Anda di halaman 1dari 14

GENERAL

G-1-1

INTRODUCTION
G-1-1.1
G-1-1.2

General
Equivalency of Standards and Codes

G-2-2

SCOPE

G-2-3

DESIGNATION OF DOCUMENTS

G-2-4

ABBREVIATION AND DEFINITIONS


G-2-4.1
Abbreviations
G-4-4.2
Definitions

G-12-5

REFERENCES IN THE SPECIFICATION

G-12-6

CONTROL OF WORK
G-12-6.1
Inspection
G-13-6.2
Removal of Rejected and Unauthorized Work
G-13-6.3
Equipment and Plants

G-14-7

CONTROL OF MATERIALS
G-14-7.1
General
G-14-7.1.1
Source of Supply and Quality of Materials
G-15-7.1.2
Storage of Materials
G-15-7.1.3
Defective Materials
G-16-7.1.4
Trade Names and Alternatives
G-16-7.1.5
Certificates of Compliance
G-17-7.2
Local Materials
G-17-7.2.1
General
G-19-7.2.2
Possible Local Material Sources
G-21-7.3
Testing
G-21-7.3.1
General
G-22-7.3.2
Random Sampling Method

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

ART 1

EARTHWORK

ITEM E

GENERAL

E-1-1

SCOPE

E-1-2

SOIL INFORMATION

E-2-3

EXPLOSIVES

E-3-4

REMOVAL OF EXISTING OBSTRUCTIONS

E-3-5

REMOVAL OR DIVERSION OF WATER

E-4-6

DITCHES

E-4-7

EXCAVATION FOR CULVERTS

E-5-8

LANDSLIDES, BENCHES, FLATTENING OF SLOPES

E-5-9

SURVEY AND LEVELLING PRIOR TO COMMENCEMENT OF EARTHWORK

E-5-10

MEASUREMENT AND PAYMENT

ITEM CG

CLEARING & GRUBBING

CG-1-1

DESCRIPTION

CG-1-2

CONSTRUCTION REQUIREMENTS
CG-1-2.1
Clearing/Grubbing
CG-2-2.3
Protection and Restoration
CG-2-2.4
Backfilling of Holes

CG-2-3

MEASUREMENT AND PAYMENT

ITEM RT

REMOVAL OF TREES

RT-1-1

DESCRIPTION

RT-1-2

CONSTRUCTION REQUIREMENTS

RT-1-3

GENERAL REQUIREMENTS

RT-1-4

MEASUREMENT AND PAYMENT


RT-1-4.1
Measurement
Payment

ITEM C

COMPACTION OF NATURAL GROUND

C-1-1

DESCRIPTION

C-1-2

CONSTRUCTION REQUIREMENT
C-1-2.1
Compaction Requirements

C-1-3

MEASUREMENT AND PAYMENT

ITEM S

STRIPPING

S-1

DESCRIPTION

S-1-2

CONSTRUCTION REQUIREMENT

S-1-3

MEASUREMENT AND PAYMENT


S-1-3.1
Measurement
S-1-3.2
Payment

ITEM EX

CLASSIFICATION OF EXCAVATION

EX-1-1

ROADWAY EXCAVATION IN ALL TYPES OF SOILS


\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

EX-1-2

BORROW EXCAVATION
EX-2-3.1
Roadway Excavation in Common Materials
EX-2-3.2
Roadway Excavation in Rock Materials

ITEM EX1

EXCAVATION OF UNSUITABLE OR SURPLUS MATERIAL

EX-3-1

DESCRIPTION

EX-3-2

CONSTRUCTION REQUIREMENTS

EX-3-3

MEASUREMENT AND PAYMENT

ITEM EX2

STRUCTURAL EXCAVATION AND BACKFILL

EX-5-1

DESCRIPTION

EX-5-2

MATERIAL REQUIREMENTS
EX-5-2.1
Backfill

EX-5-3

CONSTRUCTION REQUIREMENTS
EX-5-3.1
Structural Excavation
EX-8-3.2
Backfill

EX-9-4

MEASUREMENT AND PAYMENT


EX-9-4.1
Measurement
EX-11-4.2
Payment

ITEM EM

FORMATION OF EMBANKMENT

EM-1-1

DESCRIPTION

EM-1-2

MATERIAL REQUIREMENTS

EM-2-3

CONSTRUCTION REQUIREMENTS
EM-2-3.1
Formation of Embankment with Common Material
EM-3-3.2
Formation of Embankment with Rock material
EM-4-3.3
Formation of Embankment on Steep Slopes
EM-4-3.4
Formation of Embankment on Existing Roads
EM-5-3.5
Construction of Embankment in Areas of High Water levels and
Salinity Conditions
EM-6-3.6
Trial Section
EM-6-3.7
Excavation in Embankments
EM-7-3.8
General Requirements

EM-8-4

MEASUREMENT AND PAYMENT


EM-8-4.1
Measurement
EM-8-4.2
Payment

ITEM SG

SUBGRADE PREPARATION

SG-1-1

DESCRIPTION

SG-1-2

CONSTRUCTION REQUIREMENTS
SG-1-2.1
Prior Works
SG-1-2.2
Compaction Requirements
SG-1-2.3
Subgrade Level in Earth Cut
SG-2-2.4
Subgrade Level in Rock Cut
SG-2-2.5
Subgrade Level in Embankment
SG-2-2.6
Protection of Completed Work
SG-3-2.7
Templates and Straightedges

SG-3-3

MEASUREMENT AND PAYMENT

ITEM-IG

IMPROVED SUBGRADE
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

IG-1-1

DESCRIPTION

IG-1-2

MATERIAL REQUIREMENTS

IG-1-3

CONSTRUCTION REQUIREMENTS
IG-1-3.1Preparation
IG-1-3.2Proportioning of Materials

IG-2-3.3

MIXING AND SPREADING

IG-3-3.4

COMPACTION

IG-3-3.5

TRIAL SECTIONS

IG-4-3.6

PROTECTION OF COMPLETED WORK

IG-4-3.7

TEMPLATES AND STRAIGHT EDGES

IG-4-3.8

TOLERANCE

IG-5-4

MEASUREMENT AND PAYMENT


IG-5-4.1
Measurement
IG-5-4.2
Payment

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

PART 2

SUB-BASE AND BASE

ITEM SB

GENERAL

SB-1-1

DESCRIPTION

SB-1-2

SAMPLING AND TESTING


SB-1-2.1
Selection of Samples for Testing
SB-1-2.2
Schedule for Sampling and Testing

SB-2-3

TOLERANCES

ITEM SB1

GRANULAR SUBBASE

SB-3-1

DESCRIPTION

SB-3-2

MATERIAL REQUIREMENTS

SB-4-3

CONSTRUCTION REQUIREMENTS
SB-4-3.1
Spreading
SB-5-3.2
Compacting
SB-6-3.3
Compaction Requirements
SB-6-3.4
Trial Sections
SB-7-3.5
Tolerance
SB-7-3.6
Acceptance Sampling and Testing

SB-7-4

MEASUREMENT AND PAYMENT


SB-7-4-1
Measurement
SB-7-4-2
Payment

ITEM BC-1

AGGREGATE BASE COURSE

BC-1-1

DESCRIPTION

BC-1-2

MATERIAL REQUIREMENTS

BC-2-3.1

FILLER FOR BLENDING

BC-4-3

CONSTRUCTION REQUIREMENTS
BC-4-3.1
Spreading
BC-4-3.2
Compacting

ITEM BC-2

CRUSHED STONE BASE COURSE

BC-4-1

DESCRIPTION

BC-4-2

MATERIAL REQUIREMENT

BC-5-3

CONSTRUCTION REQUIREMENTS
BC-5-3.1
Equipments
BC-5-3.2
Surface Preparation
BC-5-3.3
Spreading and Compaction

BC-6-4

COMPACTION
BASE)
BC-6-4.1
BC-6-4.2
BC-7-4.3

BC-7-5

REQUIREMENT (FOR BOTH AGGREGATE & CRUSHED STONE


Trial Sections
Tolerance
Acceptance Sampling and Testing

MEASUREMENT AND PAYMENT


BC-7-5.1
Measurement
BC-7-5.2
Payment

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

PART 3

SURFACE COURSES AND PAVEMENT

ITEM SP

SURFACE COURSES AND PAVEMENT

SP-1-1

GENERAL

SP-2-2

ASPHALTIC MATERIALS

SP-2-3

ASPHALT CEMENT
SP-3-3.1
Cut-back Asphalt

SP-3-4

APPLICATION TEMPERATURES

ITEM SP1

BITUMINOUS PRIME COAT

SP-9-1

DESCRIPTION

SP-9-2

MATERIAL REQUIREMENTS

SP-9-3

CONSTRUCTION REQUIREMENTS
SP-9-3.1
Equipment
SP-10-3.2
Application of asphaltic Material

SP-10-4

MEASUREMENT AND PAYMENT

ITEM SP2

BITUMINOUS TACK COAT

SP-11-1DESCRIPTION
SP-11-2MATERIAL REQUIREMENTS
SP-11-3CONSTRUCTION REQUIREMENTS
SP-11-3.1

EQUIPMENT

SP-11-3.2

APPLICATION OF ASPHALTIC MATERIAL

SP-12-4

MEASUREMENT AND PAYMENT

ITEM SP3

BITUMINOUS SURFACE TREATMENT AND SEAL COAT

SP-13-1

DESCRIPTION

SP-13-2

MATERIAL REQUIREMENT
SP-13-2.1
Aggregate
SP-14-2.2
Asphaltic Material

SP-14-3

CONSTRUCTION REQUIREMENTS
SP-14-3.1
Equipment
SP-14-3.2
Application of Asphaltic materialSP
SP-15-3.3
Spreading of Aggregate

SP-15-4

SHOULDER TREATMENT
SP-15-4.1
Earthen Shoulders
SP-15-4.2
Gravel Shoulders
SP-16-4.3
Bituminous Treated Shoulders
SP-16-5
Method of Measurement
SP-18-6
BASIS OF PAYMENT

ITEM SP4

ASPHALT CONCRETE PAVEMENT - PLANT MIX

SP-19-1

DESCRIPTION

SP-19-2

MATERIAL REQUIREMENTS
SP-19-2.1
Aggregates
SP-21-2.2
Asphalt Material

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

SP-21-3

CONSTRUCTION REQUIREMENTS
SP-31-3.1
Equipment
SP-24-3.2
Special Requirements for Batching Plants
SP-25-3.3
Special Requirements for Continuous Mixing Plants
SP-26-3.4
Preparation of Aggregates
SP-26-3.5
Job-Mix-Formula
SP-26-3.6
Preparation and composition of the Mixture
SP-28-3.7
Transportation of Plant-Mixture
SP-28-3.8
Spreading and Compacting
SP-29-3.9
Requirement to the Mixture
SP-30-3.10
Pavement Thickness and Tolerances

SP-31-4

MEASUREMENT AND PAYMENT

SP-31-5

QUALITY CONTROL

ITEM SPA-I

ASPHALT BASE COURSE PLANT MIX


SPA-2.5
Asphalt Additives:

SPA-3

CONSTRUCTION REQUIREMENTS
SPA-3.1
Bituminous Mixing Plant
SPA-3.2
Preparation of Aggregates
SPA-3.3
Hauling Equipment
SPA-3.4
Bituminous Pavers
SPA-3.5
Rollers
SPA-3.6
Preparation of Base of Existing Pavement Surface

SPA-10-3.9

FREQUENCY OF TESTING FOR CORES

SPA-10-3.10

PAVEMENT THICKNESS AND TOLERANCES

SPA-10-3.11

ACCEPTANCE SAMPLING AND TESTING


SPA-11-3.12
Weather Limitations

SPA-4

MEASUREMENT AND PAYMENT


SPA-4.1
Measurement
SPA-11-4.2
Payment

ITEM SPB

ASPHALT CONCRETE WEARING COURSE - PLANT MIX

SPB-1-1

DESCRIPTION

SPB-1-2

MATERIAL REQUIREMENTS
SPB-1-2.1
Mineral Aggregates
SPB-2-2.2
Asphaltic Material
SPB-2-2.3
Asphalt Concrete Wearing Course Mixture
SPB-3-2.4
Job-Mix Formula
SPB-4-2.5
Asphalt Additives

SPB-5-3

CONSTRUCTION REQUIREMENTS
SPB-5-3.1
Preparation of Base Course Surface
SPB-5-3.2
Payment Thickness and Tolerances
SPB-5-3.3
Acceptance Sampling and Testing

SPB-6-4

MEASUREMENT AND PAYMENT


SPB-6-4.1
Measurement
SPB-6-4.2
Payment

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

PART 4

STRUCTURES

ITEM S

STRUCTURES

S-1-1

GENERAL DESCRIPTION

S-1-2

CLEARING OF SITE

S-2-3

FOUNDATION DATA

S-3-4

FINAL CLEARING

S-3-5

OPENING TO TRAFFIC

ITEM CO

CONCRETE

CO-1-1

DESCRIPTION
CO-1-1.1
Classes of Concrete

CO-2-2

MATERIAL REQUIREMENTS
CO-2-2.1
Portland Cement
CO-3-2.2
Fine Aggregate
CO-4-2.3
Coarse Aggregate
CO-5-2.4
Combined Aggregate
CO-6-2.5
Storage of Cement and Aggregates
CO-7-2.6
Water
CO-7-2.7
Admixtures

CO-8-3

CONSTRUCTION REQUIREMENTS
CO-8-3.1
Proportioning of Concrete
CO-9-3.2
Consistency
CO-9-3.3
Mixing Concrete
C0-11-3.4
Hauling of Mixed Concrete
CO-12-3.5
Handling and Placing Concrete
CO-15-3.6
Casting Sections and Construction joints
CO-20-3.7
Concrete Surface Finishing
CO-27-3.8
Curing Concrete
CO-31-3.9
Testing of Aggregates
CO-32-3.10
Testing of Compressive Strength

CO-33-4

MEASUREMENT AND PAYMENT

ITEM CU

CURB

CU-1-1

DESCRIPTION.

CU-1-2

MATERIALS

CU-1-3

CONSTRUCTION REQUIREMENTS
CU-1-3.1
Stone Curbing
CU-2-3.2
Cast in Place Concrete Curbing or Curb and Gutter.
CU-4-3.3
Precast Concrete curbing

CU-4-4

METHOD OF MEASUREMENT

CU-4-5

BASES OF PAYMENT

ITEM PP

RCC PROTECTIVE POLES AT STREET DEAD END

ITEM SE

LANDSCAPING AND SWEET EARTH FILLING

SE-1-1

DESCRIPTION

SE-1-2

MATERIAL REQUIREMENTS
SE-1-2.1
Sweet Soil

SE-1-3

CONSTRUCTION REQUIREMENTS

SE-1-4

MEASUREMENT AND PAYMENT

ITEM F

FALSEWORK AND CENTERING FOR BRIDGES


\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

F-1-1

DESCRIPTION

F-1-2

MATERIAL REQUIREMENTS

F-1-3

CONSTRUCTION REQUIREMENTS
F-1-3.1 Falsework Design and Drawings
F-4-3.2 Falsework Construction
F-5-3.3 Removing Falsework

F-5-4

MEASUREMENT AND PAYMENT

ITEM F1

FORMWORK

F-6-1

DESCRIPTION

F-6-2

MATERIAL REQUIREMENTS

F-6-3

CONSTRUCTION REQUIREMENTS
F-6-3.1 Formwork Design and Drawings
F-6-3.2 Formwork Construction
F-8-3.3 Removal of Formwork

F-10-4

MEASUREMENT AND PAYMENT

ITEM ST

STEEL REINFORCEMENT

ST-1-1

DESCRIPTION

ST-1-2

MATERIAL REQUIREMENTS
ST-1-2.1
Bar Reinforcement
ST-2-2.2
Wire and Wire mesh
ST-2-2.3
Bar Mat Reinforcement
ST-2-2.4
Structural Shapes

ST-2-3
ST-3-3.2

CONSTRUCTION REQUIREMENTS
ST-2-3.1
Fabrication of Bent Bars
Placing and Fastening

ST-6-4

MEASUREMENT AND PAYMENT

ITEM ST1

PRESTRESSED CONCRETE STRUCTURES

ST-9-1

DESCRIPTION

ST-9-2

MATERIAL REQUIREMENTS
ST-9-2.1
Prestressing Reinforcement Steel
ST-10-2.2
Testing
ST-11-2.3
Concrete
ST-11-2.4
Reinforcement Steel

ST-11-3CONSTRUCTION REQUIREMENTS
ST-11-3.0
General
ST-11-3.1
Prestressing Methods
ST-12-3.2
Prestressing Equipment
ST-12-3.3
Enclosures
ST-12-3.4
Placing Steel
ST-13-3.5
Placing Concrete
ST-13-3.6
Pretensioning
ST-14-3.7
Post-Tensioning
ST-15-3.8
Grouting of Bonded Steel
ST-15-3.9
Handling
ST-16-3.10
Curing Concrete
ST-16-4

MEASUREMENT AND PAYMENT

ITEM J

JOINTS AND BEARING DEVICES FOR CONCRETE

J-1-1

DESCRIPTION

J-1-2

MATERIAL REQUIREMENTS
J-1-2.1
Concrete Joint Filler
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

J-1-2.2
J-2-2.3
J-2-2.4
J-3-2.5

Steel for Deck Expansion Joint Seals


Elastomer for Deck Expansion Joint Seals
Metal Bearing Devices
Elastomeric Bearing Pads

J-6-3

CONSTRUCTION REQUIREMENTS
J-6-3.1
Open Joints
J-6-3.2
Steel Joints
J-7-3.3
Steel Joints
J-7-3.4
Water Stops (Joint Seals)
J-8-3.5
Metal Bearing Devices
J-9-3.6
Elastomeric Bearing Pads

J-9-4

MEASUREMENT AND PAYMENT


J-9-4.1
Filled concrete Joints
J-9-4.2
Steel Joints
J-9-4.3
Water Stops
J-9-4.4
Bearing Devices
J-10-4.5
Payment

ITEM P

PILING

P-1-1

DESCRIPTION

P-1-2

MATERIAL REQUIREMENTS

P-2-3

CONSTRUCTION REQUIREMENTS
P-2-3.1
Location and Site Preparation
P-2-3.2
Pre-Piling or Foundation Exploratory Borings
P-2-3.3
Piles Cast-in-Place
P-4-3.4
Defective Piles
P-4-3.5
Load Tests
P-5-3.6
Pile Records

P-6-4

MEASUREMENT AND PAYMENT


P-6-4.1
Measurement
P-7-4.2
Payment

ITEM M

BRICK MASONARY

M-1-1

DESCRIPTION

M-1-2

MATERIAL REQUIREMENTS
M-1-2.1
Portland Cement
M-1-2.2
Sand
M-1-2.3
Water
M-1-2.4
Mortar
M-2-2.5
Bricks

M-2-3

CONSTRUCTION REQUIREMENTS
M-2-3.1
Mixing of Mortar
M-2-3.2
Brick Laying
M-3-3.3
Curing

M-3-4

MEASUREMENT AND PAYMENT


M-3-4.1
Measurement
M-3-4.2
Payment

ITEM M1

STONE MASONRY

M-4-1

DESCRIPTION

M-4-2

MATERIAL REQUIREMENTS
M-4-2.1
Rubble Stone
M-4-2.2
Mortar

M-4-3

CONSTRUCTION REQUIREMENTS
M-4-3.1
Stone Size
M-5-3.2
Headers
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

M-5-3.3
M-5-3.4
M-6-3.5
M-6-3.6

Shaping Stone
laying Stone
Copings, Bridges Seats, and Backwalls
Arches

M-7-4

MEASUREMENT AND PAYMENT

ITEM M2

CEMENT PLASTER
M-9-5
General
M-9-5.1
Materials
M-9-5.1.1
Cement
M-9-5.1.2
Sand.
M-9-5.1.3
Water
M-9-5.2
Mortar Composition
M-9-5.3
Material Batching
M-10-5.4
Application of Plaster
M-10-5.5
Measurement and Payment
M-10-5.5.1
Method of Measurement
M-10-5.5.2
Basis of Payment

ITEM PC

CONCRETE CULVERT PIPES

PC-1-1

DESCRIPTION

PC-1-2

MATERIAL REQUIREMENTS

PC-2-3

CONSTRUCTION REQUIREMENT
PC-2-3.1
Excavation
PC-2-3.2
Placing Pipe
PC-3-3.3
Backfilling

PC-3-4

MEASUREMENT AND PAYMENT

ITEM PC1

BED TO CONCRETE PIPE CULVERTS

PC-5-1

DESCRIPTION

PC-5-2

MATERIAL REQUIREMENTS

PC-5-3

CONSTRUCTION REQUIREMENTS

PC-5-4

MEASUREMENT AND PAYMENT

ITEM W

HEADWALLS, WINGWALLS, PARAPETS, APRONS AND SIPHON INLET/OUTLETS

W-1-1

DESCRIPTION

W-1-2

MATERIAL REQUIREMENTS
W-1-2.1
Formwork
W-1-2.2
Steel Reinforcement
W-1-2.3
Concrete
W-1-2.4
Brickwork and Cement Plaster

W-1-3

CONSTRUCTION REQUIREMENTS
W-1-3.1
Excavation
W-2-3.2
Granular Backfill
W-2-3.3
Formwork
W-2-3.4
Steel reinforcement
W-2-3.5
Concrete
W-2-3.6
Brickwork and Cement Plaster

W-2-4

MEASUREMENT AND PAYMENT

ITEM W1

GABIONS

W-4-3.1

DESCRIPTION

W-4-3.2

MATERIAL REQUIREMENTS
W-4-3.3
General
W-4-3.4
Wire
\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

W-5-3.5
W-6-3.6

Fabrication
Rock Fill

W-6-4

CONSTRUCTION REQUIREMENTS

W-6-5

MEASUREMENT AND PAYMENT


W-7-5.1
Wire Mesh
W-7-5.2
Rock Fill

ITEM W2

RIPRAP

W-8-1

DESCRIPTION

W-8-2

MATERIAL REQUIREMENTS
W-8-2.1
Stones
W-9-2.2
Filter Material
W-9-2.3
Portland Cement
W-9-2.4
Fine Aggregates

W-10-3

CONSTRUCTION REQUIREMENTS
W-10-3.1
Excavation
W-10-3.2
Placing
W-11-3.3
Grouted Riprap

W-11-4

MEASUREMENT AND PAYMENT


W-11-4.1
Measurement
W-12-4.2
Payment

ITEM W3

HAND PACKED STONE

W-13-1

DESCRIPTION

W-13-2

MATERIAL REQUIREMENTS

W-14-3

CONSTRUCTION REQUIREMENTS
W-14-3.1
Excavation
W-14-3.2
Placing

W-15-4

MEASUREMENT AND PAYMENT


W-15-4.1
Measurement
W-15-4.2
Payment

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

PART 5

ANCILLARY WORK

ITEM A
A-1

ANCILLARY WORK

ITEM A1

TRAFFIC ROAD SIGNS

A-2-1

DESCRIPTION

A-2-2

MATERIAL REQUIREMENTS
A-2-2.1
Sign Panels
A-2-2.2
Reflective Sheeting
A-4-2.3
Metal Posts
A-4-2.4
Nuts and Bolts
A-4-2.5
Concrete Foundation Blocks

A-4-3

CONSTRUCTION REQUIREMENTS
A-4-3.1
Excavation and Backfilling
A-5-3.2
Erection of Posts
A-5-3.3
Sign Panel Installation
A-5-3.4
Sign faces

A-5-4

MEASUREMENT AND PAYMENT


A-6-3.5
Shop Drawings
A-6-3.5
Categories of Signs

ITEM A2

PAVEMENT MARKING

A-8-1

DESCRIPTION

A-8-2

MATERIAL REQUIREMENT
A-8-2.1
Paint
A-10.2.2
Ballotini for Reflective Road Paint
A-10-2.3
Photometric Requirements for Reflective Road Paint
A-10

A-11-3

CONSTRUCTION REQUIREMENTS

A-11-4
A-11

MEASUREMENT AND PAYMENT

ITEM A3

PRECAST CONCRETE KILOMETER POST AND GUIDE POST

A-13-1

DESCRIPTION

A-13-2

MATERIAL REQUIREMENT
A-13-2.1
Concrete
A-13-2.2
Reinforcing Steel

A-13-3

CONSTRUCTION REQUIREMENTS

A-14-4

MEASUREMENT AND PAYMENT

ITEM A4

MAINTENANCE OF WORKS FOR TWELVE MONTHS AFTER COMPLETION


(PERIOD OF MAINTENANCE)

A-15-1
A-15-2

DESCRIPTION
CONSTRUCTION REQUIREMENTS

A-15-3

MEASUREMENT AND PAYMENT

ITEM A5

PROVIDE AND EQUIP ENGINEER'S OFFICES, QUARTERS

A-16-1

DESCRIPTION
A-16-1.1
General
A-16-1.2
Time for Completion

A-17-2

MATERIAL

A-17-3

MEASUREMENT AND PAYMENT

ITEM A6

MAINTENANCE AND SERVICE OF ENGINEER'S BASE CAMP FACILITIES


\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

A-18-1

DESCRIPTION AND MAINTENANCE REQUIREMENTS


A-19-1.1
Disposal of Base Camp Facilities

A-19-2

MEASUREMENT AND PAYMENT

ITEM A7

SUPPLY AND MAINTENANCE OF VEHICLES FOR ENGINEER

A-20-1

DESCRIPTION
A-20-1.1
General
A-20-1.2
Delivery of Vehicles
A-20-1.3
Disposal of Vehicles

A-21-2

MATERIALS

A-21-3

MAINTENANCE REQUIREMENTS

A-21-4

MEASUREMENT AND PAYMENT

ITEM A8

TEMPORARY ROAD WORKS

A-22-1

DESCRIPTION

A-22-2

MATERIALS

A-23-3

CONSTRUCTION AND MAINTENANCE REQUIREMENTS

A-24-4

MEASUREMENT AND PAYMENT

ITEM A9

CONTROL AND PROTECTION OF TRAFFIC

A-24-1

DESCRIPTION
A-24-1.1
A-24-1.2
A-25-1.3
A-25-1.4

A-25-2

MATERIALS

A-25-3

CONSTRUCTION REQUIREMENTS

A-26-4

MEASUREMENT AND PAYMENT

ITEMA10

FINAL SITE CLEANUP

A-27-1

DESCRIPTION

A-27-2

MEASUREMENT AND PAYMENT

General
Temporary Traffic Control
Single-Lane Traffic Control
Project Information Signs

\\00\H\10000\100\245\10047\260\260\General Specifications TOC (251199). doc

Anda mungkin juga menyukai