TYPES OF SAP PROJECTS & TESTING METHODS

Different types of SAP projects are,


1. SAP Implementation Project. :
Company wants to implement SAP Module( Ex :HCM/MM/SD/FI/CO etc) for the first time. In
implementation projects consultant from various modules do configuration based on company
requirements. Role of consultants are configuration, integration of several modules, Data
migration from Legacy system to SAP system, prepare interfaces/RFC's to interact with sap/3rd
party systems, testings, document preparation, end user training etc Methodology suggests by
SAP for implementation is ASAP.
There are 5 stages in the ASAP methodology
1. Project Initial Preparation
2. Business Blueprint - Preparation of AS-IS and TO BE documents , Mints of meeting ,
workshops....
3. Realization - complete configuration settings in backend
4. Final Preparation- Unit testing, integration testing, UAT and end user training
5. Golive And Support : data migrations

2. SAP Support Project.


After implementation of SAP modules customer/business need assistance of consultants in their
day to day business operations using SAP software. The end user raise their concerns, issues,
errors etc through a ticket handling tool. A ticket handing tool is must for a support project , it helps
to track the status of tickets. Basically there is no phases in it. Roles of a consultant Accept
/Acknowledge the tickets, analysis the issue, document it ,solve, provide solutions to client, Get
confirmation from the user & close the ticket.
Change request and service request is the main roles in support projects.
there is a different tools to update the tickets like SM7, USD or ticket tools and so on.

3. SAP Roll-Out Project.


Company has upgraded/implemented SAP HR & wants to rollout country specific
changes in different countries.

4. SAP Up gradation Project.


Customers are moving from the older versions to new versions. It is called as SAP Migration
Projects.
Example : Company migrating from older versions like 4.5,4.6b, 4.6c to ECC 5.0 / ECC 6.0 . SAP
HR EHP3 to SAP HR EHP 5 .

TESTING METHODS IN SAP PROJECTS:


1.Development Unit Testing
This is done by developer .Unit test is executed in development system. This tests alone
pieces of functionality.
For example, you have configured the absence quotas,special absences(maternity leave or military
leaves) , custom pcrs or FMLA in development system, you dont know whether the output is
coming correct or not , for that you have to login another client in same development system , do
the copy from client by using transaction code SCC1 ,here you have to give your transport request
and execute , whatever you have configured in main system all objects are copied to testing client,
Now hire the employee , run the time eval and test the output .

2. Security Testing
Security testing ensures the SAP security roles and authorization roles provided based
on the requirements. Test IDs will be created of different job roles and used to both confirm what
a user can do and what a user cannot do. The tester will perform both Positive and Negative
testing of the of job roles that are assigned to user test ids.

3. Integration Testing
In a multiple plat form environment integration testing is mandatory .All integrated areas
need to test by a tester. It is testing of SAP transactions (for example , Hr is integrated with Sales
and distribution(creation of order and raise a invoice for billable resources, HR is integrated with
Controlling or Project system, you need to test all accordingly.

4.Parallel Testing
During parallel testing all the existing data in the legacy system will transfer to SAP
system & perform same process in both systems. A successful Parallel test shows identical results
when both the legacy system and new system results are compared. Tester will run the programs /
transaction repeatedly in both system , resolve issues with the help of other team if any issues,
continue perform tests till gets the identical results in both. Example : Parallel payroll process.
Run payrolls in SAP & legacy system for 2-3 months & analyze the payroll results

5.User Acceptance Testing(UAT)


User Acceptance testing is conducted in by a group of business end users to validate
that the new developed SAP system meets all requirements. During User acceptance testing the
system end users separately execute test cases & find out the results are as expected. The test
team will guide the UAT team in their testing activities. UAT will ensure that the system is
acceptable from the users perspective, performing as per the requirement & if the users are
satisfied they provide a sign off.