10- EXTERNALWORKS
BILL
10/ 16
Unit
I
I
- cont'd
A 0 WATERDRAINAGE
DETENTroN P0ND
Bulkexcrvationfor detention
pond anddischargeoutletandget out,
sidestap ring, compactand remove surplusmaterialsoff site to
Contract<'s owndump.
1272
MC
435
MS
Vibratedreinforcedconcrete
(Grade25) as described
frlled into
formworl and well packedaroundst,gelreinforcement
(form\ilork
andsteelneasured
separately
) in:
Drain
l3
MS
Approl
planted
Supply
t37
\I/ominc
Qimlr^a.d
fnr
T\o+zra+i^-
D^-,1
--,1
ground,asper Engineer'sdetail
II
I
I
I
I
NO
ITEM
ln eniqtino drain
To Colleotion
NO
10/18
10. EXTERNALWORKS
t22 MR
1200mmdeepbut not exceeding1500mmdo
219 MR
1 5 9 MR
l800mrn
D
Ditto
25Omm
bends,
1800mmdeepbut nottxceeding2100mmdo
pipe
sandbeddingundersewerr
clay(VC)pipesandfittingto Sirimapprovedcomplete
junctions,diminishingpieces,flangesandjoints and
48
MR
r37
MC
416 MC
atu
10/1 9
Unit
IO - T;XTERNALWORKS
.|
Diametercirculardrop manJhole
constructedof 150ryn
(Grade25) as describedbasereinforcedwith trvo
65, 150mmthick r.c. wall reinforcewith one laver
course225mmttrickbrickwall, 16mmthick high
ing on all inside faces, l50mm thick r.c. top
with onelayerof BRC 61, massconceteto place
50mmthick lean concrete(Grade l5), standmd
iron stepsstaggered
at 300nuncentreswith 87.5mmcast
fornr openingsat wall for: inflow and outflow
andincludingall excavation,
partbackfill,
of surplusexcavated
materials,concretebenching,hal
W chrannel,
90 degree C.I. bend with mass
tee, formwork,forming alll outletsandconnections
works as detailed in E:ngineer'sdrawing. (Manhole
separately)
Drop
to invert
Drop
to invert
le exceeding
l800mmbut not exceeding
2l00mm
NO
e,xceeding
2l00mm but not exceeding
2400mm
NO
Rate
Antount
(RM)
ae.
BILL N
10t20
Uu!
NO
ll
NO
hinges
a frameto JKRstandard
detailandrequirements
and
framein
ing andpointingin cementandsand(l:3) andsealirrg
coverin
andfinesandcompletewith protectivecoating.
NO
hlnges
fiamein
coverin
Amounl
(RM)
IO.EXTERNAL
WORKIJ
Diametercircularmanholeconstructedof l50mm th
con0rete(Grade25) asdescrlbedbasereinforcedwith two
lavero
BRC65 l50mrnthick r.c. wall reinforcewith one layerof BRC
course225mtnthick brickwall,l6mm thick hish alumina
on all insidefaces,150mmthick r.c. top slab
layerof BRC 61,massconcre[eto placecovercorrectI
ick leamconcrete(Gradel5), standardU shapecast
at 300mmcentreswith 8?.5mmcastinto walls.
at wall for inflow andoutflow pipes,rebatedopening
all excavation,part backfill, removal and disposal
materials,concretebenching, formwork,fornr
and connections
and all necessaryworks as detailerl
drawing.(Manholecovermeasured
separately)
invert
Rate
I
I
To Collecti,on
:
NO
t
I
l
10t21
Alnount
-T-_
IRM)
lO.EXTERN
hleatrnentoiant svstem-
piling works,mechanic
I works,,
gates,aNcess
road andetc,as
andsubj$ctto Engineet's
approv
t
t
10t22
ae.
Unit
IO - I],XTERNALWORKT;
l60mm
64
HDPEinletpipe(PN-l2.5)
andfitrings
including
anchor/thrust
block,diministringpieces,flanges,joints,
puddle llar,m.s.brackets,pipeholderandall necessary
andconnection(To Elevatedwatertank)
llOmm
:uo MR
30
trench)
llOmm iamel,erHDPE pipe (PN-12.5)Iaid in trench
well compactedsandor gSanular
material,part
of surplusexcavatedmaterialsfrom site (Typical
hench
roadcrossing)
llOmm
HDPEinletpipe(flrt-Ii.s) andfitringsincluding
anchor/thrust
block,diminishingpieces,fl anges,
joints,
puddle ar,rr.s. brackets,pipeholderandall necessary
andconnection(FromElevatedwatertank)
llOmm
8 NO
ametr:rHDPEscour& overllowpipe andfittings
all berrds,anchor/thrust
block,diminishingpieces,flangps,
collar,m.s.brackets,pipeholderandall necessary
andconnection(dischargecl
to nearestdrain)
t
I
!
*
I
Allow
interconnection
pipeandvalvesbetweenwatertanks.
for p,ipejackingworks(accross
mainroad)for I 60mnr
HDPEconnectto existingwatergovemment's
mainsupply
I
t
30 MR
To Collection:
Rate
10t23
Qil,
BILL
ll valves
Ilnit
IO- TIXTERNALWORKS
be':onstructed
in accordance.
with theEngineer's
Drawing:s
strictlywith therequirements
of theLocalAuthorities.
thef<tllowing
itemsonvalveand chamber
be made to the relevant drawings for details
lve and
valve
r,lruumm
x /)urnmx lJ)unm oeepnternauy
of l20mmthickconcrete(Grade25) asdescribedbase
,with t'ro layerof BRC ,{6 orAS at l50mmc/c, 120mm
reirnforced
with lOmmdiameterm.s.reinforcement
trar
centresbothway,bituminfill, 50mmthickleanconcrete
GradeI ) blinding,225mmthicksolidbrickwallfinishedwith
(1:3)plastering
on bothsides,3l0mm x 457mmcast
dutysiurface
box coverchainedtype,lifting hook,mass
concrete
(320) with l2mm diameterm.s.boltswith and
luding ll excavation,
excavation,
parrtbackfill,removaland
isposal surphlsexcavated
materials,concretebenching,
andformingoutletssealwith biturninous
sealing
NO
NO
x 900mmlongflangespigotpiece,both end
jointingto valveandpipesincluding50mm
strap,concretesupport,form:ingopeningin
I andsealingin bituminouscompound
NO
sluicevalveindicatorplanteclinto ground,asper
detail
NO
To Collectiion:
Rate
Amount
(RM)
ae
BILL
10t24
Unit
10 - TIXTERNALWORKS
]ULATIONSYSTEM
PILLAR YDfu|NTVALVES
AND CITAMBERS
fire
When
the
Hydrant alveClhamber
900inmx 750nrmx l350mmdeep
intemal consisliing
of 120mmthick concrete(Grade25) as
basen:inforcedwith two laverof BRC A6 or A8 at
l20mmthicktop slabreinfrrrcedwith lOmmdiameter
rem,nt
barat 100mmcentresbothway,bituminfill,
leanconcrete(Grade15;blinding,Z25mmthicksolid
finisherd
with cementsand(l::3) plasteringon bothsides,
508mrncastiron heavydutysiurface
box coverchained
plinth (G20)with 12mmdiameter
hool<,massconcrete
part
with andincludingall excavation,
excavation,
val anddisposalof surplusexcavated
materials,
formworksandformins outletssealwith
NO
sealine comoound.
l00mm
l00mm
castiron hydrantsluicevalvecompletewith
l, e.rtended
valvespindle,,rerticalshortpieceflanged
andjoints to pipes:includingfixing
NO
NO
x 900mmlongflangespigotpieceendflahged
to'valveandpipesincludingformingopeningin
wall andsealingin bituminouscompound
l00mm
x 90 degreeduckfoot bend,both endflanged,
(Grade20) seating,
in andincludingmassconcretr3
leaving iectiions
atbothends
fire hydrantindicatorplantedinto ground,asper
detail
and
To Collection:
NO
Rste
Amou!!
(RM)