DETAIL OF MEASUREMENTS

Item

Particulars

No.

L
ft

Measurements
B
in
ft
in

H
ft

Beam top level

in

16

1TB 17
below floor level
vertical spacing (ft)

GL 1 & B to G

ply wood-12mm-base
longitudinal timber beam
traverse timber beam
ply wood-12mm-side
horizontal timber beam
vertical timber beam
inclined timber beam
sleeper
U head prop - 2 ft
2" pipe
2" pipe

10

12

2
1
2
53
2
4
28
28

3"x2"
3"x2"
3"x2"

76.75
76.75
4
76.75
76.75

10

GL 1 & A to G

0.5
2
2
12
14

1.5
2
12

106
106
106

13.458
100.75

3
153.5
212
6
307
32.7
42.0
106
106

14
0

2.a 1TB 10
below floor level
vertical spacing (ft)

GL 1 & A to G

5.00

14

14
-4

2.b 1TB 4A
below floor level

bay spacing (fnos/bay


1.5
3"x2"
3"x2"

1TB 10,1TB4A,1TB7B
below floor level

ply wood-12mm-base
longitudinal timber beam
traverse timber beam
ply wood-12mm-side
horizontal timber beam
vertical timber beam
inclined timber beam
sleeper
U head prop - 2 ft
2" pipe
1" pipe

76.75

0
6

Deduction Contents
ft

bay spacing (fnos/bay


1.5

3"x2"
3"x2"
3"x2"
3"x2"
3"x2"

2
1
2
5
2
4
4
4

5
5
4
5
5

14

16
1.5
2
12

10
10
10
GL 1 & A to G

0.5
2
2
14

17.292
19.00

14

60
-4

Page 1 of 19

1
10
20
1
20
5.3
6.0
10
10

Total of
each

nos
ft
ft
nos
ft
ft
ft
nos
nos

nos
ft
ft
nos
ft
ft
ft
nos
nos

Page 2 of 19

DETAIL OF MEASUREMENTS
Item

Particulars

No.

L
ft

Measurements
B
in
ft
in

H
ft

Beam top level

in
16

Beam length
H
V

nos
1
1

total length
590
210
800

below floor level

2.a 1TB 10
below floor level
vertical spacing (ft)

GL 1 & A to G

14

14
-4

6
ply wood-12mm-base
longitudinal timber beam
traverse timber beam
ply wood-12mm-side
horizontal timber beam
vertical timber beam
inclined timber beam
sleeper
U head prop - 2 ft
2" pipe
1" pipe

800.00

bay spacing (fnos/bay


2

3"x2"
3"x2"
3"x2"
3"x2"
3"x2"

2
1
2
401
2
4
270
270

800
800
4
800
800

14

0.5
2
2
14
16

1.5

802
802
802

Page 3 of 19

2
12
17.292

Deduction
ft

Contents

Total of
each

35
1600
1604
70
3200
360.0
405.0

nos
ft
ft
nos
ft
ft
ft

802
802

nos
nos

Page 4 of 19

BUILDER'S ESTIMATE
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
17
18
19
20
21
22
23
24
25
26
27

Particular
( A ) Material Cost
Cement
Sand
Aggregate
Earth
Brick
Broken Brick
1" thick plank (Jungle Wood)
Scantling (Jungle Wood)
Nail
5/8" ms rod
1/2" ms rod
3/8" ms rod
1/4" ms rod
Binding wire
X-met
Wood (Roofing Frame)
Wood (Doors & Windows Frame)
2'x2' AC Plain Sheet Ceiling
2"x 2" joist
Beading
Roofing Sheet
Ridge Plain Sheet
Plastic Paint.
Paint for Ceiling
Doors & Windows Area

Quantity

Unit

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

bags
sud
sud
sud
no.
sud
ton
ton
Viss
ton
ton
ton
ton
lb
ft.
ton
ton
sqft.
ton
ton
sqft.
sqft.
gal.
gal.
sqft.

Rate

Per

Amount

2 - times used
2 - times used

Total Material Cost =


Total Labour Cost =
Total Materials & Labour Cost =
Estimated - By

NYO MAR THAN

Remarks

25% of Material cost

Checked - By

U ZAW WIN LWIN

ybook

EARTH WORK
Earth Work Excavation
worker
sundries

L.S

SAND FILLING
Sand Filling
sand
worker
sundries

100 cuft
1.5 No

100 cuft
125 cuft
1 No
L.S

MORTAR
1:3 Cement Mortar
cement
sand
worker

100 cuft
2970 LBS
100 cuft
4 No

3b

3A Damp Proof Cement Mortar 1:2 with 5% Pudlo by weight of Cement


100 cuft
cement
4320 LBS
pudlo
216 LBS
sand
96 cuft
worker
4 No

CONCRETE
1:4:8 Cement Concrete
cement
sand
aggregate
mason
worker

100 cuft
1170 Lbs
52 cuft
104 cuft
1 No
10 No

4A Lime Concrete 1:1:1:6


Gravel
Lime
Sand
Surkhi
Mason
worker

100 cuft
100 cuft
19 cuft
19 cuft
19 cuft
0.5 No
9.66 No

Page 6

ybook

4B 1:3:6 Cement Concrete


cement
sand
aggregate
mason
worker

100 cuft
1440 LBS
48 cuft
96 cuft
1 No
5 No

4C 1:2:4 Cement Concrete


cement
sand
aggregate
mason
worker

100 cuft
2070 LBS
46 cuft
92 cuft
1 No
10 No

4D 1 1/2" thick 1:2:4 Cement Concrete with 5% Pudlo to the weight of


cement for damp proof course
100 cuft
cement
241 LBS
pudlo
12 LBS
sand
6 cuft
aggregate
12 cuft
mason
1 No
worker
1 No
4E Terrazo mix 1:2 with 1/4" down marble chipping in colour cement
100 cuft
colour crete
4320
marble chipping
108
mason
1
worker
5
4F Timber Shuttering (form Work)
timber scantling
1" timber plank
nails and spikes
ms bolts & washer if required
carpenter
worker

100 sqft
15 cuft
9.167 cuft
3 LBS
4 No
2 No

Reinforced Concrete
1:2:4 Reinforced Concrete
cement
sand
aggregate
mason
worker

100 cuft
2070 LBS
46 cuft
92 cuft
2 No
12 No

Brick Work in 1:3 cement mortar

Page 7

ybook

1:3 cem mortar


cement
brick
sand
mason
worker

100 cuft
780 Lb
1350 No
26 cuft
4 No
6 No

6a

1:4 cement mortar


cement
brick
sand
mason
worker

100 cuft
630 Lb
1350 No
28 cuft
4 No
6 No

6A 9" thk wall


cement
brick
sand
mason
worker

100 sqft
564 Lb
700 No
19 cuft
3.5 No
3.5 No

6B 4 1/2" thk wall


cement
brick
sand
mason
worker

100 sqft
300 Lb
350 No
10 cuft
2 No
2 No

PLastering & Pointing


6C 1/2" thk. 1:3 cement mortar plastering
100 sqft
cement
150 Lb
sand
5 cuft
mason
1 No
worker
2 No
6D Pointing with cement mortar 1:3
cement
sand
mason
worker

Wood Work
Thitya,Ingin,Pyinkado,Jungle
Timber
Nails & Spike
Carpenter

100 sqft
60 Lb
2 No
1 No
2 No

50 cuft
55 cuft
14 Lb
12 No

FLOORING
6"x6" Glazed tiles Flooring laid in cement mortar 1:3
100 sqft
6"x6" Glazed Tile
420 No

Page 8

ybook

cement
sand
mason
worker

135 Lb
4.5 cuft
2.5 No
2 No

9A 1 1/2"thk 1:2:4 cem conc flooring laid in slab of 5' square


100 sqft
cement
259 Lb
sand
5.75 cuft
aggregate
11.5 cuft
mason
0.75 No
worker
1.5 No
9B 4 1/2"thk 1:2:4 cem conc flooring
cement
sand
aggregate
mason
worker
Battens & Sundries

Carpenter

100 sqft
777 Lb
17.25 cuft
34.5 cuft
1 No
4.5 No
2.25 cuft
0.02875 No

9C 6" thk Earth Floor well watered and rammed


100 sft
6" earth
58
worker
0.5075
9D Finishing and Laying smooth 3/8"thk terrazzo floor 1:2 with 1/4"marble chipping
100 sqft
Colour cement
144.90 Lb
cement
103.95 Lb
sand
3.50 cuft
1/4" marble chipping
3.22 cuft
metal strip
50.00 rft
mason
1 No
grinder using machine
0.50 day
polisher using machine
0.25 day
oxalic acid dresser
0.50 day
worker
0.28 No
carborandum stone
LS
wax polish
LS
oxalic acid
LS
9E 1" tongue & Grooved Plank Flooring with 4"x1" planks
100 sqft
4"x1"t & g plank
10.96 cuft
Nail
2 Lb
Carpenter
2 No
Worker
1 No
9F Parquet flooring teak blocks 9"x3"x1 1/2" wax polished
100 sqft
Coal Tar
2 gal

Page 9

ybook

Asphalt
Turpentine
teak block
fuel
bee wax
carpenter
worker

7 gal
2 pint
580 No
4 cuft
2 Lb
6 No
8 No

10C 3" thk Reinforced brick Wall in 1:3 cement mortar,reinforced at every 4th course
100 sqft
Reinforcement
105 rft
2 1/2" wide x-met
brick
350 No
9"x4 3/8"x2 3/4"
cement
118 Lbs
sand
4 cuft
mason
1.5 No
worker
2 No
10D 4 1/2"" thk Reinforced brick Wall in 1:3 cement mortar,reinforced at every 4th course
100 sqft
Reinforcement
115 rft
2 1/2" wide x-met
brick
550 No
9"x4 3/8"x2 3/4"
cement
297 Lbs
sand
10 cuft
mason
2 No
worker
3 No
10E 4 1/2"" thk Brick Nogged Wall in 1:3 cement mortar with 6"x3" Frame
100 sqft
Reinforcement
115 rft
2 1/2" wide x-met
brick
550 No
9"x4 3/8"x2 3/4"
cement
297 Lbs
sand
10 cuft
Frames
5.5 cuft
Beading
0.81 cuft
Screw
0.75 gross
Coaltar
1 Lbs
Nail & Spike
1 Lbs
mason
2 No
Carpenter
1.25 No
worker
3 No

11

CEILING
4"x1/2" T&G Plank Ceiling with 4"x2" joist at 2' centers
100 sqft
T&G planks
5.29 cuft
Joist
3.36 cuft
Nails & Spikes
2.5 Lbs
Carpenter
2.25 No

4"x1/2" T&G planks 331 rft

11A Asbestos cement ceiling with 3"x2" joist at 2' c/c and 1 1/2"x1/2" beading for (16'x16')
256 sqft
Asbestos sheet
282 sqft
Beading
0.96 cuft
Joist
6.6 cuft

Page 10

ybook

wood screw
Nails
Carpenter

1.5 No
1.5 Lbs
6.5 No

11B Plywood complete ceiling with 3"x1 1/2" joist at 2' c/c and 1 1/2"x1/2" beading for (16'x16')
256 sqft
Plywood
295 sqft
Beading
2.28571429 cuft
Scantling
10.33 cuft
wood screw
2 No
Nails
3 Lbs
Carpenter
7.5 No
12A CGI Sheet Roofing
32G,7'CGI sheet
GI Roofing Nail
Carpenter
Worker

100 sqft
9 No
1.5 Lbs
1.5 No
1 No

12B Corrugated AC Sheet Roofing with 1/4"dia Hook Bolts & Washer
100 sqft
AC Sheet,7'
5 No
5 Lbs
Hook bolts & washer
Carpenter
2 No
Worker
1 No
12C GI Ridging 24" girth with 9"lap
GI Plain Sheet
Nail & Washer
Carpenter

100 sqft
112 rft
1.5 Lbs
3.333 No

12E Valley Gutter of GI Plain sheet 24" girth with 9" end laps,on 1/2" thk valley boards
fixed complete with 2"x1" fillet including earth oiling 2 coats
100 rft
GI Plain Sheet
112 rft
6"x1/2" Plank
9.57 cuft
Fillet 2"x1"
3.19 cuft
Nail
2.5 Lbs
Earth Oil
1.5 Gal
Carpenter
5 No
Worker
1.5 No

13

PAINTING & WASHING


Earth oil plain two coat
Earth Oil
Worker

100 sqft
0.6 Gal
0.625 No

13A White washing three coats


Strained Lime
Rice

100 sqft
1 cuft
0.375 Lbs

Page 11

ybook

Worker
0.375 No
* used liquid glue instead of rice.
13B Platic emulsion paint 3 coat
Emulsion paint
Painter

100 sqft
0.5 gallons
0.75 No

13C Painting three coats with ready mixed paint of any approved colour
1000 sqft
75 Lbs
Ready mixed paint
Putty
4 Lbs
Painter
10 No
Worker
10 No
13D Painting three coat to wood work in post,chowket,facia board,eaves board & stringer
1000 sqft
75 Lbs
Ready mixed paint
Putty
4 Lbs
Painter
12.5 No
Worker
10 No
13E Varnishing (copal) two coat
Copal Varnish
Painter

100 sqft
0.5 Gal
0.5 No

13F Wood oiling two coat


Wood Oil
Worker

100 sqft
3 Lbs
0.75 No

13G Removing old paint entirely with costic soda


100 sqft
Caustic Soda
3 Lb
LS
Paint remover brush
Carpenter
0.25 No
Painter
0.5 No
Worker
0.25 No
15B Mild steel bar reinforcement 1/2"dia cut,bent & fixed in floors, roof & beam
1 cwt
1/2" dia bar
117.6 Lbs
5% wastage
Binding wire
1 Lbs
Smith
1 No
Worker
1 No
15C Mild steel bar reinforcement 5/8"dia to 1" cut,bent & fixed in floors, roof & beam
1 cwt
5/8" dia bar
117.6 Lbs
5% wastage
Binding wire
1 Lbs
Smith
0.75 No
Worker
0.75 No

Page 12

ybook

15D Mild steel bar reinforcement in 1/4"dia stirrup & spacer cut,bent & fixed in floors, roof & beam
1 cwt
1/4" dia rod
117.6 Lbs
Binding wire
1 Lbs
Smith
2 No
Worker
2 No
15E Butt Hinge 3" to 4" fixed complete with screws
for each
3"to4" Butt Hinge
1 No
1" wood screw
0.06 Gross
Carpenter
0.04 No
15F Hasp & Staple 4" to 6" fixed complete with screws
for each
Hasp & Staple
1 No
3/4" wood screw
0.06 Gross
Carpenter
0.02 No
15G Tower Bolt 6" to 9" fixed complete with screw
for each
Tower Bolt 6"to9"
1 No
3/4" wood screw
0.06 Gross
Carpenter
0.04 No
15H Hook & Eye 6" fixed complete
for each
6" Hook & Eye
1.00 Gross
Carpenter
0.02 No
2"x1/4" MS flat iron 12" length (each)
MS flat iron 2"x1/4"x12"
1.70 lb
3/4"dia 3"long bolt & nut
0.167 lb

16

Timber Form Work


Material
Scantling
1" Plank
Nail & Spike

100 sft
15 cft
110 sft
3 lb

Mild steel bar reinforcement 1/2"dia cut,bent & fixed in floors, roof & beam
1 cwt
1/2" dia bar
117.6 Lbs
5% wastage
Binding wire
1 Lbs
Smith
1 No
Worker
1 No

38
32

Round Bar lb. / ft.


1 1/2"
1 1/4"

6.008 lb./ft.
4.172 lb./ft.

Page 13

ybook
25
22
20
18
16
14
12
10
8
6

1"
7/8"
3/4"
11/16
5/8"
7/16"
1/2"
3/8"
5/16"
1/4"

2.67 lb./ft.
2.044 lb./ft.
1.503 lb./ft.
1.2622 lb./ft.
1.043 lb./ft.
0.5111 lb./ft.
0.668 lb./ft.
0.376 lb./ft.
0.2608 lb./ft.
0.167 lb./ft.

Page 14

0
( B ) Labour Cost

Item

Particulars

Volumn of Works Unit

Site Clearing

Earthwork

Back Filling

9" Hard Core ( Sand )

1:3:6 Cement Concrete

Cuft.

1:2:4 Cement Concrete

Cuft.

Form work

Sqft.

Re-Bar

Ton.

9" thick brick work

Sqft.

Rate

Err:509 Sud
-

Sud

Err:509 Sud

Err:509 Sqft.

11 2" thick ( 1:2:4 ) Cement Concrete

Err:509 Cuft.

12 Painting Work.
Plastic Paint

Oil Paint

Err:509 Sqft.
Sqft.

12 Truss & Accessaries Work


13 Roofing

20,220 Sqft.

14 Fascia Panel

800

Rft.

15 Soffit Panel

900

Rft.

1,696

Rft.

16 Ridge & Gutter Flashing


17 Site Clearing & Levellong

Remarks

L.S.

10 4 1/2" thick brick work

Amount

( L.S )
Total Labour Cost =

Metric Ton.

Estimated By

NAME OF WORK:

Approved By

PROPOSED SIX STOREYED RCC RESIDENTIAL BUILDING


BUILDER'S ESTIMATE

Item
2

Particular

Quantity Unit

Pyinkado
5"x 2"

cuft

6"x 2"

"

3"x 2"

"

8"x1"

"
cuft
Pyinkado

ton

Jungle wood

cuft

1" plank

cuft

2"x 2"

cuft

Rate

Amount

cuft
Jungle wood
4

ton

Beading

7 cuft

Estimated by

Checked by

Bill of Quantities