16.
How do I choose a following package, so i can be registered on
bidders list for the desired location?
Answer:
With uploading the bidding documents at desired packages, so
paticipant will be registered automatically in the package
17.
How about writing format of bidding price?
Answer:
Writing of bidding price is up to 2 digits behind the comma. Eg: 23,25
Cents USD / kWh
18.
Is the new company still must attach financial statement?
Answer:
Yes, the new company still attach financial statement
19.
Related to the consortium, leader and share distribution in
consortium?
Answer:
Foreign companies are able to register by doing a consortium with local
company. Leader of a consortium to be local companies. Share
Distribution is according to consortium agreement and consortium
capability.
20.
How about permital process for construction phase?
Answer:
The whole process of licensing issued in the framework of the project
development is business entitys burden. Licensing procedures refer to
the applicable rules and regulations.
21.
How about technical evaluation of all equipment used in the
project?
Answer:
In accordance with the evaluation procedures set out in the tender
documents
22.
How long is allowed from power plant to interconnection point, 5
Km or 10 Km?
Answer:
Interconnection which more than 5 km, then loses after 5 km up to
interconnection point will be paid by business entity
23.
Related to additional time to submit the bidding documents.
Answer:
The committee considers that the established time is enough for any
business entity to prepare all required documents. However, if the
committee think that theres a need to add more time, so it will be
announced later through the website.
24.
Can PV manufacturers and others give more than 1 support?
Answer:
Yes, manufacturers can give more than 1 support
25.
Can authorized agent of foreign products provide support?
Answer:
Yes, Sole agency authorized to provide support
26.
Is the distributor can issue a letter of support?
Answer:
Applicable letters of support from manufacturers or sole agent with
specified format in tender documents
27.
What currency will be used by PLN for paying ?
Answer:
PLN will pay with Rupiah currency, by converting the exchange rates
prevailing at the time of payment.
28.
How if there is a delay in COD?
Answer:
COD delay provisions was stipulated in ERM Ministry Regulation No.
17 / 2013. In the event of agreement expiration, rights and obligations
must be settled in accordance with applicable regulations
29.
What if there is a damage on bidding document ?
Answer:
Incoming bidding document will be backed up automatically. If there
are corrupted files, then it will be taken from back up files stored.
30.
Related to core personnel required, Is it able for employer
reference letter to be replaced with a certificate from the association?
Answer:
Work reference letters can not be replaced with the letter given by the
association
31.
Currently there is no local company who has experience IPP solar
panels. Should not be required when there is a need for a partner or
experienced consultant?
Answer:
The committee did not obligate companies have solar panels IPP
experience
32.
In what year financial statements presented in the bidding
documents?
Answer:
Audited financial statements for the last year
33.
Can participants entering 2 offers?
Answer:
Participants may only enter one quote for the work packages, but
participants can participate in more than one package of quota
auctions
34.
Is DED format can be different?
Answer:
DED format should be in accordance with the format in the tender
documents
35.
What form of CSR should be provided within the project?
Answer:
CSR is given to be adapted from each area regulations
36.
Are all supporting documents must be given any explanation by
using Indonesian language ?
Answer:
Yes, the supporting documents need to be briefed in Indonesian
37.
In correlation with required certification of inverter
Answer:
Certificates for inverter which specified in the tender documents must
be fulfilled
38.
In correlation with company administration data submission
Answer:
Entire company both leader or KSO members must fill company
administration data. For foreign companies, data can be customized.
39.
Does company partner which only as a sub-contractors need to
use KSO?
Answer:
If only hired as sub-contractors, so it does not need to use the KSO
40.
Is it okay if two companies use the same vendor in one package
auction?
Answer:
Yes, it is able to use same vendor
41.
Is the auction participants can use experts from sub-contractors?
Answer:
Company of bidders are required to have experts as required in the
tender documents
42.
If electricity network infrastructure in PLTS location is still running
by local government as under construction, Will the auction for this
region still be implemented.
Answer:
PLTS quota project does not have relationship with local government
infrastructure projects
43.
Is the auction participants are required to have the land first?
Answer:
Participants are not required to own or rent land proposed as power
60.
What date is the minimum limit of bidding security applied?
Could it be more than 14 days after estimated time of PPA Signing or
should be exactly on that date?
Answer:
The bidding security have been applicable since bids submission
deadline (12/12/2013) up to 14 working days after PPA Signing (more
than 14 days are allowed)