G-1-1
INTRODUCTION
G-1-1.1
G-1-1.2
General
Equivalency of Standards and Codes
G-2-2
SCOPE
G-2-3
DESIGNATION OF DOCUMENTS
G-2-4
G-12-5
G-12-6
CONTROL OF WORK
G-12-6.1
Inspection
G-13-6.2
Removal of Rejected and Unauthorized Work
G-13-6.3
Equipment and Plants
G-14-7
CONTROL OF MATERIALS
G-14-7.1
General
G-14-7.1.1
Source of Supply and Quality of Materials
G-15-7.1.2
Storage of Materials
G-15-7.1.3
Defective Materials
G-16-7.1.4
Trade Names and Alternatives
G-16-7.1.5
Certificates of Compliance
G-17-7.2
Local Materials
G-17-7.2.1
General
G-19-7.2.2
Possible Local Material Sources
G-21-7.3
Testing
G-21-7.3.1
General
G-22-7.3.2
Random Sampling Method
ART 1
EARTHWORK
ITEM E
GENERAL
E-1-1
SCOPE
E-1-2
SOIL INFORMATION
E-2-3
EXPLOSIVES
E-3-4
E-3-5
E-4-6
DITCHES
E-4-7
E-5-8
E-5-9
E-5-10
ITEM CG
CG-1-1
DESCRIPTION
CG-1-2
CONSTRUCTION REQUIREMENTS
CG-1-2.1
Clearing/Grubbing
CG-2-2.3
Protection and Restoration
CG-2-2.4
Backfilling of Holes
CG-2-3
ITEM RT
REMOVAL OF TREES
RT-1-1
DESCRIPTION
RT-1-2
CONSTRUCTION REQUIREMENTS
RT-1-3
GENERAL REQUIREMENTS
RT-1-4
ITEM C
C-1-1
DESCRIPTION
C-1-2
CONSTRUCTION REQUIREMENT
C-1-2.1
Compaction Requirements
C-1-3
ITEM S
STRIPPING
S-1
DESCRIPTION
S-1-2
CONSTRUCTION REQUIREMENT
S-1-3
ITEM EX
CLASSIFICATION OF EXCAVATION
EX-1-1
EX-1-2
BORROW EXCAVATION
EX-2-3.1
Roadway Excavation in Common Materials
EX-2-3.2
Roadway Excavation in Rock Materials
ITEM EX1
EX-3-1
DESCRIPTION
EX-3-2
CONSTRUCTION REQUIREMENTS
EX-3-3
ITEM EX2
EX-5-1
DESCRIPTION
EX-5-2
MATERIAL REQUIREMENTS
EX-5-2.1
Backfill
EX-5-3
CONSTRUCTION REQUIREMENTS
EX-5-3.1
Structural Excavation
EX-8-3.2
Backfill
EX-9-4
ITEM EM
FORMATION OF EMBANKMENT
EM-1-1
DESCRIPTION
EM-1-2
MATERIAL REQUIREMENTS
EM-2-3
CONSTRUCTION REQUIREMENTS
EM-2-3.1
Formation of Embankment with Common Material
EM-3-3.2
Formation of Embankment with Rock material
EM-4-3.3
Formation of Embankment on Steep Slopes
EM-4-3.4
Formation of Embankment on Existing Roads
EM-5-3.5
Construction of Embankment in Areas of High Water levels and
Salinity Conditions
EM-6-3.6
Trial Section
EM-6-3.7
Excavation in Embankments
EM-7-3.8
General Requirements
EM-8-4
ITEM SG
SUBGRADE PREPARATION
SG-1-1
DESCRIPTION
SG-1-2
CONSTRUCTION REQUIREMENTS
SG-1-2.1
Prior Works
SG-1-2.2
Compaction Requirements
SG-1-2.3
Subgrade Level in Earth Cut
SG-2-2.4
Subgrade Level in Rock Cut
SG-2-2.5
Subgrade Level in Embankment
SG-2-2.6
Protection of Completed Work
SG-3-2.7
Templates and Straightedges
SG-3-3
ITEM-IG
IMPROVED SUBGRADE
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc
IG-1-1
DESCRIPTION
IG-1-2
MATERIAL REQUIREMENTS
IG-1-3
CONSTRUCTION REQUIREMENTS
IG-1-3.1Preparation
IG-1-3.2Proportioning of Materials
IG-2-3.3
IG-3-3.4
COMPACTION
IG-3-3.5
TRIAL SECTIONS
IG-4-3.6
IG-4-3.7
IG-4-3.8
TOLERANCE
IG-5-4
PART 2
ITEM SB
GENERAL
SB-1-1
DESCRIPTION
SB-1-2
SB-2-3
TOLERANCES
ITEM SB1
GRANULAR SUBBASE
SB-3-1
DESCRIPTION
SB-3-2
MATERIAL REQUIREMENTS
SB-4-3
CONSTRUCTION REQUIREMENTS
SB-4-3.1
Spreading
SB-5-3.2
Compacting
SB-6-3.3
Compaction Requirements
SB-6-3.4
Trial Sections
SB-7-3.5
Tolerance
SB-7-3.6
Acceptance Sampling and Testing
SB-7-4
ITEM BC-1
BC-1-1
DESCRIPTION
BC-1-2
MATERIAL REQUIREMENTS
BC-2-3.1
BC-4-3
CONSTRUCTION REQUIREMENTS
BC-4-3.1
Spreading
BC-4-3.2
Compacting
ITEM BC-2
BC-4-1
DESCRIPTION
BC-4-2
MATERIAL REQUIREMENT
BC-5-3
CONSTRUCTION REQUIREMENTS
BC-5-3.1
Equipments
BC-5-3.2
Surface Preparation
BC-5-3.3
Spreading and Compaction
BC-6-4
COMPACTION
BASE)
BC-6-4.1
BC-6-4.2
BC-7-4.3
BC-7-5
PART 3
ITEM SP
SP-1-1
GENERAL
SP-2-2
ASPHALTIC MATERIALS
SP-2-3
ASPHALT CEMENT
SP-3-3.1
Cut-back Asphalt
SP-3-4
APPLICATION TEMPERATURES
ITEM SP1
SP-9-1
DESCRIPTION
SP-9-2
MATERIAL REQUIREMENTS
SP-9-3
CONSTRUCTION REQUIREMENTS
SP-9-3.1
Equipment
SP-10-3.2
Application of asphaltic Material
SP-10-4
ITEM SP2
SP-11-1DESCRIPTION
SP-11-2MATERIAL REQUIREMENTS
SP-11-3CONSTRUCTION REQUIREMENTS
SP-11-3.1
EQUIPMENT
SP-11-3.2
SP-12-4
ITEM SP3
SP-13-1
DESCRIPTION
SP-13-2
MATERIAL REQUIREMENT
SP-13-2.1
Aggregate
SP-14-2.2
Asphaltic Material
SP-14-3
CONSTRUCTION REQUIREMENTS
SP-14-3.1
Equipment
SP-14-3.2
Application of Asphaltic materialSP
SP-15-3.3
Spreading of Aggregate
SP-15-4
SHOULDER TREATMENT
SP-15-4.1
Earthen Shoulders
SP-15-4.2
Gravel Shoulders
SP-16-4.3
Bituminous Treated Shoulders
SP-16-5
Method of Measurement
SP-18-6
BASIS OF PAYMENT
ITEM SP4
SP-19-1
DESCRIPTION
SP-19-2
MATERIAL REQUIREMENTS
SP-19-2.1
Aggregates
SP-21-2.2
Asphalt Material
SP-21-3
CONSTRUCTION REQUIREMENTS
SP-31-3.1
Equipment
SP-24-3.2
Special Requirements for Batching Plants
SP-25-3.3
Special Requirements for Continuous Mixing Plants
SP-26-3.4
Preparation of Aggregates
SP-26-3.5
Job-Mix-Formula
SP-26-3.6
Preparation and composition of the Mixture
SP-28-3.7
Transportation of Plant-Mixture
SP-28-3.8
Spreading and Compacting
SP-29-3.9
Requirement to the Mixture
SP-30-3.10
Pavement Thickness and Tolerances
SP-31-4
SP-31-5
QUALITY CONTROL
ITEM SPA-I
SPA-3
CONSTRUCTION REQUIREMENTS
SPA-3.1
Bituminous Mixing Plant
SPA-3.2
Preparation of Aggregates
SPA-3.3
Hauling Equipment
SPA-3.4
Bituminous Pavers
SPA-3.5
Rollers
SPA-3.6
Preparation of Base of Existing Pavement Surface
SPA-10-3.9
SPA-10-3.10
SPA-10-3.11
SPA-4
ITEM SPB
SPB-1-1
DESCRIPTION
SPB-1-2
MATERIAL REQUIREMENTS
SPB-1-2.1
Mineral Aggregates
SPB-2-2.2
Asphaltic Material
SPB-2-2.3
Asphalt Concrete Wearing Course Mixture
SPB-3-2.4
Job-Mix Formula
SPB-4-2.5
Asphalt Additives
SPB-5-3
CONSTRUCTION REQUIREMENTS
SPB-5-3.1
Preparation of Base Course Surface
SPB-5-3.2
Payment Thickness and Tolerances
SPB-5-3.3
Acceptance Sampling and Testing
SPB-6-4
PART 4
STRUCTURES
ITEM S
STRUCTURES
S-1-1
GENERAL DESCRIPTION
S-1-2
CLEARING OF SITE
S-2-3
FOUNDATION DATA
S-3-4
FINAL CLEARING
S-3-5
OPENING TO TRAFFIC
ITEM CO
CONCRETE
CO-1-1
DESCRIPTION
CO-1-1.1
Classes of Concrete
CO-2-2
MATERIAL REQUIREMENTS
CO-2-2.1
Portland Cement
CO-3-2.2
Fine Aggregate
CO-4-2.3
Coarse Aggregate
CO-5-2.4
Combined Aggregate
CO-6-2.5
Storage of Cement and Aggregates
CO-7-2.6
Water
CO-7-2.7
Admixtures
CO-8-3
CONSTRUCTION REQUIREMENTS
CO-8-3.1
Proportioning of Concrete
CO-9-3.2
Consistency
CO-9-3.3
Mixing Concrete
C0-11-3.4
Hauling of Mixed Concrete
CO-12-3.5
Handling and Placing Concrete
CO-15-3.6
Casting Sections and Construction joints
CO-20-3.7
Concrete Surface Finishing
CO-27-3.8
Curing Concrete
CO-31-3.9
Testing of Aggregates
CO-32-3.10
Testing of Compressive Strength
CO-33-4
ITEM CU
CURB
CU-1-1
DESCRIPTION.
CU-1-2
MATERIALS
CU-1-3
CONSTRUCTION REQUIREMENTS
CU-1-3.1
Stone Curbing
CU-2-3.2
Cast in Place Concrete Curbing or Curb and Gutter.
CU-4-3.3
Precast Concrete curbing
CU-4-4
METHOD OF MEASUREMENT
CU-4-5
BASES OF PAYMENT
ITEM PP
ITEM SE
SE-1-1
DESCRIPTION
SE-1-2
MATERIAL REQUIREMENTS
SE-1-2.1
Sweet Soil
SE-1-3
CONSTRUCTION REQUIREMENTS
SE-1-4
ITEM F
F-1-1
DESCRIPTION
F-1-2
MATERIAL REQUIREMENTS
F-1-3
CONSTRUCTION REQUIREMENTS
F-1-3.1 Falsework Design and Drawings
F-4-3.2 Falsework Construction
F-5-3.3 Removing Falsework
F-5-4
ITEM F1
FORMWORK
F-6-1
DESCRIPTION
F-6-2
MATERIAL REQUIREMENTS
F-6-3
CONSTRUCTION REQUIREMENTS
F-6-3.1 Formwork Design and Drawings
F-6-3.2 Formwork Construction
F-8-3.3 Removal of Formwork
F-10-4
ITEM ST
STEEL REINFORCEMENT
ST-1-1
DESCRIPTION
ST-1-2
MATERIAL REQUIREMENTS
ST-1-2.1
Bar Reinforcement
ST-2-2.2
Wire and Wire mesh
ST-2-2.3
Bar Mat Reinforcement
ST-2-2.4
Structural Shapes
ST-2-3
ST-3-3.2
CONSTRUCTION REQUIREMENTS
ST-2-3.1
Fabrication of Bent Bars
Placing and Fastening
ST-6-4
ITEM ST1
ST-9-1
DESCRIPTION
ST-9-2
MATERIAL REQUIREMENTS
ST-9-2.1
Prestressing Reinforcement Steel
ST-10-2.2
Testing
ST-11-2.3
Concrete
ST-11-2.4
Reinforcement Steel
ST-11-3CONSTRUCTION REQUIREMENTS
ST-11-3.0
General
ST-11-3.1
Prestressing Methods
ST-12-3.2
Prestressing Equipment
ST-12-3.3
Enclosures
ST-12-3.4
Placing Steel
ST-13-3.5
Placing Concrete
ST-13-3.6
Pretensioning
ST-14-3.7
Post-Tensioning
ST-15-3.8
Grouting of Bonded Steel
ST-15-3.9
Handling
ST-16-3.10
Curing Concrete
ST-16-4
ITEM J
J-1-1
DESCRIPTION
J-1-2
MATERIAL REQUIREMENTS
J-1-2.1
Concrete Joint Filler
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc
J-1-2.2
J-2-2.3
J-2-2.4
J-3-2.5
J-6-3
CONSTRUCTION REQUIREMENTS
J-6-3.1
Open Joints
J-6-3.2
Steel Joints
J-7-3.3
Steel Joints
J-7-3.4
Water Stops (Joint Seals)
J-8-3.5
Metal Bearing Devices
J-9-3.6
Elastomeric Bearing Pads
J-9-4
ITEM P
PILING
P-1-1
DESCRIPTION
P-1-2
MATERIAL REQUIREMENTS
P-2-3
CONSTRUCTION REQUIREMENTS
P-2-3.1
Location and Site Preparation
P-2-3.2
Pre-Piling or Foundation Exploratory Borings
P-2-3.3
Piles Cast-in-Place
P-4-3.4
Defective Piles
P-4-3.5
Load Tests
P-5-3.6
Pile Records
P-6-4
ITEM M
BRICK MASONARY
M-1-1
DESCRIPTION
M-1-2
MATERIAL REQUIREMENTS
M-1-2.1
Portland Cement
M-1-2.2
Sand
M-1-2.3
Water
M-1-2.4
Mortar
M-2-2.5
Bricks
M-2-3
CONSTRUCTION REQUIREMENTS
M-2-3.1
Mixing of Mortar
M-2-3.2
Brick Laying
M-3-3.3
Curing
M-3-4
ITEM M1
STONE MASONRY
M-4-1
DESCRIPTION
M-4-2
MATERIAL REQUIREMENTS
M-4-2.1
Rubble Stone
M-4-2.2
Mortar
M-4-3
CONSTRUCTION REQUIREMENTS
M-4-3.1
Stone Size
M-5-3.2
Headers
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc
M-5-3.3
M-5-3.4
M-6-3.5
M-6-3.6
Shaping Stone
laying Stone
Copings, Bridges Seats, and Backwalls
Arches
M-7-4
ITEM M2
CEMENT PLASTER
M-9-5
General
M-9-5.1
Materials
M-9-5.1.1
Cement
M-9-5.1.2
Sand.
M-9-5.1.3
Water
M-9-5.2
Mortar Composition
M-9-5.3
Material Batching
M-10-5.4
Application of Plaster
M-10-5.5
Measurement and Payment
M-10-5.5.1
Method of Measurement
M-10-5.5.2
Basis of Payment
ITEM PC
PC-1-1
DESCRIPTION
PC-1-2
MATERIAL REQUIREMENTS
PC-2-3
CONSTRUCTION REQUIREMENT
PC-2-3.1
Excavation
PC-2-3.2
Placing Pipe
PC-3-3.3
Backfilling
PC-3-4
ITEM PC1
PC-5-1
DESCRIPTION
PC-5-2
MATERIAL REQUIREMENTS
PC-5-3
CONSTRUCTION REQUIREMENTS
PC-5-4
ITEM W
W-1-1
DESCRIPTION
W-1-2
MATERIAL REQUIREMENTS
W-1-2.1
Formwork
W-1-2.2
Steel Reinforcement
W-1-2.3
Concrete
W-1-2.4
Brickwork and Cement Plaster
W-1-3
CONSTRUCTION REQUIREMENTS
W-1-3.1
Excavation
W-2-3.2
Granular Backfill
W-2-3.3
Formwork
W-2-3.4
Steel reinforcement
W-2-3.5
Concrete
W-2-3.6
Brickwork and Cement Plaster
W-2-4
ITEM W1
GABIONS
W-4-3.1
DESCRIPTION
W-4-3.2
MATERIAL REQUIREMENTS
W-4-3.3
General
W-4-3.4
Wire
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc
W-5-3.5
W-6-3.6
Fabrication
Rock Fill
W-6-4
CONSTRUCTION REQUIREMENTS
W-6-5
ITEM W2
RIPRAP
W-8-1
DESCRIPTION
W-8-2
MATERIAL REQUIREMENTS
W-8-2.1
Stones
W-9-2.2
Filter Material
W-9-2.3
Portland Cement
W-9-2.4
Fine Aggregates
W-10-3
CONSTRUCTION REQUIREMENTS
W-10-3.1
Excavation
W-10-3.2
Placing
W-11-3.3
Grouted Riprap
W-11-4
ITEM W3
W-13-1
DESCRIPTION
W-13-2
MATERIAL REQUIREMENTS
W-14-3
CONSTRUCTION REQUIREMENTS
W-14-3.1
Excavation
W-14-3.2
Placing
W-15-4
PART 5
ANCILLARY WORK
ITEM A
A-1
ANCILLARY WORK
ITEM A1
A-2-1
DESCRIPTION
A-2-2
MATERIAL REQUIREMENTS
A-2-2.1
Sign Panels
A-2-2.2
Reflective Sheeting
A-4-2.3
Metal Posts
A-4-2.4
Nuts and Bolts
A-4-2.5
Concrete Foundation Blocks
A-4-3
CONSTRUCTION REQUIREMENTS
A-4-3.1
Excavation and Backfilling
A-5-3.2
Erection of Posts
A-5-3.3
Sign Panel Installation
A-5-3.4
Sign faces
A-5-4
ITEM A2
PAVEMENT MARKING
A-8-1
DESCRIPTION
A-8-2
MATERIAL REQUIREMENT
A-8-2.1
Paint
A-10.2.2
Ballotini for Reflective Road Paint
A-10-2.3
Photometric Requirements for Reflective Road Paint
A-10
A-11-3
CONSTRUCTION REQUIREMENTS
A-11-4
A-11
ITEM A3
A-13-1
DESCRIPTION
A-13-2
MATERIAL REQUIREMENT
A-13-2.1
Concrete
A-13-2.2
Reinforcing Steel
A-13-3
CONSTRUCTION REQUIREMENTS
A-14-4
ITEM A4
A-15-1
A-15-2
DESCRIPTION
CONSTRUCTION REQUIREMENTS
A-15-3
ITEM A5
A-16-1
DESCRIPTION
A-16-1.1
General
A-16-1.2
Time for Completion
A-17-2
MATERIAL
A-17-3
ITEM A6
A-18-1
A-19-2
ITEM A7
A-20-1
DESCRIPTION
A-20-1.1
General
A-20-1.2
Delivery of Vehicles
A-20-1.3
Disposal of Vehicles
A-21-2
MATERIALS
A-21-3
MAINTENANCE REQUIREMENTS
A-21-4
ITEM A8
A-22-1
DESCRIPTION
A-22-2
MATERIALS
A-23-3
A-24-4
ITEM A9
A-24-1
DESCRIPTION
A-24-1.1
A-24-1.2
A-25-1.3
A-25-1.4
A-25-2
MATERIALS
A-25-3
CONSTRUCTION REQUIREMENTS
A-26-4
ITEMA10
A-27-1
DESCRIPTION
A-27-2
General
Temporary Traffic Control
Single-Lane Traffic Control
Project Information Signs