be built
September 5, 2014
Neighborhood Association
Contact and address
Neighborhood Coalition
Same as above
________________________________
________________________________
________________________________
Applicant name
Contact info
don.hanson@otak.com jerry.offer@otak.com
___________________________________
September 5, 2014
File Number:
Appt Date/Time:
LU Reviews Expected_____________________________
Plan District_____________________________________
Optional
Neighborhood ___________________________________
Business Assoc__________________________________
Required
APPLICANT: Complete all sections below that apply to the proposal. Please print legibly.
Development Site
Address ________________________________
Cross Street ___________________
Site Size/Area _____________
SW Hume Street
SW Front Street
13.3 acres
128137
128138
330288
Tax account number(s) R _______________
R ________________
R _________________
128140
128139
33039, R330296,
Adjacent property in same ownership R _______________
R ______________
R _______________
R330287
Project Description - include proposed stormwater disposal methods. Attach additional sheets if needed.
23 lot Land Division with extension of SW Hume Street and creation of new segment of SW Front
_______________________________________________________________________________________________
Avenue. Environmental Review of site disturbance impacts upon Ec and Ep zoned portions of
_______________________________________________________________________________________________
the property.
_______________________________________________________________________________________________
Design Review (New development: give project valuation. Renovation: give exterior alteration value) $___________________
APPLICANT: Select an Early Assistance Type and check boxes for desired meeting/written notes options:
Meeting & written
notes provided1
No meeting,
written notes
provided
City Reviewers
Pre-application Conference2
Transportation, Environmental
Services, Water
Where a meeting is optional, an additional fee applies for the meeting in addition to written notes. Please see the
Land Use Services fee schedule for detailed fee information: http://www.portlandoregon.gov/bds/34184.
Public notice (email and internet posting) provided for Pre-application conferences and Design Advice Requests.
lu_earlyasst_app
09/01/15
Applicant Information
PRIMARY CONTACT, check all that apply
Applicant
Owner
Other ___________________________
Consultant
Name_________________________________________Company
__________________________________________
Don Hanson and/or Jerry Offer
Otak, Inc.
don.hanson@otak.com
jerry.offer@otak.com
503-415-2330
503-415-2334
Day Phone________________________FAX________________________email
_______________________________
Check all that apply
X Applicant
Owner
Other _____________________________________________
Name_________________________________________Company
__________________________________________
Randy Myers
Brownstone Real Estate Group
Mailing Address __________________________________________________________________________________
PO Box 2375
Lake Oswego
City___________________________________________
State____________________
Zip Code_________________
OR
97035
Day Phone________________________FAX________________________email
_______________________________
randy@brownstonehomes.net
503-358-4460
Check all that apply
Applicant
X Owner
Other _____________________________________________
X Two site plans, to scale, (8.5x11 inches) showing: 1) existing and proposed development; 2) existing and proposed
water, sewer and stormwater connections and facilities; 3) lot dimensions, north arrow and ground elevation
Building elevations
Additional two site plans, to scale, 11x17 inches or larger in size
NOTE:
1. Estimates for System Development Charges (SDCs) are not be provided at Early Assistance Meetings. Refer to SDC information on the BDS
website.
2. Plans examiners do not participate in Early Assistance meetings and they do not provide written comments. For life/safety and building code
questions, consult with a plans examiner in the Permit Center or schedule a Life Safety Preliminary Meeting (http://www.portlandoregon.gov/bds/
article/94545).
Questions to be discussed:
Please see attached sheet.
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
Following a pre-application conference, the summary report with web links to forms and handouts will be e-mailed to you.
If you prefer to receive paper copies, please check this box.
2
lu_earlyasst_app
09/01/15
Questions for Pre-application Conference Macadam Ridge Subdivision , Sept. 22, 2015
1. A portion of the sites northern boundary fronts on SW Canby Street in an area distant from
the area proposed for development. The applicant has no issue with dedicating additional
right-of-way in this area however, because there will be no vehicular or pedestrian traffic in
this segment of SW Canby Street related to the proposed subdivision, we question whether
street improvements in this area are warranted. In addition, the property has severe slopes.
What will City staff recommend with regard to street improvement requirements in this
area?
2. What street improvements will be recommended along the sites Taylors Ferry Road
frontage?
3. The proposed land division will not propose taking access to Taylors Ferry Road at the
location of the existing undeveloped right-of-way for SW Front Avenue. Will City staff
support not improving that section of SW Front Avenue right-of-way? We are considering
requesting vacation of that segment of the SW Front Avenue right-of-way to possibly
expand the area of proposed lot 2. Lot 2 will not need this additional area to qualify as a
buildable lot. Therefore, can the right-of-way vacation process occur completely separate
from the land division application review process? Please discuss the right-of-way vacation
process.
4. Please discuss the requirements for coordination of the public works plan submittal relative
to the land division application submittal and /or completeness determination.
5. The proposed land division application would be made without including all of the adjacent
properties owned by the Riverview Mausoleum, Co. including the two parcels that front
along NW Canby Street which were included in the earlier land division application. Are
there any City staff concerns with regard to which lots are included or excluded from the
current application?
6. Please discuss whether this land division could be approved without making a street
connection to SW Ruby Terrace via the SW Hume Street right-of-way. Could City staff
support a combination pedestrian connection and emergency vehicle access connection or
other road standard along SW Hume Street rather than a full public street connection?
7. If the City mandates a SW Hume Street connection to SW Ruby Terrace, are there traffic
calming measures that PBOT could support both within the area of this street on the subject
site as well as on off-site roads?
L:\Project\17000\17041\Planning\QuestionsforPreApp.092215.doc