MATERIAL LIST

GUYED MAST TOWER 3LG 72M

SN

Mark no.

Project for

Site Name
Site ID
Revision

:
:
:

Rev
dwg

Profile

PT.TRANSPORTASI GAS INDONESIAIssued Data


SAKERNAN
Prepared by
Checked by
C
Length

Grade

12/23/2013

:
:

Nuh.A
Nurshahib

Weight
kg/m
kg/pc

Qty

Perunit
Weight

PLATE
1 PL1

PL

56

100

SS400

2.64

0.26

66

2 PL2

PL

63

100

SS400

2.97

0.30

1.78

3 PL3

PL

57

100

SS400

2.68

0.27

66

17.72

4 PL4

PL

67

100

SS400

3.16

0.32

1.89

5 PL5

PL

59

100

SS400

2.78

0.28

66

18.34

6 PL6

PL

67

100

SS400

3.16

0.32

1.89

7 PL7

PL

60

100

SS400

2.83

0.28

66

18.65

8 PL8

PL

60

100

SS400

3.77

0.38

2.26

9 PL9

PL

16

160

160

SS400

20.10

3.22

9.65

10 PL10

PL

16

160

160

SS400

20.10

3.22

18

57.88

11 PL11

PL

16

175

175

SS400

21.98

3.85

11.54

12 PL12

PL

16

175

175

SS400

21.98

3.85

18

69.24

13 PL13

PL

16

195

195

SS400

24.49

4.78

14.33

14 PL14

PL

16

195

195

SS400

24.49

4.78

18

85.97

15 PL15

PL

16

210

210

SS400

26.38

5.54

16.62

16 PL16

PL

16

210

210

SS400

26.38

5.54

18

99.70

17 PL17

PL

16

210

210

SS400

26.38

5.54

16.62

18 PL18

PL

10

100

670

SS400

7.85

5.26

36

189.34

19 PL19

PL

10

100

660

SS400

7.85

5.18

36

186.52

20 PL20

PL

10

100

645

SS400

7.85

5.06

36

182.28

21 PL21

PL

10

100

630

SS400

7.85

4.95

36

178.04

22 PL22

PL

100

120

SS400

6.28

0.75

24

18.09

23 PL23

PL

12

150

400

SS400

14.13

5.65

Sub Total :
B

17.41

33.91
1,249.65

PIPE

24 P1

PD

1.5"

2976

SCH40

4.10

12.20

36.60

25 P2

PD

1.5"

2984

SCH40

4.10

12.23

15

183.52

26 P3

PD

2"

2984

SCH40

5.44

16.23

18

292.19

27 P4

PD

2.5"

2984

SCH40

9.12

27.21

18

489.85

28 P5

PD

3"

2984

SCH40

11.34

33.84

15

507.58

29 P6

PD

3"

2976

SCH40

11.34

33.75

101.24

30 P7

PD

2"

1000

SCH40

5.44

5.44

Sub Total :
C

32.64
1,643.63

ROUND BAR

31 RB1

16

4860

SS400

1.58

7.68

18

32 RB2

16

655

SS400

1.58

1.03

90

93.14

33 RB3

16

4825

SS400

1.58

7.62

18

137.22

34 RB4

16

645

SS400

1.58

1.02

90

91.72

35 RB5

16

4740

SS400

1.58

7.49

18

134.81

36 RB6

16

630

SS400

1.58

1.00

90

89.59

37 RB7

16

4640

SS400

1.58

7.33

18

131.96

38 RB8

16

620

SS400

1.58

0.98

90

Sub Total :
D

88.16
904.82

Bolt and Nut

39 Bolt+Nut+Sw+Fw

M16

75

8.8

0.1809

276

Sub Total :
Total
E

138.22

Waste & Galvanize (10%)

49.93
49.93
3,798.10
379.81

Grand Total :

Checked by.

Nurshahib Usmanto
Director

4,177.91

Guyed Mast Tower 3LG 72M Project 2013


Site ID
Vendor
Project
Site Name
Tower Height
Scope of Works
Project Manager

:
:
: Guyed Mast Tower 3LG 72M
: Sakernan
: 72M
: Guyed Mast Tower and Foundation
:
Issued Date : 12/23/2013

No
I

II

Item Works

Site Preparation
1 Site Survey
- Java
- Outside Java
- Islands
2 M obilization dan Demobilization
- Java
- Outside Java
- Islands
Steel Material Tower
1 Steel M aterial and Fabrication
- Plate, Round Bar and Pipe Included Bolt, Nuts and Washer
- Plate and Angle Included Bolt, Nuts and Washer
2 Delivery
3 Galvanizing (Hot Deep and Cold Galvanizing)
4 Erection
5 Painting

Qty

Unit

1.00
-

Ls
Ls
Ls

1.00
-

Ls
Ls
Ls

Amount IDR

Comment

6,000.00
6,000.00
6,000.00
6,000.00
6,000.00

kg
kg
kg
kg
kg
kg

Ls
Ls

IV Base Frame Shelter of Works


1 Base frame WF - 200 x 100 x 5.5 x 8 (Hot Deep Galvanized)
2 HILTI + Chemical Fishes M 16mm - 240mm

kg
set

132.00
-

m3
m'
set
set
set
set
set
set
set
set
set
m'
m'
point
m2
point
m2
point
kg

pcs
pcs
pcs
pcs
pcs
m'

Foundation Tower Strengthening of Works


Concrete pouring with reinforcement steel bar (included excavation and compaction)
Foundation Bore Pile diameter 40 cm
HILTI - HIT RE - 500 (with rebar) / Fisher FIS380C
HILTI HVU+HAS-N (8.8) M 20-280
HILTI HIT RE 500
HILTI HIT RE 500 HAS E-F (M 16-150mm)
HILTI - HVU - HAS - E - F (M 16 - 500mm)
HILTI - HVU - HAS - E - F (M 20 - 300mm)
HILTI - HVU - HAS - E - F (M 24 - 290mm)
HILTI - HVU - HAS - E - F (M 27 - 340mm)
Chipping existing footing / building floor (Included water profing)
Casing Concrete Diameter 80cm -100cm (M aterial)
Short Well Digging Diameter 100cm (Excavation)
SIKAGROUT 214 -11 Injection (Zak@25 kg) Grouting
SIKATOP 107 - SEAL (Zak@25 kg) Waterproofing
SIKADUR - 31 - (Zak@6 kg/set) Coring
SIKADUR - 752 - (Zak@10 kg/set) Crack
Welding
M oving M aterial Tower for Extend & Strengthening Included Accessories to Roof Top Building
M oving M aterial to Roof Top Building
- Poles 3 meter Included Accessories
- Poles 6 meter Included Accessories
- Poles 9 meter Included Accessories
- Poles 12 meter Included Accessories
- Poles 15 meter Included Accessories
21 Guy Wire dia 10mm Included Accessories

Total Price IDR

III Finishing of Works


1 Site Recondition
2 Dock for ATP and Site Binder (BAST)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Unit Price IDR

Guyed Mast Tower 3LG 72M Project 2013


Site ID
Vendor
Project
Site Name
Tower Height
Scope of Works
Project Manager

:
:
: Guyed Mast Tower 3LG 72M
: Sakernan
: 72M
: Guyed Mast Tower and Foundation
:
Issued Date : 12/23/2013

Item Works
No
22 Guy Wire dia 12mm Included Accessories
- Guy Wire dia 12mm (IWRC)
- Cable Clamp / Wire Clip for Wire M 12 (Gunnebo)
- Turnbucle Eye and Eye M 12 (Gunnebo)
- Thimble (Gunnebo)
- Steel Cable End Crimp Shoe (IWRC)
- Steel Wire Turnbuckle Anti Rotation Loop M 6 (IWRC)
- Cable Clamp / Wire Clip for Wire M 6 (Gunnebo)
- Shackle(Gunnebo)

Qty

Unit

1,056.84
144.00
24.00
48.00
48.00
6.00
12.00
24.00

VI Supply, Delivery and Install Antenna Mounting (FR + MW)


1 Supply, Delivery and Install Antenna M ounting 3 Sectoral for poles included U-bouts, nuts, bouts and washer
2 Supply, Delivery and Install Antenna M ounting 1 Sectoral for poles included U-bouts, nuts, bouts and washer

set
set

VII
1
2
3
4
5
6
7
8
9

set
m'
m'
pcs
pcs
m'
m'
Ls
Ls

VIII

Supply, Delivery and Install Grounding System


Splitzen + Aluminum 60 mm
Steel Cable Wire 80mm
AAC 70mm2 (Aluminum)
Copper Lightning Arrester 30 cm
Aluminum Busbar 300mm x 50mm x 8m
PVC Pipe 1'' (Inch)
PVC Pipe 1'' Flexible 1'' (Inch)
Repositioning Lightning rod and Support
Repositioning OB-Light and Support

Unit Price IDR

Total Price IDR

Amount IDR

Comment

m'
pcs
pcs
pcs
pcs
pcs
pcs
pcs
-

Miscellaneous of Works
1 Concrete Works (K-225 With SK SNI 03.2002 Standard) Include Volume of Bored Pile
2 Steel Weight (SNI 07.2052 1990/JIS G-3112 Standard)

38.296
4,972.222

m3
kg

Grand total Included Overhead + Profit


Rounding

PT. TGI

Vendor