Developed by:
Institute for Industrial Productivity, and
ICF Marbek
16 June 2011
Contents
1
Introduction ............................................................................................................ 2
2.1
2.2
2.3
2.3.1
TA)
Energy Use and Technical Best Practice Assessment (Excel File: A2A
4
2.3.2 Generic Measure Library (Excel File: A2A Generic) and Ammonia
Measure Library (Excel File: A2A Ammonia)......................................................... 5
2.3.3
2.3.4
2.3.5
Report Card and Opportunity Identification (Excel File: A2A RCOI) ......... 5
2.3.6
EE&M Plan Checklist (Excel File: A2A Checklist and Action Plan) ........... 6
2.3.7
EE&M Action Plan Template (Excel File: A2A Checklist and Action Plan) 6
2.4
2.5
Structure of Guideline..................................................................................... 6
2.6
Description ..................................................................................................... 9
3.1.1
Objective.................................................................................................... 9
3.1.2
Variables Collected.................................................................................... 9
3.1.3
3.1.4
3.1.5
3.2
3.2.1
3.2.2
3.3
3.4
4
Objective.................................................................................................. 24
4.1.2
Variables Collected.................................................................................. 24
4.1.3
4.1.4
4.1.5
5.1.1
Objective.................................................................................................. 29
5.1.2
5.1.3
Layout ...................................................................................................... 29
5.1.4
5.1.5
5.2
Description ................................................................................................... 24
4.1.1
5.1
Description ................................................................................................... 33
6.1.1
Objective.................................................................................................. 33
6.1.2
6.1.3
Layout ...................................................................................................... 33
6.1.4
6.1.5
Description ................................................................................................... 35
7.1.1
Objective.................................................................................................. 35
7.1.2
7.1.3
Layout ...................................................................................................... 35
7.1.4
ii
7.1.5
8
Energy Efficiency and Management (EE&M) Plan and Action Plan .................... 44
8.1
8.1.1
Objective.................................................................................................. 44
8.1.2
8.1.3
Layout ...................................................................................................... 44
8.1.4
8.1.5
8.2
9
Description ................................................................................................... 44
Glossary .............................................................................................................. 50
10
Abbreviations ................................................................................................... 53
11
Appendices ...................................................................................................... 54
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
iii
Table of Exhibits
Exhibit 1: Continuous improvement process. ............................................................... 2
Exhibit 2: Tools in the toolkit and results to be achieved .............................................. 3
Exhibit 3: Sequential use of tools.................................................................................. 6
Exhibit 4: Example of first few tabs in Excel tools ......................................................... 8
Exhibit 5: Tool 1 in the sequence.................................................................................. 9
Exhibit 6: Technical best practice assessment index table ......................................... 10
Exhibit 7: Tools in the toolkit and results to be achieved ............................................ 13
Exhibit 8: Example of Technical Assessment Purchased fuel questions .................... 14
Exhibit 9: Example of Technical Assessment Sold and self-generated fuel questions15
Exhibit 10: Example of Technical Assessment Sold and self-generated fuel questions
.................................................................................................................................... 16
Exhibit 11: Example of Technical Assessment feedstock questions .......................... 16
Exhibit 12: Example of Technical Assessment equipment features questions (first
question group) ........................................................................................................... 17
Exhibit 13: Example of Technical Assessment drop down menu ............................... 17
Exhibit 14: Example of Technical Assessment section not applicable box .............. 17
Exhibit 15: Example of Technical Assessment general questions (second question
group) ......................................................................................................................... 19
Exhibit 16: Example of Additional Opportunities boxes .............................................. 19
Exhibit 17: Portion of the energy balance tables ........................................................ 21
Exhibit 18: Ammonia sub-sector specific data table ................................................... 23
Exhibit 19: Tool 2 in the sequence.............................................................................. 24
Exhibit 20: Example of Measure Library tab ............................................................... 26
Exhibit 21: Measure Library Index Tab ....................................................................... 28
Exhibit 22: Tool 3 in the sequence.............................................................................. 29
Exhibit 23: Management Best Practice Assessment index table ................................ 30
Exhibit 24: Example of Management Assessment drop down menu .......................... 31
Exhibit 25: Example of Management Assessment button selection ........................... 31
Exhibit 26: Tool 4 in the sequence.............................................................................. 33
iv
Purpose of Guideline
This guideline provides guidance for a user on how to use the Institute of Industrial
Productivitys ammonia sector Assessments to Action (A2A) toolkit. The user using
the toolkit and this guideline needs to be:
Experienced in on-site energy efficiency auditing.
Familiar with industrial manufacturing processes, specifically ammonia
manufacturing.
Familiar with industrial technologies, energy management best practices, and
ISO 50001.
Proficient in using MS Excel.
This guideline does not provide guidance in how to conduct an audit, or explanations
of industrial processes, technologies, best practices and the use of MS Excel.
The outline of the toolkit is described in Sections 2.1 and 2.3, while the structure of
the manual is described in 2.5.
Data obtained from plants are considered to be confidential and a confidentiality
agreement can be signed with the company. An example confidentiality agreement
template is included in the toolkit and needs to be completed by the company and the
company using the A2A toolkit to conduct an assessment.
Introduction
Commitment
by Factory
Assess Energy
Performance &
Establish
Indicators
Identify
Opportunities
& Define
EE&M Plan
Implement
EE&M
Action Plan
Additional
Support
A2A Toolkit
Develop
EE&M
Action Plan
The actual implementation of both the energy efficiency and energy management
(EE&M) plan and the action plan may require additional resources and support. This
support may include, for example, financial support to implement opportunities,
training and capacity building in energy management, and technical expertise to
undertake detailed economic and feasibility studies. This support can be resourced
either internally from within a company, or an external organizations, such as service
providers or financial institutions.
The assessment tools included in the toolkit are appropriate as a first-order, high-level
assessment to identify and prioritize energy efficiency opportunities. The results from
the assessments will assist in short and long term strategic planning to implement the
opportunities, and to identify follow-up actions. More detailed energy audits, and
feasibility studies may be required for some of the opportunities that are identified with
the toolkit.
Exhibit 2 illustrates the tools in the toolkit and how it correlates with the continuous
improvement process, and the results to be achieved. The tools and the use of the
tools are described in detail in the guideline, and examples are provided throughout
the guideline to illustrate the use of the toolkit.
Exhibit 2: Tools in the toolkit and results to be achieved
Continuous
Improvement
Process
Toolkit
Obtain Commitment
Technical Assessment
(Includes Energy Use Performance
and Technical Best Practices
Assessment)
Assess Performance
and Establish
Indicators
Management Assessment
(Includes Technical Management Best
Practices Assessment)
Results
Company committed to energy
management
and allocating necessary resources
to energy management
Understand current energy use,
productivity and energy
performance.
Derive performance indicators for
continuous improvement.
Productivity Improvement
Assessment
Identify
Opportunities and
Define EE&M Plan
Scope
Develop Action Plan
to Implement EE&M
Plan
Implement Action
Plan
Energy Use and Technical Best Practice Assessment (Excel File: A2A
TA)
The technical assessment tool is used to collect data applicable to assess energy
use performance and to determine the implementation of TBPs. Energy use
performance includes generating an energy balance to determine energy use by each
end use (such as, boilers, motors, and process cooling) and by energy source (such
as electricity and natural gas). It also includes the calculation of the overall energy
intensity of the plant in terms of energy use per unit production (for example GJ / ton
ammonia).
Energy technical best practices are production system and efficiency measures that
reduce energy use per unit of production. An example of a TBP is installing a heat
recovery system on a process exhaust stream to pre heat a feed stream, resulting in
reduced process energy use per unit of output. The TBP performance indicator is the
total number of applicable TBPs that are implemented at a plant. All Energy technical
best practices listed in this toolkit are commercialized, and exclude pilot-test or
demonstration technologies.
2.3.2
The measure library provides information about each technical best practice. The
technical best practices are grouped in two broad categories:
Measures applicable to generic end uses. It refers to end uses that are not
sector specific, such as: boilers and steam systems, motors, process cooling
and refrigeration, and direct process heating in ovens, dryers, furnaces and
kilns. Energy efficiency technical best practices applicable to these end uses
are included in the Measure Library.
Measures only applicable to the ammonia manufacturing sector. Energy
efficiency technical best practices applicable to only the ammonia
manufacturing sector are included in the Measure Library Ammonia Specific.
2.3.3
The energy management assessment tool is used to obtain information to assess the
implementation of energy Management Best Practices (MPBs), illustrated by a high
level of commitment, awareness, organization and acting in support of energy
management.
Numerous studies have shown that application of energy management practices is a
critical success factor for sustained improvement in energy use performance in
industrial facilities.
2.3.4
The report card and opportunity identification tool is used to read the data from the
assessment tools (described in the previous points above) and to generate the results
and output exhibits.
The results and exhibits include the energy use profiles, TBPs and MBPs
benchmarks, and prioritized opportunities. These opportunities include associated
savings in terms of energy, cost and GHG emissions.
2.3.6
EE&M Plan Checklist (Excel File: A2A Checklist and Action Plan)
The energy efficiency and energy management (EE&M) plan checklist is used to
determine the status of energy management system implementation. Elements that
are not fully implemented are prioritized and then manually transferred to the action
plan template, which is described in the next point.
2.3.7
EE&M Action Plan Template (Excel File: A2A Checklist and Action Plan)
The energy efficiency and management (EE&M) action plan template is contained in
the same Excel workbook as the EE&M plan checklist. The action plan template is
used to guide implementation of the opportunities and outstanding energy
management system elements. The opportunities and elements are manually
captured as action items, responsibilities are assigned, scheduled dates for
completion are assigned and the completion of the actions is tracked.
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
Tool 1: The technical best practices and energy use performance assessment
is completed though an on-site assessment, using the Technical Assessment
Excel workbook. The on-site assessment generally takes one to two days,
depending on the complexity of the plant. To optimize the time during the onsite assessment a pre-site visit information request and site visit agenda are
send to the plant well in advance of the site visit. Examples of the information
request and agenda are included in the toolkit.
Tool 2: The technical measure library (included in the Measure Library Excel
workbook) and the ammonia specific measure library (included in the Measure
Library Ammonia Specific Excel workbook) are used as supporting
references for the technical best practices assessment conducted in Tool 1
above. The best practices are cross referenced in the Technical Assessment
workbook.
Tool 3: The energy management best practices assessment (which uses the
Management Assessment Excel workbook) is generally completed first in a
workshop setting with representatives from different levels in the organization
and who is using the energy management system of the plant.
Tool 4: Information is obtained regarding productivity improvement during the
on-site assessment using the Productivity Improvement Excel workbook.
Tool 5: Using the data, information and results from Tools 1, 2 and 3 the
report card is generated and opportunities are identified, using the Report Card
and OI (OI: Opportunity Identification) Excel workbook.
Tool 6: The results from all the tools are used to manually develop both an
energy efficiency and energy management plan and an action plan to ensure
implementation of the actions. The EEM Plan Checklist and Action Plan
Template Excel workbook is used to develop the plans in consultation with the
plant. This development process is an iterative process and may require a
number of meetings with the plant to complete the development of the plans.
Experience has shown that it is easier for a user to first be familiarized with the
technical best practices and energy performance assessment, before building
competence in energy management best practices assessment. The guideline follows
this approach and will first discuss TBP and energy performance assessment,
followed by the discussion on MBP assessment. Tools 4 and 5 are discussed in
sequence as the last three sections of the guideline. Many guidelines exist to assist
assessors in conducting an industrial energy assessment1, and this A2A guideline
assumes that the user already has the necessary skills (see Section 1).
Office of Industrial Productivity and Energy Assessment, 2001. (US). Modern Industrial Assessments:
A Training Manual
NRCan (Canada), 2007. Energy Savings Toolbox An Energy Audit Manual and Tool
LBNL (US), 2010. Industrial Energy Audit Guidebook: Guidelines for conducting and Energy Audit in
Industrial Facilities.
EECA, 2007. Energy Audit Manual, New Zealand.
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
3.1 Description
3.1.1
Objective
The purpose of the energy use performance assessment is to determine the profile of
energy use by end use and energy source, and the overall plant energy intensity. The
energy use profile is based on an energy balance, which is calculated using the actual
annual purchased energy amounts and the estimated energy used by equipment in
the facility. The energy intensity is an indication of the energy used per production
unit.
The energy use profile assists in identifying the end uses that use the largest amount
of energy and guide prioritization of the opportunities. Implementing energy efficiency
opportunities at the end uses that consume the most energy will result in the most
significant energy and cost savings.
The overall plant energy intensity is a key performance indicator for the plant and can
be compared with the requirements national standards, and international best practice
plants.
The purpose of the technical best practice (TBPs) assessment is to determine which
TBPs are implemented at the plant, and to develop benchmarks for the plant. The
benchmarks highlights the areas where opportunities exist to implement TBPs, and
indicate the potential that still exist to implement TBPs.
3.1.2
Variables Collected
The following exhibit illustrates the layout of the Technical Best Practice Assessment
tool as shown in the index tab.
Exhibit 6: Technical best practice assessment index table
10
11
equipment that provides cooling and heating for occupancy comfort should NOT be
listed in this section but in sections C.1 and C.2.
For each equipment type, it is possible to give up to four capacities. Each capacity
represents a size range; however it is the average value of that size range which must
be entered. See section 3.2 for more detail on average capacities.
The features questions should be left blank if the plant has no equipment in the given
category.
TA 4
Compression Heating Equipment
All equipment related to compression is characterized in this section. This includes
compressors for pneumatic equipment and compression systems for process gas or
air systems.
For each equipment type, it is possible to give up to four capacities. Each capacity
represents a size range; however it is the average value of that size range which must
be entered. See section 3.2 for more detail on average capacities.
The features questions should be left blank if the plant has no equipment in the given
category.
TA 5
Motor Related
The parameters of motive power equipment are summarized in this section, including
fans, pumps, motors and conveyors. See section 3.2 for accuracy and assumptions.
TA 6
Onsite Transport
This section requires the characteristics of the vehicles used on-site for production
related purposes, such as forklifts and cranes and excludes vehicles used off-site or
delivery fleets.
TA 7
Comfort-Lighting
For all lighting fixtures, their characteristics are entered in this section. See section 3.2
for accuracy and assumptions.
The number of lamps refers to both standard and high efficient types (i.e. if there are
10 metal halide lamps, all of which are high efficiency, 10 should be entered in both
columns).
The classification of lamps as energy efficient is at the discretion of the user. However
the following table can be used as a rough guideline for that allocation
12
Type
Standard
Energy
Efficient
Fluorescent
T17, T12
T5, T8
CFL's
All
Metal Halide
High Pressure
Sodium
Mercury Vapour
Incandescent
All
All other
All
TA 8
Comfort-HVAC and Air System
Equipment providing heating and cooling for occupancy comfort, is entered in this
section with details on characteristics.
The ventilation data entered in the third table refers only to the motor power. If there
is heating of make-up air, the heating capacity should be entered in the second table
(non-packaged HVAC equipment).
TA 9
Other & System Practice
All equipment that does not fit into the other categories and is not specifically related
to ammonia production is outlined in this section, e.g. scrubbers, miscellaneous
machines. Up to five pieces of these types of equipment can be entered, as it is
expected that most equipment will be captured in the other sections.
TA 10
Ammonia Production
In this section, all ammonia manufacturing specific equipment with characteristics that
do not fit into other sections is summarized here e.g. cryogenic purifier. More details
are in section 3.4.
TA 11
Energy Balance
In this tab, the energy balance of the purchased energy and the energy used by the
reported equipment is determined (see section 3.2.2 for details on the calculation of
energy balance)
13
TA 12
Conversion
In this tab, conversions used in the calculations are provided for reference purposes
only.
3.1.4
The equipment related tabs (TA 3 to TA 10) are divided into two groups of questions,
followed by a table where additional opportunities can be entered.
Section A: First Question group: Purchased Energy
The first part of this group of questions requires details on the purchased energy at
your facility including the quantity (with fixed units) and cost. The cost per unit is
provided to verify the data, by checking that this is a reasonable value.
The lower heating value of the fuel (LHV) is provided as reference, but may be
overwritten to customize it for the fuel type. The first selections are common energy
types and drop down menus provide additional fuel-type selections.
Exhibit 8: Example of Technical Assessment Purchased fuel questions
The quantity of steam purchased can also be entered here, provided that the steam
temperature (in degree Kelvin) and pressure (in bar) are available. The LHV (or
enthalpy) of the steam can be calculated by linking to the water97_V13 file (as
described below) or by entering the known LHV of the steam.
14
15
Exhibit 10: Example of Technical Assessment Sold and self-generated fuel questions
Sections B, C, D and E are structured in the same format and are described generally
below.
Sections B to E: First Question Group Equipment Information
The first question group requires detailed equipment data as shown in the following
exhibit.
16
Exhibit 12: Example of Technical Assessment equipment features questions (first question group)
Indicating that a section is not applicable by selecting the I do not have this
equipment box at the beginning of most sections:
Exhibit 14: Example of Technical Assessment section not applicable box
Some grey cells have an autofill, and do not require user input (i.e. the
Annual Energy Use column in Exhibit 12). Therefore it is important to fill out
the questionnaire in order.
For each piece of equipment that is entered, all information in that row
pertaining to the equipment is required (eg. fuel type, operating hours,
efficiency rating) to avoid subsequent calculation errors (such as energy
balance and best practice scores). Please take special note of the following
specific examples:
17
18
Exhibit 15: Example of Technical Assessment general questions (second question group)
Drop-down menu selections for equipment features have responses with the
following implications:
No Implementation implies that the measure is applicable but not
implemented.
Partially Adopted implies that the measure has been considered and
introduced but is not fully adopted.
Fully Adopted implies that the measure has been fully adopted in the plant,
with controls and verification in place where applicable.
Not Technically Feasible implies that the measure is not an option due to
technical limitations. Enter NTF for measures with this qualification.
Sections B to E: Additional Opportunities
The bottom section of each tab allows the user to record any additional opportunities
he/she noticed but werent covered in the first two question groups.
Exhibit 16: Example of Additional Opportunities boxes
All sections B to E need to be reviewed, and those that are applicable to be filled in
with equipment type, characteristics, number, and hours of operation. For the
Technical Assessment, verify that for all applicable sections B to E, the equipment
feature questions at the end of each section are ALL be answered, including all
features questions in Section D (TA 9); input either the level of implementation or NTF
(not technically feasible). In sections where the equipment is not installed in the plant,
19
these can be omitted by indicating inapplicable sections in the boxes provided at the
beginning of each section.
It is anticipated that completing the questionnaire during an on-site assessment
requires one to two days, depending on the complexity of the plant, the availability of
the data, and verification of the energy balance (see section 3.2).
The hours of operation entry would be the average hours for all the motors in that
range.
3.2.2
Energy Balance
The following exhibit shows the energy balance tables, however most of the end-uses
and some of the energy types were hidden for this example.
20
The fuel purchased is balanced against the fuel used by each of the equipment in the
plant, by each fuel types categorized as follows: Electricity, Natural, Gas, Steam, Fuel
Oil No.2, Fuel Oil No.6, Gasoline, Propane, Other (fuel that does not fit into the
previous categories).
The energy content of the purchased fuels is determined by summing the
energy content of each fuel type.
The sold energy is the summation of the energy content of the sold fuels. For
sold energy products such as steam, the energy value of the steam is
allocated to the type of fuel used to generate the steam, with an adjustment
applied to account for the conversion of fuel to steam. This adjustment is
assumed to be 0.9, which is typical of boilers and reformer conversion.
Self-generated energy is the total steam and electricity generated on-site.
Net-imported energy is the net purchased energy minus self-generated energy
The energy used by fuel type is determined by summing the energy use per
equipment end-use for that fuel type.
21
The adjustment factor is the ratio of net imported fuel to utilized fuel for each
fuel, and should always be less than one because of the following
assumptions:
Equipment is assumed to be 100% efficient.
The hours of operation are applied directly to operating time without
adjustment for load factors applied to equipment.
Equipment capacity is assumed to be the rated capacity.
If the adjustment factor is much greater than one, the following should be
reviewed to address this:
Review quantity of purchased energy (may be too high).
Review the hours of operation of equipment using the fuel with the discrepant
adjustment factor.
Review the capacity rating of equipment using the fuel with the discrepant
adjustment factor.
Review the quantity of equipment using the fuel with the discrepant adjustment
factor.
Review the firing time and efficiency of equipment where this is reported, such
as for boilers and ovens.
Investigate whether all equipment using this fuel have been accounted for.
When the adjustment factor is close to one, then all purchased energy is being
accounted for by all reported equipment.
If the adjustment factor for steam as a fuel is much greater or less than one,
review the following:
That the source of the steam has been correctly identified in TA2
That the fuel used as steam has not been generated using another source fuel
accounted for elsewhere (e. g. natural gas generated steam) and therefore
added twice in the energy balance
22
tabs of the questionnaire. Up to five such types of equipment can be detailed, in order
of energy use. It is expected that most equipment will be captured in tabs B.1 to C.2.
The ammonia specific table is shown in the exhibit below.
Exhibit 18: Ammonia sub-sector specific data table
23
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
4.1 Description
4.1.1
Objective
Variables Collected
The library organizes energy efficiency technical best practices by end use and
several process levels. Each energy savings measure is entered in a separate tab
with its associated parameters, providing the energy savings, the fuel type saved, and
a detailed description of the measure along with the reference sources of information.
24
4.1.3
Layout of Tool
There are two types of tabs in the Excel spreadsheet of this toolkit module:
Index
This is a summary of all the energy efficient measures in the library. It lists the
following for each measure: Tab number, Measure Description, a breakdown of
applicable plant level to which this measure is applied (Plant Region, Plant Area,
System, End Use, Other grouping), the applicable Industry (typically all for this
generic library), percent savings for each fuel type (natural gas, electricity, refined
petroleum products, other fuel), and finally, the measure life. For more information on
navigating through the Measure Library using the Index tab see section 4.1.5.
Tabs 1 to 144
Each tab in this library has the same format. It is a repository of the details of each
energy efficiency measure.
25
26
27
4.1.5
This toolkit module can be used to cross reference the energy efficiency measures in
the technical assessment or the opportunities listed in the report card. Each measure
listed in the technical best practice assessment has a number in column L, which
corresponds to the measure number in the Measure Library. Note: do not change
the Measure Number or the tab numbers, as these are used to link to other
toolkit modules.
The Index tab can be used to easily navigate the library. The first column contains
the Tab Numbers (measure number) which can be clicked to view that particular tab.
Filters are set up to show the measures by groups, or to sort measures as desired:
click the down-arrow on any of the column headings to view the filter options. For
example, as shown in Exhibit 20, to view only the measures related to pumps, click
the filter arrow in the Level 4 Enduse column, un-check Select All then check the
box beside Pumps and click Ok.
Exhibit 21: Measure Library Index Tab
28
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
5.1 Description
5.1.1
Objective
Variables collected
Layout
The following exhibit illustrates the layout of the Management Best Practice
Assessment tool as shown in the index tab.
29
There are seven tabs in the Excel spreadsheet of this toolkit module:
Revisions
See section 2.6
Index
See section 2.6
Instructions
See section 2.6
MA 1
Contact information
Enter general information about the plant and its operation.
MA 2
Corporate improvement
Obtain general information about the operation of the company.
MA 3
Corporate survey
Energy Management best practices at the corporate level. The information collected
in this tab will disclose the level of importance or priority that is given to energy
management and energy conservation by assessing the energy management
systems in place at a corporate level.
MA 4
Plant survey
Energy Management best practices at the plant/facility level. The information
collected in this tab is another indication of the companys commitment to energy
management, but in this case by assessing the energy management systems in place
a plant level.
30
5.1.4
Drop down menu selections for equipment features have responses with the following
implications
Yes response implies that the measure is fully implemented.
A Partially response implies that the measure has been considered or
introduced but is not fully adopted.
A No response implies that the measure is not considered or adopted.
31
All sections are required to be filled out for this questionnaire. It is anticipated that
completing the questionnaire takes 45-60 minutes.
32
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
6.1 Description
6.1.1
Objective
Variables collected
Layout
33
There are four tabs in the Excel spreadsheet of this toolkit module:
Revisions
See section 2.6
Index
See section 2.6
PI 1
Plant information
Enter general information about the plant.
PI 2
Productivity improvement
Enter more detailed information about the company and plant. This section includes
company presence within the country or worldwide, production quantities, and
questions related to productivity and profitability.
6.1.4
All sections are required to be filled out for this questionnaire. It is anticipated that
completing the questionnaire takes 20-30 minutes.
34
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
7.1 Description
7.1.1
Objective
The Report Card and Opportunity Identification tool imports data from the assessment
tools, performs calculations to analyse and summarize the data, and presents the
results by means of graphs, charts and tables. The result is a report card which
displays a breakdown of energy consumed, technical and best practice scores, and a
summary of prioritized energy management opportunities and their potential savings.
7.1.2
Variables collected
All variables are automatically imported from the Technical Assessment and
Management Assessment tools, and the measure library. There is no requirement to
gather and enter data for this tool.
7.1.3
Layout
The following exhibit illustrates the layout of the Report Card and Opportunity
Identification tool as shown in the index tab.
35
There are five tabs in the Report Card and Opportunity Identification tool:
Revisions
See section 2.6
Index
See section 2.6
RC 1
Report card
This is the final summary of the plants energy use and energy saving opportunities. It
is populated automatically, importing data from the subsequent tabs. A completed
report card is presented in Appendix A.
RC 2
Technical Energy Management Opportunities
The opportunities are listed in order, starting with the highest priority. The priority is
determined based on the energy consumed and the opportunity to implement
technical best practices in the facility. For example, if an end-use consumes a large
amount of energy, and scores poorly on the best practices (that is, the opportunity to
implement energy efficiencies is high, compared to all available energy efficiency
opportunities in the plant), it will be given a high priority because there is a large
potential for energy savings. The designation of high, medium and low priority are
based on a threshold defined by a function of the proportion of energy use and
opportunity ratio.
36
RC 3
Energy Management (EM) Opportunities
The opportunities are listed in order, grouped by categories. Categories are shown in
columns, starting (on the left) with the highest priority. The priority is determined
based on the best practice score for each category (the category with the lowest
score is given the highest priority).
RC 4
Technical Energy Management Calculation Summary
This tab is a summary of the calculations from the subsequent tabs, as well as an
imported summary of energy use from the Technical Assessment tool (Energy
Balance tab).
RC 5
Reference Data
A summary is provided of greenhouse gas emissions factors for the various energy
types and the reference source of the factor.
RC 6
Best Practice Calcs (Management)
This is where calculations are performed to determine the Management Best
Practices score. The scores are determined in the following manner:
Maximum score = 2 for all questions
Achieved score = 0 if the question is answered no, 1 if the question is
answered partially and 2 if the question is answered yes
A score is calculated for each category of questions.
RC 7
Best Practice Calcs (Technical)
This is where calculations are performed to determine the Technical Best Practices
score for each end-use. The scores for each end-use are determined in the following
manner:
Features intermediate score:
Maximum score = 1 if there is equipment in that end-use, and if high efficiency
equipment in that end-use is feasible. Otherwise the score is 0
Achieved score = the number of high efficiency equipment / the total number of
equipment that could feasibly be high efficiency
Practices intermediate score:
37
This toolkit imports data and finally summarizes the data in a concise and coherent
plant report card.
The answers from the Technical Assessment and Management Assessments
tools are imported into RC 6 and RC 7 tabs where the scores are
calculated.
The energy use for each end-use is imported from the Technical Assessment.
The tool calculates best practices scores and uses them together with energy
use by end use to determine energy savings potential for each end-use, and to
prioritize the opportunities.
The report card (RC 1) displays these results in the form of charts and tables.
7.1.5
The Report Card module functions automatically, however a series of steps must be
followed to correctly link the toolkit, and subsequently to ensure that the data is
correct, and presentable.
Instructions for generating the Report Card:
Review the Technical and Management Assessments to ensure that the data
contained is valid for analysis.
Verify that the Technical and Management Assessments are saved with the
correct name (following an established naming convention). If not, change the
file name.
Close the Technical and Management Assessments, and open the Report
Card template file (A2A RCOI).
If the Excel default is to disable macros, a security warning will appear,
followed by an options button. Click the button and enable the macros.
Save the file with the appropriate name (following an established naming
convention).
Link the Report Card to the appropriate Technical and Management
Assessments, and open the files. The following exhibit shows the Edit Links
screen where the subsequent steps are performed.
38
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
XIII.
XIV.
Data
Edit Links
Select A2A MA from the list of sources
Click the Change Source button
Select the Management Assessment file and press Ok
Click the Open Source, then go back to the Report Card Screen
Select A2A TA from the list of sources
Click the Change Source button
Select the Technical Assessment file and press Ok
Click the Open Source button, then go back to the Report Card screen
Select A2A Ammonia Library from the list of sources
Click Update values
Select A2A Generic Library from the list of sources
Click Update values
Keep the Technical Assessment file (A2A TA) open for subsequent
steps. The other files can be closed
Run the macro on the tab RC 2 by pressing the button as shown in the
following exhibit. The macro should take a few seconds to run. It imports the
relevant opportunities to the tables in RC 2 and the relevant management
opportunities to the tables in RC 3. The macro also resets the maximum
potential energy savings values (if they have been inputted).
39
After running the macro, the report card is created. However, there are some
additional steps and/or checks to ensure the report is complete and presentable.
These steps are outlined in detail below. In addition, a more concise checklist is
provided in Appendix A.
Tab RC 2
The technical opportunities are grouped by end-use. The end-uses are listed
in order from highest potential opportunity to the lowest. The following exhibit
shows the first end-use group after running the macro. There are two things to
do/check on this tab after running the macro:
I. The column with maximum savings is left blank, and must be filled in
manually for each opportunity (in the example below, the first three
savings have been entered, and three more remain to be entered). Note
that the savings is given in the description. Sometimes this savings is
given as a range; in that case, enter the maximum savings in the range.
NOTE: for the ammonia savings, the entry must be in energy units per
ton of ammonia production (eg. 0.4 GJ/t_NH3). Where savings are
provided in percent of energy use, convert this to energy units per ton of
ammonia, based on the energy consumption per unit of ammonia
production (eg. 11.7 GJ/t_NH3) and measure savings is 4% of energy
use, then enter 0.47 GJ/t_NH3 (0.04*11.7 GJ/t_NH3).
II. Check that the text is not cut off by the grid; increase the appropriate row
height if necessary.
Exhibit 33: Report card opportunities table to be completed manually
40
Tab RC 3
The management opportunities are shown in tables in tab RC 3 as shown in
the following exhibit. The opportunities are grouped into categories and
ordered by those categories starting with the highest potential opportunity for
improvement in the left column, and decreasing to the right. There is no
additional data to enter on this tab, but it should be checked to ensure that no
text is cut off by the grid (increase row height if necessary).
Exhibit 34: Report card opportunities table to be completed manually
Tab RC 1.
The report card does not require any additional data inputs, but several checks
and possible aesthetic adjustments will need to be performed:
i. Check over the report card for missing information. There are some cells
to check in particular that will be blank or show errors if the assessment
tools were not filled out properly:
o Plant information, user information and date should be shown at
the top of the sheet:
41
Check the energy intensity number and ensure that the units are
suitable (GJ/t_NH3), and that only one decimal or no decimals are
shown.
ii. Check the leader lines on the pie charts; they may need adjusting if
there are several small pie chart portions close to each other.
Exhibit 37: Report Card pie charts
iii. Check that the graph axes are not cut off
PDFs
The results are recommended be presented in PDF format. There are three tabs
(RC 1, RC 2 and RC 3) from the Report Card and Opportunity Identification tool be
42
converted to PDF format; these PDFs can then be included in summary reports for
the participating company. To make the PDFs using MS Excel 2007, ensure that
the add-in for this version of Excel is installed and follow the steps below. For
older versions of Excel, ensure you have the appropriate printer drivers installed to
save the file as a PDF.
I.
II.
Select tab RC 1.
From the Save as menu, select PDF or XPS
III.
IV.
V.
VI.
Click the options button. Under Publish what, choose Active sheets
and press ok
Click the Publish button to create the PDF.
Repeat these steps for tabs RC 2 and RC 3. Alternatively, select
RC 1, and then press the Ctrl button on the keyboard while selecting
RC 2 and RC 3 simultaneously and carry out the steps above. All
three tabs will be printed into one document.
43
Energy Use
Performance and
Technical Best
Practices
Assessment
5
Report Card and
Opportunity
Identification
EE&M Plan
Checklist and
Action Plan
Template
Technical
Measure Library
4
Management
Best Practices
Assessment
Productivity
Improvement
Assessment
8.1 Description
8.1.1
Objective
The purpose of the Energy Efficiency and Management plan checklist and Action Plan
template is to assist an organization in developing an Energy Management Plan, and
setting priority and defining responsibility and a timeline for carrying out activities to
achieve and sustain energy efficiency improvement while considering productivity
improvement aspects.
8.1.2
Variables collected
The questionnaire lists elements to consider when developing and implementing both
an energy management plan and an action plan. The identified opportunities resulting
from using the previously discussed tools, are to be included in the development of
the plans. The plans are developed in consultation and collaboration with the plant,
and may require a number of meetings to be developed and completed.
8.1.3
Layout
The following exhibit illustrates the layout of the Energy Efficiency and Management
Plan and Action Plan tool as shown in the index tab.
44
Exhibit 41: Energy Efficiency and Management Plan (EE&M) and Action Plan index table
There are three tabs in the Excel spreadsheet of this toolkit module:
AP 1
Plant Information
Enter general information about the plant and its operation.
AP 2
Outline of EE&M Plan
An outline of the elements of the Energy Efficiency and Management Plan.
AP 3
EE&M Plan Checklist
This tab contains checklist of elements of an Energy Management and Continuous
Improvement Plan with a section to set the priority of the actions. Descriptions of each
element are also provided.
AP 4
EE&M Action Plan
This tab is a blank template to assist in developing actions to implement the EE&M
Plan. The EE&M Action Plan includes a timeframe, responsibilities, and budget for
each action. Actions are developed from the actions identified in the EE&M Plan
checklist.
8.1.4
The results of the Report Card and Opportunities Identification tool are used to
complete the EE&M Plan checklist. The prioritized elements of the EE&M Plan
Checklist are used to prepare an action plan to implement the opportunities, using the
EE&M Action Plan template.
45
8.1.5
46
Policy
Planning
Organization and Accountability
Financing
Project Management
Monitoring
Reporting and Communication
Training and Capacity Building
The ninth and last action item category is for the technical best practices
opportunities. Here the technical best practices opportunities identified in the Report
Card and Opportunity Identifications (RCOI) are manually transferred. The RCOI list
the opportunities by end uses, and include the cost savings, relative implementation
cost and relative implementation difficulty. All these elements are manually copied by
the user from the RCOI to the Action Plan together with the applicable library
reference and description (see the example provided below in Exhibit 37). The user
needs to prioritize the list by arranging the opportunities by each end use starting with
the opportunity that has the largest energy savings first, followed sequentially with the
opportunities with lower energy savings and ending with the opportunity with the
smallest energy savings. The user highlights in yellow the four opportunities that has
the largest energy savings.
Once the EE&M Action Plan template is completed, it is recommended that the
prioritized actions are reviewed, and discussed with senior management.
Responsibility can then be assigned to personnel who will ensure that the action
is carried out, as well as a scheduled date for the completed action. This task is
accomplished working in consultation with the enterprise. This action plan allows
entry of the status of updates to be carried out after monthly, semi-annual or
scheduled review. The action plan is a working document and needs to be revised
and updated in a collaborative effort between the user and the enterprise.
47
Responsibility
Assigned to
Plan
5
Do
Time Frame
Scheduled
Status or Actions/
Date
Date
Comments
Completed
Do
Check
Act
Project Management
Parameters to be considered in identifying Energy management project opportunities can include fuel substitution
and use of renewable energy.
Implementation of Identified Opportunities
(Including Technical Best Practices and
Productivity Improvement)
Ammonia
Production
Library
Reference #
AM-54
AM-34
Relative
Implementation
1
Difficulty
Maximum
Relative
Potential Energy
Implementation Cost2
Savings3,4
[TCE]
Maximum
Potential
Energy Cost
Savings4
Low
Medium
451
465,988
Medium
Medium
10,654
11,012,533
Responsibility
Assigned to:
Scheduled
Date
Status or
Actions/
Date Completed Comments
Library Description
High emissivity coating of the refractory surfaces in the radiant section of the primary reformer reduces the radiant heat
reabsorbed by the combustion flame and flue gases. This increases the radiant section efficiency and reduces the reformer
bridgewall temperature. Less fuel is thus required to achieve a given reformer process outlet temperature. Fuel savings of 25% have been demonstrated.
Steam turbine drivers can be modified with updated designs for rotors and stationary parts to increase horsepower rating
while reducing the water rate and saving energy.
48
49
Glossary
5S
A program of 'industrial housekeeping', the 5S's are 5 Japanese words which help to
guide organizations to increased levels of cleanliness, organization, & efficiency.
Category (plant information)
Grouping category provided when the enterprise was registered to obtain their
business license from the government
Code of region
Regional code provided by the National Bureau of Statistics
End use
The final application or final use to which energy is applied, such as motors, boilers,
and air compressors.
Energy intensity
The energy use per unit of product produced is referred to as the energy intensity. In
this assessment energy intensity is determined by evaluating energy use against the
main product only.
Energy management system
A set of interrelated or interacting elements to establish an energy policy and energy
objectives, and processes and procedures to achieve those objectives. (Draft ISO
50001)
Energy use profile
The percentage breakdown, by fuel type, of energy use for a generic plant in a given
sub-sector.
Energy source
Refers to the sources of energy, such as, electricity, natural gas and oil.
50
51
Retrofit measure/technology
An energy efficiency measure/technology that can be used to upgrade an existing
piece of equipment, as opposed to replacing it. Retrofit measures are applied on a full
cost basis and may be implemented immediately.
Six sigma
Refers to six standard deviations from mean. Six sigma methodology provides the
techniques and tools to improve the capability and reduce the defects in any process.
Standardized work instructions
Specific instructions that allow processes to be completed in a consistent, timely, and
repeatable manner. By implementing SWIs employees will increase production,
improve quality, and enjoy a safer, predictable working environment.
Technical best practice
A set of energy efficiency measures that represent the most advanced technology
available.
TPM
Total Productive Maintenance: preventative maintenance carried out by all
employees. It is equipment maintenance performed on a company wide basis.
Value stream mapping
Identification of all the specific activities occurring along a value stream for a product
or product family. This is part of creating a lean enterprise. The output should be a
list of action items to be done to improve the process.
52
10 Abbreviations
A2A: Assessments to action
A2A MA: Energy management assessment tool of the A2A Toolkit
A2A PIA: Productivity improvement assessment tool of the A2A Toolkit
A2A RCOI: Report card and opportunity identification tool of the A2A Toolkit
A2A TA: Technical assessment tool of the A2A Toolkit
EE&M: Energy efficiency and management
EM: Energy management
h: hours
HVAC: Heating, ventilation and air conditioning
kW: kilowatts
IIP: Institute for Industrial Productivity
ISO 50001: Energy Management of the International Organization for Standardization
LHV: Lower heating value
MBP: Management best practices
MW: megawatts
NPV: Net present value
NTF: Not technical feasible
RPP: Refined petroleum products
SME: Small and medium enterprises
TBP: Technical best practices
TCE: Tons coal equivalent
TPM: Total product maintenance
53
11 Appendices
Appendix A
54
55
Appendix B
56
A2A Toolkit
Energy and Technical Best Practice Assessment
Industry
Category
Registrated Capital
Contact Phone Number
Post Code
Fax Number
Energy conservation Manager
(secondary)
Phone number
E-mail address
Auditor Information
Name of Auditor
Auditor's Organization /
Company Name
Title of Auditor
Date of Audit
Evaluation year (for purchased &
utilized energy)
2009
The survey questionnaire is the ownership of IIP and ICF Marbek. Any use of the survey by another party requires to be granted permission by IIP or ICF Marbek prior to
use.
TA 1
Page 1 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
This section includes energy used at your facility:- the purchased, self generated and sold energy products.
A.1. PURCHASED ENERGY (exclude energy purchased for use as raw material feedstock in ammonia production)
What sources of purchased energy do you presently use at your facility?
Please indicate all types of purchased energy sources, quantities used and purchase totals (including taxes).
LHV*
GJ per
[kg or m3]
Fuel Type
Quantity
2009
2008
2009
Electricity
Natural Gas
kWh
0.03897
m3
Gasoline
0.04311
ton (metric)
0.04269
ton (metric)
LPG
0.05023
ton (metric)
ton (metric)
ton (metric)
m3
m3
m3
ton (metric)
ton (metric)
ton (metric)
ton (metric)
Steam quantity
0.00090
ton (metric)
483 K
Steam Pressure[bar]
22 bar
Cost ($)
Units
per
*LHV's can be overwritten for coal or other fuels which may vary in energy content
TA 2
Page 2 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
If the following are applicable, please indicate the type, quantity and units of each fuel used in your facility.
LHV*
Fuel Type
GJ per
2009
[kg or m3]
A.2.1 Non-Purchased Fuel
Quantity
2008
Units
[ton or k m3]
Electricity
kWh
Steam
0.00090
ton (metric)
483 K
22 bar
Electricity
kWh
Steam Quantity
0.00090
ton (metric)
483 K
22 bar
ton (metric)
ton (metric)
0.02846
TA 2
Page 3 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Product Description
Quantity
Units
[please provide]
2009
2008
2009
2008
2008
% Change
LHV*
GJ per
[kg or m3]
Quantity
2009
Natural Gas
0.03897
*LHV's can be overwritten for coal or other fuels which may vary in energy content
2008
m3
TA 2
2009
2008
Page 4 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Units
[ kW / MW]
Total number
of equipment
in each
Capacity
Range
Energy Source
[nat.gas / elec. /
etc]
Number of high
efficiency
equipment
[enter number
or NTF*]
Average Age of
Equipment
[years]
Annual
Operating
Time
[hrs]
Annual Energy
Use
[GJ]
Total: 0.0E+00
-
BOILERS
Total: 0.0E+00
-
Total: 0.0E+00
-
TA 3
Page 5 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
What are some other features of the Heating Equipment? Please respond to the following questions.
Equipment
Nameplate Capacity
Number with
Boiler type
Air-fuel ratio
Number with
Number with
Economizer
Number with High
[closed/open
Average Load controlled by
blowdown heat preheated maketype
efficiency burners
water/fire
[% of
flue gas
recovery
up air
[standard /
[enter number or
tube
Maximum]
monitoring
[enter number [enter number or
condensing /
NTF*]
Condensing
[enter number
or NTF*]
NTF*]
NTF*]
Direct Contact]
or NTF*]
BOILERS
TA 3
Page 6 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Are the following features included in your respective systems?
Features
B.1.1
B.1.2
B.1.3
B.1.4
B.1.5
B.1.6
B.1.7
B.1.8
B.1.9
B.1.10
B.1.11
Rating
The cooling / refrigeration distribution system has been assessed and modified to
ensure an optimum, efficient distribution system
More than 90% of insulation of cooling rooms, doors and refrigeration system is in good
The system includes floating head pressure control
The refrigeration / cooling system is controlled by an advanced integrated control
system, or multiple compressors are controlled by optimal sequencing/integrated
control
system.
Doorways
to cooling rooms and openings to cooling/refrigeration tunnels are covered
to minimize loss of cool air.
VSDs are installed on chiller compressors or chilled water distribution system to manage
cooling loads that fluctuate.
The chilled water set temperature is increased to its maximum feasible temperature
and/or the condenser cooling water is decreased to its optimal temperature.
Condenser pressure is reduced to its minimum feasible pressure.
Cooling water from cooling tower is used instead of chiller when outside temperature is
Equipment is included in regularly scheduled preventative maintenance program
TA 3
Page 7 of 28
Appendix E
59
A2A Toolkit
Energy and Technical Best Practice Assessment
Are the following features included in your respective systems?
Features
BOILERS
B.1.12
B.1.13
B.1.14
B.1.15
B.1.16
B.1.17
B.1.18
B.1.19
B.1.20
B.1.21
B.1.22
Rating
B.1.23
B.1.24
B.1.25
B.1.26
B.1.27
Air curtains or other methods are used at the inlet/outlet of the oven/dryer to minimise
loss of hot air.
B.1.28
B.1.29
TA 3
Rating
Page 8 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Additional Opportunities Identified (Describe)
COOLING / REFRIGERATION COMPRESSORS
BOILERS
TA 3
Page 9 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Units
[ kW / MW]
Total number
of equipment
in each
Capacity
Range
Energy Source
[nat.gas / elec. /
etc]
Go to Section B-3
Number of high
efficiency
equipment
[enter number or
NTF*]
Average Age of
Equipment
[years]
Annual
Operating
Time
[hrs]
Annual Energy
Use
[GJ]
Total: 0.0E+00
-
Total: 0.0E+00
-
TA 4
Page 10 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Are the following features included in your respective systems?
Features
B.2.1
Rating
B.2.2
B.2.3
The compressed air distribution system was assessed and modified to ensure an
optimum, efficient distribution system
Sufficiently sized compressed air receiver tanks are used to minimize load fluctuations
B.2.4
B.2.5
Air leak and condensate trap survey and repairs are conducted on a regularly scheduled
basis
Air pressure is annually assessed to ensure minimum supply air pressure in lines.
B.2.6
Equipment is included in regularly scheduled preventative maintenance program
B.2.7
B.2.8
B.2.9
B.2.10
B.2.11
B.2.12
B.2.14
Replace compressed air use with mechanical or electrical methods (such as sweeping
waste from floors instead of blowing it with compressed air)
The size of the air compressors were assessed to ensure it matches the minimum load
required.
Outside air (or coolest available air) is used as make up air.
For air cooled compressors, a heat recovery system is installed
Synchronous belts are used.
AIR OR GAS COMPRESSORS FOR PROCESS
Compression ratio is annually evaluated and optimized
Rating
B.2.20
B.2.21
TA 4
Page 11 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
TA 4
Page 12 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Annual
Energy Use
[GJ]
NTF*]
PUMPS
Total: 0.0E+00
0.0
0.0
0.0
0.0
0.0
0.0
FANS
0.0
0.0
0.0
0.0
0.0
0.0
TA 5
Page 13 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Conveyor
Number
Type of system Synchronous belts
enter
[pneumatic /
used?
characteristics of mechanical]
[yes/No/NTF*]
up to 5 systems
Drive details
Average Age
[direct couple
of Equipment
drive / ASD /
[years]
etc]
1
2
3
4
5
* NTF = Not technically Feasible
Rating
Fan sizes are assessed to ensure it is correctly sized, IGVs installed and/or impellers are trimmed where
necessary.
Have implemented a program / procedures to turn equipment off when not in use - preferably
automated.
Pumps, fans and motors are include in scheduled preventative maintenance program.
Program to replace old motors with high/premium efficiency motors and includes an assessment to
ensure motors are correctly sized.
TA 5
Page 14 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Are the following features included in your onsite transport equipment systems?
Features
B.4.1
B.4.2
B.4.3
B.4.4
Rating
TA 6
Page 15 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
C.1 LIGHTING
This section includes lighting system features in the entire facility
What lighting is present at the facility?
Type of Lighting
Total Number of
Lamps
Number of Lamps
that are Energy
Efficient
Annual Operating
Time
[hrs]
Fluorescent and
CFL's
0
0
0
0
Metal Halide
0
0
High Pressure
Sodium
0
0
0
0
Incandescent and
Other
0
0
0
Rating
Location
[interior / exterior /
both]
TA 7
Page 16 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Lighting System Energy Efficiency Opportunities Identified (Describe)
Control:
Equipment / Technology:
Other:
TA 7
Page 17 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Number of
Energy Source
equipment
[nat.gas / elec /
in of this
etc]
type
Rated
Capacity
Number of
high efficiency
Average
equipment
Equipment
[enter number
Units
Age
or NTF*]
[cooling ton
[years]
/ kW / HP]
Annual
Operating
Time
[hrs]
Annual
Energy Use
[GJ]
Total: 0.0E+00
Does your plant contain any /all equipment below for ventilation?
I do not have this equipment
Process equipment description
Energy Source
[nat.gas / elec / etc]
Average
Equipment
Age
[years]
Annual
Operating
Time
[hrs]
Annual
Energy Use
[GJ]
Total: 0.0E+00
TA 8
Page 18 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Does your HVAC system include the following?
Features
C.2.1
Heat pumps for cooling/heating
C.2.2
Automated plant HVAC control system
C.2.3
Different heating and cooling set points for seasonal and daily fluctuations
C.2.4
Set back temperatures when facility is not occupied, e.g. during weekends
C.2.5
C.2.6
C.2.7
C.2.8
C.2.9
C.2.10
C.2.11
C.2.12
C.2.13
Loading docks are well insulated, sealed and managed to minimise loss of
heated/cooled air
Within last 3 years an assessment was conducted to determine ventilation
requirements and ventilation system was optimised.
C.2.14
C.2.15
C.2.16
Rating
TA 8
Page 19 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
HVAC Opportunities Identified (Describe)
HVAC
TA 8
Page 20 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Energy Source
[nat.gas / elec / etc]
Annual
Operating
Time
[hrs]
Annual Energy
Use
[GJ]
Total:
TA 9
Page 21 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Rating
D.2.1 Interval and sub- metering system on various plant areas or processes using electricity and
processes using natural gas if applicable.
D.2.2 Electricity demand management control system
D.2.3 Power factor correction capacitors (enter power factor below)
What is the power factor for your facility? (enter value <1)
D.2.4 High efficiency dry-type transformers
D.2.5 Overall integrated plant control system
D.2.6 Heat exchanger maintenance and repair is
carried
out regularly
D.2.7 Heat
exchanger
optimization completed periodically
For facilities purchasing steam
D.2.8 Steam trap surveys completed within past 2 years and faulty traps repaired
D.2.9 Condensate is recovered for additional energy value, where technically feasible
TA 9
Page 22 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
AMMONIA PRODUCTION
This section includes all equipment related directly to Ammonia production that does not fit into the previous categories.
E.1 AMMONIA PROCESS EQUIPMENT CAPACITY
What are the respective capacities of Ammonia-specific production equipment that is not captured in any of the other sections ?
I do not have this equipment
Description of industryspecific equipment
Process Step
[pre treatment, synthesis,
etc]
Number of
equipment in
Rated Capacity
Range
Energy Source
[nat.gas / elec / etc]
Average
Rated
Capacity
Units
[ kW /
MW]
Annual
Operating
Time
[hrs]
Annual
Energy Use
[GJ]
Total: 0.0E+00
TA 10
Page 23 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Rating
E.2.1
Installation of Gas Turbine to drive process air compression, using hot exhaust gases
E.2.2
E.2.3
E.2.4
E.2.5
E.2.6
E.2.7
E.2.8
E.2.9
Axial-radial flow converter to improve conversion efficiency and reduce pressure drop
Improved catalysts in Shift Process
TA 10
Page 24 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
E.3.2
E.3.3
E.3.4
E.3.5
E.3.6
E.3.7
Optimized shift reformer duty balance between primary and secondary reformer
E.3.8
E.3.9
High Pressure water power recovery turbine to drive absorbent liquid pump
Rating
This is the last page of this survey. Thank you very much for your time and assistance.
TA 10
Page 25 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Energy Balance
Equipment energy-reported GJ/yr
Cooling / Refrigeration
Boilers
Ovens / Dryers / Kilns / Furnaces
Pneumatic Compressors
Air or Gas Compressors
Fans, Motors, Pumps
Heavy Transport
HVAC and Air System
System & Other Process
Ammonia production
Lighting
Total energy/year
Electricity
Natural Gas
Diesel
Fuel Oil
Gasoline
Propane
8
Biomass /
Other fuel
-
Steam
-
Energy Balance
Electricity
Purchased Energy (GJ/yr)
Sold Energy* (GJ/yr)
Net Purchased Energy (GJ/yr)
Self Generated Energy (GJ/yr)
Net Imported Energy (GJ/yr)
Adjustment Factor
Equipment / Purchased ratio
Natural Gas
Fuel Oil
Gasoline
Propane
Diesel
-
Other fuels
-
Gasoline
-
Propane
-
Steam
-
* Energy content of sold steam is converted back to the fuel used to generate steam with an adjustment factor for efficiency of conversion (see TA2)
Electricity
-
Natural Gas
-
Diesel
-
Fuel Oil
-
TA 11
Other fuels
-
Steam
-
Page 26 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
Year of Evaluation
Energy Share By End Use
All Energy
Cooling / Refrigeration
Boilers
Ovens / Dryers / Kilns / Furnaces
Pneumatic Compressors
Air or Gas Compressors
Fans, Motors, Pumps
Heavy Transport
HVAC and Air System
System & Other Process
Ammonia production
Lighting
Total
2009
GJ/year
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
-
% of Total
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Electricity
Natural Gas
Diesel
Fuel Oil
Gasoline
Propane
Other fuels
Steam
Total
Annual Purchased
Energy Cost [$]
GJ
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Cost ($)
Natural
Other
Electricity
Gasoline
Propane
Fuel
Steam
Diesel
fuels
Oil
Gas
0%
TA 11
Page 27 of 28
A2A Toolkit
Energy and Technical Best Practice Assessment
GJ
1
0.0036
0.0036
29.3
0.0293
1.05506E-06
4.19E-06
1.05506
Weight1
ton (metric)
ton [short]
ton [long]
kg
lbs
lb
kg
1000
907
1,016
1
0.454
0.454
Volume1
gallon
ft3
L
m3
L
3.785
28.317
1
1000
Power Units1
BHP
HP
BTU/hr
MMBTU/hr
Cooling Ton
Boiler HP
kW
MW
kW
0.746
0.7355
0.000293
293.0711
3.517
9.8095
1
1000
Energy1,2
GJ
kWh
kVA
TCE
kgCE
BTU
kCal
MMBTU
TCE
0.034129693
0.000122867
0.000122867
1
0.001
3.60087E-08
1.42867E-07
0.036008874
References
1. www.engineeringtoolbox.com
2. LBNL BEST tool
TA 12
Page 28 of 28
Appendix C
57
A2A Toolkit
Energy Management System Assessment
Auditor Information
Name of Auditor
Title of Auditor
Auditor's Organization / Company Name
Direct Telephone Number
E-mail address
Date of Audit
The survey questionnaire is the ownership of IIP and ICF Marbek. Any use of the survey by another party requires to be granted permission by IIP or ICF Marbek
prior to use.
Page 1 of 10
MA 1
A2A Toolkit
Energy Management System Assessment
What percentage of the companys total operating costs in the latest fiscal year was represented by
What percentage of the plants total operating costs in the latest fiscal year was represented by purchased energy
costs?
1.8 What is the companys current annual operating cost reduction target? [%/year]
1.9 What is the plants current annual operating cost reduction target? [%/year]
1.7
What is the companys desired return on investment on a capital project designed to improve energy use
performance and reduce energy operating costs? (Can be expressed in terms of simple payback, NPV or IRR)
1.11 Does the company have a plan to phase out old equipment over a specific period of time?
1.10
Page 2 of 10
MA 2
A2A Toolkit
Energy Management System Assessment
Yes
No
Partially
Yes
No
Partially
The company has a documented energy management planning process which annually:
sets targets for controlling energy use and cost;
2.1.3
Yes
No
Partially
defines actions to reduce energy costs and achieve the energy performance targets;
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
2.1.4
2.1.5
2.1.6
integrates the energy use and cost reduction targets and actions with annual corporate production and cost
objectives;
defines a policy and guidelines on energy performance measurement and verification.
2.2.2
2.2.3
The company treats energy management as a key financial variable of every capital project and its contribution is
clearly determined.
The company has formalized procedures which enable capital and operating financial allocations for energy
management projects to:
have the same level of authority and importance as other corporate capital and operating financial allocations.
be assessed using similar methods and processes as other plant capital and operating financial allocations.
The company requires the business case development of all energy management projects to include an assessment
2.2.4 of energy cost avoidance, maintenance cost reduction, productivity improvements and reduced environmental
compliance costs.
The company requires energy management investments to be assessed using a life-cycle cost analysis methodology
2.2.5 that converts estimated savings and cost data into a cash-flow and integrates that cash-flow with other decisionmaking metrics.
(Continue on page below)
Page 3 of 10
MA 3
A2A Toolkit
Energy Management System Assessment
The company has assigned accountability to a designated senior manager to implement the corporate energy
management policy and meet the energy use performance targets.
The company regularly (at least once within a two year period) conducts corporate and plant energy use
benchmarking using key performance indicators.
The companys energy management policy and/or internal technical standards specify energy management
measurement and verification requirements.
Internal auditing is conducted of the corporate energy management policy, planning and activities as a formalized
part of existing audit systems and protocols.
External auditing is deployed to check the companys energy management system, which includes reviewing data
base accuracy and verifying measurement system accuracy.
The company complies with local, regional and national laws and regulations applying to energy and environment,
meeting energy conservation design code and energy standards for upgrades, project expansion and construction.
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
The corporate energy management policy or strategy is communicated externally , for example it is posted on the
company web-site.
The corporate energy management policy or strategy is communicated internally to plants, for example it is posted
on communication boards in the plant(s).
Energy use key performance indicators are communicated externally , for example it is posted on the company web
site.
Energy use key performance indicators are communicated internally , for example it is posted on communication
boards in plant(s).
Energy costs and cost management are communicated in the companys annual report along with a management
discussion of energy impacts on the business.
Energy costs and cost management are communicated to the plant(s) on a quarterly basis (or more frequent).
(Continue on page below)
Page 4 of 10
MA 3
A2A Toolkit
Energy Management System Assessment
Compensation system (such as salary adjustments, bonuses, titles) tied in with achievements on projects.
Internal company recognition: Recognition system in place with awards for exceptional projects and teams.
External recognition: Government and third party recognition (eg. trade magazines, international organizations) sought for
project successes and achievements.
Page 5 of 10
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
MA 3
A2A Toolkit
Energy Management System Assessment
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
The plant has a formalized production planning process that links annual production and cost objectives to weekly
3.1.3 and daily production schedules. This production planning links the energy use performance targets and
identifying energy management accountabilities at all management, supervisory and operator levels.
The plant has a designated senior energy manager assigned responsibility and accountability to implement the
3.2.2
energy management component of the annual plant business plan.
The designated senior energy manager has energy performance targets defined in his/her annual Personal
Performance Appraisals.
The plant has an energy committee led by the senior energy manager and other personnel (e.g., technical &
3.2.4
operations personnel).
Plant employees, groups and teams are aware of energy performance targets and commitment to energy use
3.2.5
performance improving actions as stated in the plant annual operational business plan.
The plant has systems and resources in place to adequately meet the energy performance reporting requirements
3.2.6
in the business plan.
(Continue on page below)
3.2.3
Page 6 of 10
MA 4
A2A Toolkit
Energy Management System Assessment
3.3.4
3.3.5
3.3.6
3.3.7
3.3.8
3.3.9
3.3.10
3.3.11
Software tools which typically integrate directly with the control/monitoring system and database to analyze
energy use against key energy use performance indicators.
Energy consumption is measured on a basis that can be
easily related to an operational unit;
measured per physical unit of product;
identified for each operational area;
both real-time and periodic;
can be correlated to production;
can be correlated to weather.
The difference between actual and targeted energy consumption is tracked at the plant and production process
levels and causes of increased or decreased consumption are assessed.
All energy metrics (e.g., real time energy data, synchronized real time production data and reports) can be
3.3.13
accessed from a desk top computer by approved personnel.
(Continue on page below)
3.3.12
Page 7 of 10
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
MA 4
A2A Toolkit
Energy Management System Assessment
3.4.2
3.4.3
3.4.4
3.4.5
3.4.6
3.4.7
The plant uses a consistent communications and reporting protocol to channel key performance indicator results
and relevant energy use information to business units and staff.
The plant regularly reports on energy use performance relative to targets and budgets (e.g., annual, quarterly and
monthly) to those with accountability (teams or individuals) at the corporate and plant levels (e.g., operations and
technical managers).
Key energy use performance indicator results are communicated to all employees on a regular basis.
The plant uses a variety of tools as part of an ongoing energy awareness campaign to display performance, ideas,
etc.
Energy saving and other energy management ideas are solicited from employees during general team, subcommittee or employee meetings.
Energy management project costs and progress are reported to plant technical and operations management.
Energy management project costs and progress are reported to corporate management.
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Page 8 of 10
MA 4
A2A Toolkit
Energy Management System Assessment
Yes
No
Partially
Yes
No
Partially
3.5.3
Yes
No
Partially
3.5.4
Yes
No
Partially
3.5.5
Yes
No
Partially
3.5.6
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
The plant uses the following means to identify energy management project opportunities:
A Suggestion Plan administered by the energy manager or other senior staff.
Energy audits, assessments and studies.
3.5.8
3.5.7
3.5.9
3.5.10
Internal and external benchmarking, and detailed analysis of production process and infrastructure
consumption patterns.
Routine maintenance activities.
Project Implementation
3.5.15 The plant has implemented a procedure to manage the implementation of energy management projects.
3.5.16
3.5.17
3.5.18
3.5.19
The plant has designated a project manager or sub-committee to oversee the implementation of energy
management projects as ratified by upper management.
Project Measurement and Verification
Project measurement and verification plans are normally carried out as part of the project design for all energy
performance improvement projects requiring capital allocations.
The costs of conducting a project measurement and verification plan and implementation are normally included
in the cost analysis of the project.
The measurement and verification plan requires establishment of energy performance baselines and a formal
reporting process of actual versus baseline performance.
Page 9 of 10
MA 4
A2A Toolkit
Energy Management System Assessment
The approved staff training plan for energy management is incorporated into the annual employee training
schedule.
The staff training plan for energy management includes both management and technical training competencies.
3.6.4 Energy use and energy management is included in orientation training for new personnel.
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Yes
No
Partially
Senior plant staff and teams accountable for energy use and cost performance targets, are trained to:
3.6.5
3.6.6
3.6.7
3.6.8
3.6.9
Conduct energy management planning as a key part of the business planning processes.
Prepare and submit a financial business case evaluation of energy performance improvement projects, in
terms relevant to the financial criteria of the corporate project approval process.
Scope, budget and manage pre-feasibility and investment grade studies.
Designated plant employees (usually from Energy Team sub-committees) and managers are trained to oversee
and manage the identification and implementation of energy management projects.
Designated plant personnel are trained to manage energy data and information.
Page 10 of 10
MA 4
Appendix D
58
A2A Toolkit
Productivity Improvement Assessment
Auditor Information
Name of Auditor
Title of Auditor
Auditor's Organization /
Company Name
Direct Telephone Number
E-mail address
Date of Audit
The survey questionnaire is the ownership of IIP and ICF Marbek. Any use of the survey by another party requires to be granted
permission by IIP or ICF Marbek prior to use.
Page 1 of 3
PI 1 - Plant Information
A2A Toolkit
Productivity Improvement Assessment
Section 1: About the Plant and the Company
1.1
1.1.1
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3
1.3.1
1.3.2
1.4
Company Ownership
Type of company ownership?
Company Presence (International or in-country)
Years of company operation
Number of years the specific factory has been operating
Number of factories currently operating
Number of employees:
Total in company
Total in the target factory
Products and Output
Annual revenue / total income:
Across all of the company's plants
In the target plant
Factors Impacting Profitability
Response
Response
Response
What does the company consider to be the corporate and business factors that will impact
profitability over the next two year period? (Please indicate the top 5 factors and rank from 1 to 5
from the list below)
1.4.1 Operational efficiency
1.4.2
1.4.3
1.4.4
1.4.5
1.4.6
1.4.7
1.4.8
1.4.9
1.4.10
Page 2 of 3
Productivity Improvement
A2A Toolkit
Productivity Improvement Assessment
Section 2: Sustainability and Productivity
2.1 Sustainability
2.1.1 Does the company set targets to improve sustainability?
If yes, what is the annual target percentage improvement for:
2.1.2 Energy use
2.1.3 Total carbon emissions
2.1.4 Water use
2.1.5 Waste water discharge
Does the company measure environmental sustainability of its
2.1.6 operations?
If yes, what techniques are used?
2.1.7
Certification of performance (e.g., ISO 14001)
2.1.8
Tracking improvement (e.g., energy audits)
2.1.9
Reporting (e.g., corporate sustainability reporting)
2.2 Continuous and Productivity Improvement
Response
Countinuous Improvement thinking and practices are a systematic approach on how to identify
and eliminate waste while focusing on adding value to internal and external customers.
To what extent is your organization engaged in the adoption of Continuous Improvement thinking
2.2.1
and practices? (Choose from the dropdown list below)
2.2.4
Page 3 of 3
Productivity Improvement
A2A Toolkit
Checklist and Action Plan
Auditor Information
Name of Auditor
Title of Auditor
Auditor's Organization / Company
Name
Direct Telephone Number
E-mail address
Date of Audit
The survey questionnaire is the ownership of IIP and ICF Marbek. Any use of the survey by another party requires to be granted permission by IIP
or ICF Marbek prior to use.
IIP / ICF Marbek
AP 1
Page 1 of 9
A2A Toolkit
Checklist and Action Plan
Policy
Planning
Financing
Project Management
Monitoring
10
Other Elements
AP 2
Page 2 of 9
A2A Toolkit
Checklist and Action Plan
Status
Details
Priority
(Y/N/Partially)
1
1.1
1.2
1.3
2
2.1
2.2
2.4
2.5
2.6
(high/med/low)
Policy
Effective energy management begins with senior management issuing a company energy
policy that is documented, communicated and understood within the organization. The
policy needs to include long-term strategic energy management commitments and
objectives.
Energy targets are set and performance is linked to the objectives of the organization.
There is commitment to ensure the availability of information and resources to carry out
the actions and a commitment to comply with legal and other requirements.
The company's EM Plan and policy is reviewed annually with commitment from senior
management, and evaluated to ensure continuous improvement, with regular updates to
reflect changing needs and priorities. There are guidelines and procedures in place to
establish the scope and boundary of energy management activities.
Planning
Does the EM Plan commit to providing the necessary
resources to carry out the energy management planning
activities?
Does the EM Plan include:
- methodology and criteria to develop the plant's energy
profile and energy baseline?
- the plant's energy baseline and energy profile?
Finances and human resources are allocated to support planning of energy management.
An energy profile is developed by measuring and analyzing energy use, identifying areas
of significant energy use and prioritizing opportunities for improvement of energy
performance. An energy baseline establishes the initial energy profile considering a data
period suitable to the organization's energy use. Adjustments are made to the baseline if
major process, operational or system changes have been affected.
AP 3
Page 3 of 9
A2A Toolkit
Checklist and Action Plan
3.1
3.2
3.3
A designated energy manager ensures that energy policy is implemented and energy
performance targets are met. Energy performance objectives can be tied to performance
assessment of the designated energy manager. The team leader defines and
communicates responsibilities and authority, reporting to top management on energy
performance and improvements.
An energy committee, led by a senior manager, establishes an energy management
information system, maintains it and implements it in accordance with company policy.
The team is aware of the organizational commitment to energy management and the
targets. Appointed members by the management are assigned sufficient responsibility,
authority and provided with required skills and training.
Internal audits of policy, planning and activities are carried out regularly. External audits
are used to check the energy management system, and accuracies, with activities such as
benchmarking.
Financing
4.1
4.2
4.3
Energy management investments are assessed using life-cycle cost analysis, integrating
estimated savings into a cash flow that is linked to decision-making metrics. The energy
profile is assessed and updated over the project operating lifetime. Suppliers are
informed that purchasing is evaluated on the basis of energy efficiency.
4.4
Consider the following when purchasing energy: energy quantity, availability and
capacity, variation over specified time, billing parameters and cost, environmental impact
and renewable energy sources.
AP 3
Page 4 of 9
A2A Toolkit
Checklist and Action Plan
Project Management
5.1
5.2
5.3
Monitoring of trade journals, databases and networking with other facilities can identify
energy management best practices, which can be shared throughout the facility and
developed into projects.
Monitoring
6.1
An Energy Management Information System should provide data that is accurate and
repeatable. Equipment used in data collection should be calibrated regularly. Key
elements of energy performance to be supported by the EMIS include: defining plant's
energy profile, identifying significant energy uses, measuring energy reduction impacts of
projects, and evaluating effectiveness of energy plans in achieving objectives and targets.
6.2
Operations using significant energy should form the basis of establishing and setting
criteria for effective operation and maintenance, with appropriate communication of
operational protocols provided to operating personnel.
6.3
Energy use can be correlated to other metrics (such as an operational unit, or production)
to provide energy performance indicators. The indicators are used to measure, record
and evaluate differences between actual and targeted energy consumption, and inform
actions to improve performance. When developing performance indicators it is important
to also consider non-production influences, such as weather and seasonal fluctuations of
temperature.
6.4
Does the EM Plan define a procedure to deal with nonconforming energy performance and the implementation of
corrective and preventative actions to address nonconformance?
Procedures need to include corrective and preventative actions with the aim to minimize
non-conformance. These actions may include (for example): review, root-cause analysis,
determining the need for action, defining the actions and reviewing their effectiveness.
Establishing and maintaining records demonstrates conformity and provides historical
and organizational knowledge.
AP 3
Page 5 of 9
A2A Toolkit
Checklist and Action Plan
7.1
Effective communication is maintained by regular reporting on, not only corporate policy,
but energy use performance relative to targets set in the energy policy. Communication is
aimed at those accountable for energy management as well as all employees. The
procedure should be appropriate to the size of the plant.
7.2
If a plant decides to report energy management and its performance to customers and
stakeholders, the annual report or the company website can be a good venue. A variety
of tools can be used to display energy costs, results and progress as part of an internal
energy awareness campaign, such as internal boards, team meetings, and newsletters.
7.3
7.4
Ensure that a process is in place to encourage personnel to make proposals for energy
management improvements. General team, sub-committee or employee meetings can be
used to solicit ideas from staff who are knowledgeable with the day to day facility
operations.
Establish, implement and maintain a procedure to communicate the organizations energy
performance, appropriate to the size of the organization.
8.1
Identify training needs associated with control of significant energy systems, operation of
energy management information systems. Ensure designated personnel are provided
access to adequate training to manage energy data, information and oversee
identification and implementation of energy management projects.
8.2
8.3
The facility budget needs to include a budget for staff training (both technical and
management competencies) to support energy management. It is important to develop
and maintain awareness of the importance of personnel roles and responsibilities in
energy management, as well as the benefits and significance of energy use and
consequences of non-conformity.
Designate staff and energy managers to ensure energy management training and capacity
needs are identified and addressed through training and capacity building.
8.4
AP 3
Page 6 of 9
A2A Toolkit
Checklist and Action Plan
9.1
Regularly review audits results, employee suggestion plans, review of industry best
practices and other review processes to identify relevant energy performance
improvement opportunities, along with expected savings.
9.2
A business plan should be prepared for each identified opportunity, with, at minimum,
investment cost, payback, energy savings. Establish a budget, plan, and resources to carry
out prioritized opportunities.
9.3
Regularly review audits results, employee suggestion plans, review of industry best
practices and other review processes to identify relevant productivity improvement
opportunities, along with expected waste reduction.
9.4
A business plan should be prepared for each identified opportunity, with, at minimum,
investment cost, payback, waste reduction, productivity improvement benefits. Establish
a budget, plan, and resources to carry out prioritized opportunities.
10 Other Elements
10.1
The policy statement should indicate that relevant laws, regulations, permit requirements
and other agreed upon rules are satisfied, and the organization should ensure that all
practices conform to them.
10.2
Define the energy management and continuous improvement systems, their operation
and ensure its availability to all users. The documents should indicate who is responsible
for them and how and where each is managed.
10.3
Analyze non-conformance occurrences, and ensure that corrective measures are taken to
prevent reoccurrences.
AP 3
Page 7 of 9
A2A Toolkit
Checklist and Action Plan
Responsibility
Assigned to
Plan
1
Policy
Planning
Financing
Project Management
Monitoring
Marbek / IIP
Do
Maximum Potential
Maximum Potential
Energy Savings2,3
Energy Cost Savings3
[GJ]
Relative
Implementation
Cost4
AP 4
Relative
Implementation
Difficulty5
Time Frame
Scheduled
Status or Actions/Comments
Date
Date
Completed
Do
Responsibility
Assigned to:
Scheduled
Date
Check
Act
Status or
Actions/Comments
Date Completed
Page 8 of 9
A2A Toolkit
Checklist and Action Plan
The potential savings presented are an estimate of maximum savings per individual opportunity and are not additive. Interactive effects will reduce the total potential savings if more than one opportunity is
implemented.
General practices for implementation of energy efficiency opportunities:
a) Sequence of implementation i) Optimize the demand and output of equipment as a first step (eg. fix air leaks) ii) Properly size the supply equipment and, if possible, upgrade to more efficient equipment, at the
same time.
b) If the equipment demand is low, then consider optimization of the equipment characteristics, such as efficiency. If demand is fluctuating, consider implementing measures to meet the fluctuating demand, such as
variable speed drives or other controls.
c) When implementing control equipment to optimize energy use (such as VSDs or advanced control), consider the effects on the power factor of the facility.
Notes:
1. The opportunities are listed by end use, starting the the highest priority end-use as listed in the report card. Within each end use, the opportunities are listed by 1) highest cost savings, 2) lowest relative implementation cost 3)
lowest implementation difficulty. The top three potential energy cost savings opportunities are highlighted.
2.The opportunities are based on both the energy consumed and the technical best practices for your facility. Please note that the values shown are approximations and are based on site conditions.
3.Energy savings are maximum values based on all energy consumed by each end use and does not consider equipment that is already efficient. More detailed analysis is required to determine precise energy and cost savings.
4. Relative Implementation Cost:
High: Implementation cost is very high, and a detailed economic feasibility analysis (based on a detailed process design) is required to justify and estimate the cost.
Medium: Cost is relatively average, and usually requires a first-order economic feasibility analysis to justify and estimate the cost.
Low: Limited to no cost involved to implement the opportunity. Generally referred to as "low hanging fruit.
5. Relative Implementation Difficulty:
High: Replacement of existing, large equipment / process units, or complex modification to the process, which requires external expertise to design and implement. Requires a detailed technical and economic feasibility assessment
and detailed process design prior to implementation.
Medium: Replacement of existing, small/medium size equipment / process units, or relative minor modification to the process, which can often be design and implemented by in-house expertise. Retrofit of equipment that require a
moderate effort to implement. Generally requires only a first order technical and economic feasibility assessment and minor process design prior to implementation.
Low: Process modifications, equipment replacements and retrofits that are relatively easy to implement. Most oftern can be integrated with maintenance activities and include operational and behaviorual changes. A high level
economic and technical feasibility analysis may be required in some instances.
Marbek / IIP
AP 4
Page 9 of 9