Standard Value calculation Via CAPP- an
Overview
created by Mohan raj Natarajan on 18-Apr-2014 11:07, last modified by Mohan raj Natarajan on 21-Apr-2014 08:51
Version 2
inShare
Applies to:
Standard values are used in scheduling, capacity planning and costing to determine dates,
capacity requirements and costs. Standard values can be determined in several ways:
sampling and statistical procedures for determining times (for example, period
time sheets)
Business scenario:
Let us take a simple Business scenario in a company. For a new product, company has
commissioned a new drilling machine (work center). So Product routing will have drilling
operation which will be carried out in the new drilling machine. Company requested to do
standard value calculation via CAPP method for setup and Machining and also needs to be
updated in Routing using Engineering formula.
Calculation sample from Engineering:
1.
Setup time = Basic time + ( Number of Tools * variable time ) with 10%
Excess factor
So Final setup time formula = (Basic time + (Number of tools *variable time)) * 1.1
Ex: Set up time = (10 + (2 *5)) * 1.1 = 22 min
2.
A. Configuration:
A.1 Work center Setting:
IMG path:
Production --> Basic data --> work center --> setup work center sequence
Activate Technical data tab for work center category say 0001
b.Value Type ( Mapping of value type to Standard value parameter Important one ) :
c.Planner group :
d.Control Parameter
Pre requisite:
Master Data:
1. CAPP Formula (Tcode: CE11):
Create Engineering Formula as per requirement for both setup & Machining. Refer below
Create or Update work center (CAPP01) with Technical data in Technology tab
Additional values or rounding is not mandatory
No of Processes must be minimum 1. For initial setup , assign process as defined
below
After assignment of processes , click consistency check. There should not be any error .
Now create routing for the material and assign above work center CAPP01
Check operation details You will find setup or machine std value is blank
initially
Execution of Capp :
1. Simulation:
Main Purpose of simulation is to verify and validate CAPP formula, method, process and its
calculation are correct and in sync.
This is to ensure standard value calculation for either machine time or setup time or any time
is being done @ work center as per engineering calculation
Tcode: CE41
Enter dummy or trial values in the fields and click next screen
System will show processes assigned to work center. Select all processes and click next screen
Enter expected values for calculation and click to next screen till end
Finally, you will get message Last selected process xxxx has been completed and save it as
below
Result:
Now check operation in routing where you find values of setup and machine
updatedautomatically .
Also , you can note calculation type and year calculated is also updated for
Referance under "determination of std values"
If you dont want to recalculate standard values again during production order creation,
keep capp order as blank in Routing header. In simple words, standard values available
in routing operation will be retained in production order
Check standard values Tab in operation. CAPP values in Routing is copied without any change
If in case you want to change standard values while creating production order due to any
reason , then link between routing to production order has to be established . This means,
when order is created, system will propose standard values with fields for user to change and
save new value in order
Master data setup for linkage change Routing header > CAPP ORDER Field as 2 as
below
Now create production order via co01, system will pop up screen with current standard values .
Same can be done for another formula also with new values if needed .
Result:
1.
Refer system status - CAPP which means std values calculated via CAPP
*** CAPP calculation which is carried out for the order above will not change routing master
values.
This concludes the complete cycle of CAPP scenario in PP.
CAPP calculation of standard values can be done for Routing or Ref operation set
Standard values calculation can be done automatically if process & method marked
standard indicator.
Capp calculation can be done for variant configuration also for operation
If SVK is missing in work center , standard values calculation cannot be carried out
Sub operation standard values can also be calculated.
You cannot calculate value types for standard values if it was specified in the work
center that they must not or should not be entered
If the base quantity of the operation deviates from that of the method, then the method
result calculated is converted to the base quantity of the operation during a standard value
calculation.
Conclusion:
In General, CAPP is an excellent method for calculating standard values of each work center
during initial setup of production line. This CAPP tool can be used for initial simulation &
freezing final value by trial and Error. Computer-aided process planning is a link between
design and manufacturing in a computer-integrated manufacturing environment. Commonly
used by manufacturing engineers, CAPP can be used to develop a product manufacturing plan
based on projected variables such as cost, lead times, equipment availability, production
volumes, potential material substitution routings and testing requirements.
However, usage of CAPP tool in sap looks very limited or might be not explored by customer in
big way . Still reason is unknown!!!
227 Views Tags: capp
C
omments
3 Comments
Hi Mohan,
Good document and well explained. Keep sharing
Regards,
Narresh
Like (0)
Sahil Bhardwaj 10-Jun-2014 13:48
Hello Mohan,
Thanks for sharing the document, very informative