DONE ON
Page 1
NEXT DUE
HT VCB
DATE :
WARNING - 1 : Utmost care / double check of isolation of 22kv feeder line clearance ( by
opening ab switch) at consumers two pole structure is absolutely neccessary carring out the
below said work
common looped wire should effectively connected to earth
qualified engineer preferably having 'c' license
S.NO
DONE ON
Page 2
NEXT DUE
HT 6 POLE
WARNING-1 :Utmost care / double check of isolation of 22kv feeder line clearance ( by opening
AB switch) at consumers six pole structure is absolutely necessary carrying out the
below said work
common looped wire should effectively connected to earth
engineer preferably having 'C' license
ATTENDED BY :
S.NO
DATE :
Page 3
NEXT DUE
TRANFORMER OLTC
ATTENDED BY :
DATE :
DONE ON
Page 4
NEXT DUE
MV 1 AND 2
WARNING - 1 : Utmost care / double check of isolation of 22kv feeder line clearance ( by opening ab
switch of transformer 1 & 2 ) at consumers two pole structure is absolutely necessary carrying out the
below said work
WARNING 2 : The following work must be carried out under the personal supervision of a qualified
engineer preferably having 'c' license
ATTENDED BY :
DATE :
DONE ON
Page 5
DUE ON
Sheet8
DATE
MV
CAPACITOR CAPCITOR
MCC 1 MCC 2 MCC 3 MCC 4 PANEL BANK 1
BANK 2
CLEANED BY
01/09/15
02/09/15
03/09/15
04/09/15
05/09/15
06/09/15
07/09/15
08/09/15
09/09/15
10/09/15
11/09/15
12/09/15
13/09/15
14/09/15
15/09/15
16/09/15
17/09/15
18/09/15
19/09/15
20/09/15
21/09/15
22/09/15
23/09/15
24/09/15
25/09/15
26/09/15
27/09/15
28/09/15
29/09/15
30/09/15
Page 6
Sheet6
01/09/15
02/09/15
03/09/15
04/09/15
05/09/15
06/09/15
07/09/15
08/09/15
09/09/15
10/09/15
11/09/15
12/09/15
13/09/15
14/09/15
15/09/15
16/09/15
17/09/15
18/09/15
19/09/15
20/09/15
21/09/15
22/09/15
23/09/15
24/09/15
25/09/15
26/09/15
27/09/15
28/09/15
29/09/15
30/09/15
Page 7
Sheet6
LEANED BY
Page 8
Sheet7
PSM 1
01/09/15
02/09/15
03/09/15
04/09/15
05/09/15
06/09/15
07/09/15
08/09/15
09/09/15
10/09/15
11/09/15
12/09/15
13/09/15
14/09/15
15/09/15
16/09/15
17/09/15
18/09/15
19/09/15
20/09/15
21/09/15
22/09/15
23/09/15
24/09/15
25/09/15
26/09/15
27/09/15
28/09/15
29/09/15
30/09/15
Page 9
Sheet9
DIESEL GENERATOR
DATE
DG-1 (725KVA)
01/09/15
02/09/15
03/09/15
04/09/15
05/09/15
06/09/15
07/09/15
08/09/15
09/09/15
10/09/15
11/09/15
12/09/15
13/09/15
14/09/15
15/09/15
16/09/15
17/09/15
18/09/15
19/09/15
20/09/15
21/09/15
22/09/15
23/09/15
24/09/15
25/09/15
26/09/15
27/09/15
28/09/15
29/09/15
30/09/15
DG 2 (650 KVA)
CLEANED BY
Page 10