SN
Mark no.
Project for
Site Name
Site ID
Revision
:
:
:
Rev
dwg
Profile
Grade
12/23/2013
:
:
Nuh.A
Nurshahib
Weight
kg/m
kg/pc
Qty
Perunit
Weight
PLATE
1 PL1
PL
56
100
SS400
2.64
0.26
66
2 PL2
PL
63
100
SS400
2.97
0.30
1.78
3 PL3
PL
57
100
SS400
2.68
0.27
66
17.72
4 PL4
PL
67
100
SS400
3.16
0.32
1.89
5 PL5
PL
59
100
SS400
2.78
0.28
66
18.34
6 PL6
PL
67
100
SS400
3.16
0.32
1.89
7 PL7
PL
60
100
SS400
2.83
0.28
66
18.65
8 PL8
PL
60
100
SS400
3.77
0.38
2.26
9 PL9
PL
16
160
160
SS400
20.10
3.22
9.65
10 PL10
PL
16
160
160
SS400
20.10
3.22
18
57.88
11 PL11
PL
16
175
175
SS400
21.98
3.85
11.54
12 PL12
PL
16
175
175
SS400
21.98
3.85
18
69.24
13 PL13
PL
16
195
195
SS400
24.49
4.78
14.33
14 PL14
PL
16
195
195
SS400
24.49
4.78
18
85.97
15 PL15
PL
16
210
210
SS400
26.38
5.54
16.62
16 PL16
PL
16
210
210
SS400
26.38
5.54
18
99.70
17 PL17
PL
16
210
210
SS400
26.38
5.54
16.62
18 PL18
PL
10
100
670
SS400
7.85
5.26
36
189.34
19 PL19
PL
10
100
660
SS400
7.85
5.18
36
186.52
20 PL20
PL
10
100
645
SS400
7.85
5.06
36
182.28
21 PL21
PL
10
100
630
SS400
7.85
4.95
36
178.04
22 PL22
PL
100
120
SS400
6.28
0.75
24
18.09
23 PL23
PL
12
150
400
SS400
14.13
5.65
Sub Total :
B
17.41
33.91
1,249.65
PIPE
24 P1
PD
1.5"
2976
SCH40
4.10
12.20
36.60
25 P2
PD
1.5"
2984
SCH40
4.10
12.23
15
183.52
26 P3
PD
2"
2984
SCH40
5.44
16.23
18
292.19
27 P4
PD
2.5"
2984
SCH40
9.12
27.21
18
489.85
28 P5
PD
3"
2984
SCH40
11.34
33.84
15
507.58
29 P6
PD
3"
2976
SCH40
11.34
33.75
101.24
30 P7
PD
2"
1000
SCH40
5.44
5.44
Sub Total :
C
32.64
1,643.63
ROUND BAR
31 RB1
16
4860
SS400
1.58
7.68
18
32 RB2
16
655
SS400
1.58
1.03
90
93.14
33 RB3
16
4825
SS400
1.58
7.62
18
137.22
34 RB4
16
645
SS400
1.58
1.02
90
91.72
35 RB5
16
4740
SS400
1.58
7.49
18
134.81
36 RB6
16
630
SS400
1.58
1.00
90
89.59
37 RB7
16
4640
SS400
1.58
7.33
18
131.96
38 RB8
16
620
SS400
1.58
0.98
90
Sub Total :
D
88.16
904.82
39 Bolt+Nut+Sw+Fw
M16
75
8.8
0.1809
276
Sub Total :
Total
E
138.22
49.93
49.93
3,798.10
379.81
Grand Total :
Checked by.
Nurshahib Usmanto
Director
4,177.91
:
:
: Guyed Mast Tower 3LG 72M
: Sakernan
: 72M
: Guyed Mast Tower and Foundation
:
Issued Date : 12/23/2013
No
I
II
Item Works
Site Preparation
1 Site Survey
- Java
- Outside Java
- Islands
2 M obilization dan Demobilization
- Java
- Outside Java
- Islands
Steel Material Tower
1 Steel M aterial and Fabrication
- Plate, Round Bar and Pipe Included Bolt, Nuts and Washer
- Plate and Angle Included Bolt, Nuts and Washer
2 Delivery
3 Galvanizing (Hot Deep and Cold Galvanizing)
4 Erection
5 Painting
Qty
Unit
1.00
-
Ls
Ls
Ls
1.00
-
Ls
Ls
Ls
Amount IDR
Comment
6,000.00
6,000.00
6,000.00
6,000.00
6,000.00
kg
kg
kg
kg
kg
kg
Ls
Ls
kg
set
132.00
-
m3
m'
set
set
set
set
set
set
set
set
set
m'
m'
point
m2
point
m2
point
kg
pcs
pcs
pcs
pcs
pcs
m'
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
:
:
: Guyed Mast Tower 3LG 72M
: Sakernan
: 72M
: Guyed Mast Tower and Foundation
:
Issued Date : 12/23/2013
Item Works
No
22 Guy Wire dia 12mm Included Accessories
- Guy Wire dia 12mm (IWRC)
- Cable Clamp / Wire Clip for Wire M 12 (Gunnebo)
- Turnbucle Eye and Eye M 12 (Gunnebo)
- Thimble (Gunnebo)
- Steel Cable End Crimp Shoe (IWRC)
- Steel Wire Turnbuckle Anti Rotation Loop M 6 (IWRC)
- Cable Clamp / Wire Clip for Wire M 6 (Gunnebo)
- Shackle(Gunnebo)
Qty
Unit
1,056.84
144.00
24.00
48.00
48.00
6.00
12.00
24.00
set
set
VII
1
2
3
4
5
6
7
8
9
set
m'
m'
pcs
pcs
m'
m'
Ls
Ls
VIII
Amount IDR
Comment
m'
pcs
pcs
pcs
pcs
pcs
pcs
pcs
-
Miscellaneous of Works
1 Concrete Works (K-225 With SK SNI 03.2002 Standard) Include Volume of Bored Pile
2 Steel Weight (SNI 07.2052 1990/JIS G-3112 Standard)
38.296
4,972.222
m3
kg
PT. TGI
Vendor