ItemDesc.
1-1
1-2
Page 1 of 26
Unit
Qty
Unit Price
ID
ML
420
18,000
KmL
0.5
30,000,000
Cu.M
800
15,000
Sq. M
3,500
17,000
1430
5,000
783
700,000
Sub Total 1
2
2-1
2-2
Bridge Construction
Excavation in all kinds of soil including rock:This item executed according to the lines, grades &
dimensions, for the foundations of abutments, piers
and retaining wall, this item including dewatering
Cu.m.
the trench, grading and well compacting final
excavated surface according to instruction of site
engineer. The price include backfilling excavation
beyond limit of excavation with structure backfill
and well compacting.
Concrete work: The concrete work includes supply
of materials (cement, sand, crushed aggregate,
water, steel bars, labor, shuttering, curing after
casting, specified slump test. Where compression
strength has been defined, all necessary additional
admixture) Mix design for each class of concrete
should be prepared prior to starting concrete works.
Form work: (Shuttering)
Forms shall be constructed either of approved wood
or steel in order to conform the shape, line, grade,
external face must be fair faced and have sufficient
strength to withstanding the pressure resulting from
placement & vibration of concrete, well touching,
tight enough not to bleeding and segregation of
concrete. All exposed corners of concrete elements
shall be chamfered 2cm unless otherwise noted. All
materials and work items should be according to the
specification, drawings, and instructions of Site
Engineer. Note: using crushed aggregate or crushed
stone is mandatory for all concrete work items. The
price include all type of admixture required to
achieve the specification.
a-Drilled Pier for structure:Cast in place piers
with diameter of 1.2m supply material cast
reinforced concrete having minimum cylinder
compressive strength of 300 kg/cm at 28 days age
or cubic compressive strength of 350kg/cm at 28
days age, ( the cost includes provision and fixing of
reinforcing steel bars and fixing of needed spacer
according to the drawings and the requirements of
section B4 (clause B4-05) of the Iraqi Standard
Specification For Roads & Bridges issued in 1983
and its comprehensive amendment issued in July
1999 and instructions of Site Engineer). (the
pricealso includes cost of pier test to determine
actual pier bearing capacity and driven length,
accordingly the precies number and length should
be determined. and the price include the excavating
of shaft to the disired depth.
Page 2 of 26
M.L
Cu.m.
90
130,000
Cu.m.
600
300,000
Cu.m
450
330,000
Cu.m
40
450,000
Cu.m
45
360,000
Cu.m
100
300,000
Cu.m
185
280,000
Cu.m
270
275,000
Cu.m
330
800,000
M.L
85
50,000
Page 3 of 26
2-3
No.
76
500,000
2-4
M.L
150
120,000
M.L
42
750,000
M.L
22
1,000,000
2-5
2-6
2-7
M.L
140
85,000
2-8
ML
45
20,000
3-1
Cu.M
450.0
5,000
3-2
Cu.M
35.0
130,000
3-3
Cu.M
260.0
280,000
Sub Total 2
3
Page 4 of 26
3-4
Cu.M
280.0
350,000
3-5
Cu.M
150.0
15,000
Sub Total 3
4-1
ML
435.0
225,000
4-2
ML
160.0
280,000
4-3
ML
85.0
350,000
Sub Total 4
Earth work: Suply materials and Construct the road
5
5-1
LS
1.0
25,000,000
5-2
Cu.m
42,960
3,500
Page 5 of 26
5-3
5-4
5-5
223,730
6,000
1,260
9,000
28,660
500
Cu.m
9,160
20,000
Cu.m
2,980
25,000
Cu.m
Sub Total 5
6-1
6-2
Page 6 of 26
6-3
Sq.M
24,420
1,000
22,900
25,000
Sq.M
22,900
1,000
Sq.M
21,950
16,000
Sq.M
21,950
1,000
Page 7 of 26
6-5
Sq.M
21,350
10,000
Cu.m
5,740
20,000
ML
210
80,000
ML
3,400.0
80,000
Sub Total 6
7
7-1
7-2
Page 8 of 26
No.
25
180,000
No.
10
180,000
No.
10
180,000
No.
60
100,000
No.
40
30,000
No.
180,000
ML
7,030.0
5,500
ML
1,075.0
4,000
Page 9 of 26
No.
42.0
30,000
m3
375.0
8,000
M.L.
4,500.0
20,000
No.
13.0
90,000
No.
1.0
400,000
No.
6.0
25,000
Sub Total 7
8
8-1
Interchange Lighting
Civil Work
Excavation note: Excavation must be kept away from the
existing trees,and great care must be taken not to damage
any existing cables,sewer or water pipes whether indicated
or not if any cable or pipe is damaged due to excavation it
is the contractor responsibility to make whatever
amendment is required to reinstate and re-fix the damaged
cable or pipe immediately without any delay and on his
expense whatever the cost, incase of failure to do so
G.D.o.E will do the required without prior warning to the
contractor and will deduct the cost from the contractors
payment.
8-1-1
Page 10 of 26
8-1-6
No.
10.0
45,000
8-1-7
ml
625.0
750
m3
103.0
25,000
No.
4,275.0
900
m3
15.0
250,000
m3
220.0
8,000
ml
125.0
15,000
ml
2,000.0
30,000
set
2.0
400,000
set
2.0
400,000
each
1.0
33,000,000
Box
1.0
40,000
8-2-6
ml
2,000.0
2,000
each
2.0
300,000
No.
4.0
4,000,000
No.
18.0
1,150,000
No.
117.0
900,000
No.
36.0
300,000
No.
117.0
250,000
No.
2.0
950,000
No.
12.0
760,000
No.
4.0
300,000
No.
12.0
250,000
Page 12 of 26
8-217
8-218
No.
153.0
8,000
No.
143.0
40,000
M.L.
4,000.0
11,000
M.L.
550.0
15,000
M.L.
450.0
5,000
M.L.
2,500.0
2,500
Sub Total 8
Grand Total
Page 13 of 26
Item Cost
ID
7,560,000
15,000,000
12,000,000
Page 14 of 26
59,500,000
94,060,000
7,150,000
548,100,000
Page 15 of 26
11,700,000
180,000,000
148,500,000
18,000,000
16,200,000
30,000,000
51,800,000
74,250,000
264,000,000
4,250,000
Page 16 of 26
38,000,000
18,000,000
31,500,000
22,000,000
11,900,000
900,000
###
2,250,000
4,550,000
72,800,000
Page 17 of 26
98,000,000
2,250,000
179,850,000
97,875,000
44,800,000
29,750,000
172,425,000
25,000,000
150,360,000
Page 18 of 26
###
11,340,000
14,330,000
###
183,200,000
74,500,000
Page 19 of 26
24,420,000
572,500,000
22,900,000
351,200,000
21,950,000
Page 20 of 26
213,500,000
114,800,000
16,800,000
###
272,000,000
Page 21 of 26
4,500,000
1,800,000
1,800,000
6,000,000
1,200,000
720,000
38,665,000
4,300,000
Page 22 of 26
1,260,000
332,245,000
3,000,000
90,000,000
1,170,000
400,000
150,000
Page 23 of 26
450,000
468,750
2,575,000
3,847,500
3,750,000
1,760,000
1,875,000
60,000,000
800,000
800,000
33,000,000
40,000
Page 24 of 26
4,000,000
600,000
16,000,000
20,700,000
105,300,000
10,800,000
29,250,000
1,900,000
9,120,000
1,200,000
3,000,000
Page 25 of 26
1,224,000
5,720,000
44,000,000
8,250,000
2,250,000
6,250,000
473,650,250
###
Page 26 of 26