REGION
PROJECT SITE
PROJECT IN CHARGE
CONTRACT CODE
DATE
Note : Log sheet shall be maintained since commencement of the project till the completion
Total cumulative Defects till date
Status of NCR
For the month of
Total No.of
Sl.
No.
Reinforcement Laying
Concrete - Mixing
Concrete - Placing
Concrete - Vibration
Concrete - Honeycombing
Shuttering
Mobilisation
10
11
Curing
12
13
14
Construction Joint
15
16
Waterproofing
17
Surveying
18
Record Keeping
19
20
Planning
21
Stores
22
23
24
Any Other
cumulative
Defects
TOTAL
CONTRACT CODE
PROJECT SITE
DATE
PROJECT IN CHARGE
DEFECT CONTROL
Sl.
No.
Causes of problem /
Root Cause
Date: 06/02/2012
Location: B5 - 10th Floor
Sub: Concrete
rejection
Date: 23/02/2012
Location: D1 - 9th to 10th
Floor column and 11th to 12th Floor
column
Sub: Setting of column concrete
Date: 23/02/2012
Location: 8th to 9th Floor
Sub: Column
casted is not as per the structural
drawing (dimension).
REGION
CONTRACT CODE
PROJECT SITE
DATE
PROJECT IN CHARGE
DEFECT CONTROL
Sl.
No.
Causes of problem /
Root Cause
Date: 25/04/2012
Location: D1 - 9th Floor, Staircase 7
Sub:
Non providing of reinforcement dowels
for midlanding beam.