
05
03
Overall Advantages
g
Concept
p is well suited to large
g site with
varying conditions:
Varying soil conditions can be
accommodated by
Different pile penetrations
Increased foot print
Some Design
g
Considerations
Simple geometry and standard
members for easy production
Little
l sensitivity to scour and
d
sand waves
Little sensitivity to fatigue by
proper design of tubular joints
and tower/jacket transition
Detailed Stresses in
Tubular Joints
Hot spot stresses
determined by Finite
Element
l
Analysis
l
Interaction between
members through
influence matrices
Determine local joint
j
flexibilities
Minimize member
di
diameters
t
tto reduce
d
wave loads
Steel Cone
Steel Bracing
INSTALLATION
SEQUENCE
Installation Operations
Pile Driving
Jacket Lift
Transition Lift (only for Concrete)
Grouting
Continuous flow in installation by use of two jack-up vessels for jacket
installation - one for piling and one for jacket lift
Delivery of Piles
01
Pile Driving Jack-Up
02
Piles Delivered by
Tugboat and Barge
03
Piling Template and
Hammer
03
01
02
Pile driving
01
Upper and Lower
Templates, Middle
Guides
02
All four Piles
Positioned in Guides
03
All Piles Driven to
Target Penetration
01
02
03
Delivery of Jackets
01
Jack-up for Jacket and TP Installation
02
Jackets and TPs on Barge
g
03
Four installed Piles
04
Piling well ahead of Jacket Installation
04
02
01
03
03
Jacket Lift
01
Jacket lowered onto
cantilevered p
piles
01
02
Supported by temporary
Jacks by Piles
03
Row of finished Jackets
02
Transition Lift
01
TP installed on Jacket
02
Remote controlled
levelling at Piles or TP
and grouting of the
connections
01
02
Jacket installed
3
6